The Complete Energy Toolkit

20 Powerful Calculators. One Platform. From solar sizing to hydrogen costs, we have the math to back your energy transition.

Solar Savings Estimator

Calculate ROI, payback period, and recommended system size for your home.

Launch Tool

Battery Backup Simulator

Simulate power outages and see how long your battery will last based on appliance usage.

Simulate Now

AC Sizing & Cost

Find the perfect BTU/Ton and calculate savings from Inverter technology.

Size AC

Appliance Audit

Discover which devices are draining your wallet with this energy vampire detector.

Check Cost

Home Energy Fusion

Model your entire energy life: Solar production, Battery storage, and EV charging all in one place.

Start Simulation

Bill Estimator

Predict your upcoming electricity bill based on meter readings and tiered rates.

Estimate Bill

Insulation ROI Calculator

Thermal Audit: Calculate the payback period and total annual savings from upgrading your home's insulation (walls/roof).

Start Audit

Window Upgrade ROI

Model the payback of upgrading glazing (single→double, double→triple) using U-values, HDD/CDD, HVAC performance, and energy prices.

Run ROI Model

Air Leakage Savings (ACH50)

Estimate savings and payback from air sealing using blower door ACH50, building volume, HDD/CDD, HVAC performance, and energy prices.

Estimate Savings

EV vs. Gas Comparison

Compare fuel and maintenance costs between electric and combustion vehicles.

Compare

EV Charging Time

Calculate how long it takes to charge your car on AC vs DC Fast Chargers.

Calculate Time

Range Planner

Will your battery survive the trip? Plan your EV journey with confidence.

Plan Trip

Home Charger ROI

Calculate the cost and return on investment of installing a Wallbox at home.

Calculate ROI

Corporate Carbon Audit

Measure Scope 1 & 2 emissions to build your company's Net Zero strategy.

Audit Now

Carbon Price Impact (ETS / Tax + CBAM)

Convert $/tCO₂ into direct energy price uplift (€/kWh, €/m³, €/L). Compare fuels and estimate CBAM cost exposure for EU exports.

Benchmark Impact

Building Energy Benchmark (EUI)

Calculate Energy Use Intensity (kWh/m²/year), compare against benchmarks by building type, and export a simple management PDF report.

Benchmark Now

Fleet Electrification Planner

Compare ICE vs partial EV vs full EV for fleets with CAPEX, OPEX, discounted TCO (NPV), payback, and CO2 reduction.

Plan Fleet

Power Factor Correction

Avoid utility penalties by calculating the capacitor bank size needed for your factory.

Optimize Power

Transformer Losses Calculator (Pro)

Nameplate/Test + Field modes. Interval-based annual kWh losses, cost, CO2, breakdown (P0 vs Pk·x²), weighted efficiency, and CSV/PDF export.

Analyze Losses

Data Center Heat Recovery & District Heating Simulator

Model waste heat capture + heat pump upgrade to district heating. Compare air vs liquid cooling source temperatures, COP, thermal output, net cashflow, LCOH, payback, Sankey + sensitivity, PDF export.

Simulate Recovery

Boiler & Steam Savings Suite

Estimate fuel, water, treatment, and CO2 savings from condensate return and boiler efficiency improvements—plus payback, charts, and PDF report export.

Analyze Steam

Motor & VFD Savings Master

Compare IE2→IE3→IE4 upgrades and VFD speed control vs throttle/damper using duty-cycle modeling, charts, CO2, payback, NPV, and PDF export.

Model Savings

Central Plant Optimizer (CHW + Steam)

Compare baseline vs optimized setpoints & control strategies for chilled water plants (chillers, pumps, towers) with optional steam module—duty profiles, part-load, kW/ton, savings, CO2, and PDF export.

Optimize Plant

Chiller Plant Efficiency Analyzer (Plant kW/ton)

Interval-based (hourly/daily/monthly) Plant kW/ton analysis for full chiller plants (chillers + CHW/CW pumps + tower fans + aux). Computes energy-weighted annual kW/ton, cost, flags, and CSV/PDF export.

Analyze Plant

Industrial Bill Optimizer (Demand Charges)

Optimize TOU tariffs + demand charges. Model peak shaving, load shifting, and demand ratchets with charts.

Optimize Bill

Industrial BESS Simulator (Peak Shaving + Arbitrage ROI)

Upload an hourly load (or generate a synthetic curve), dispatch batteries with SoC/C-rate limits, and estimate demand-charge savings + TOU arbitrage, ROI, payback, and 10-year NPV.

Simulate ROI

LED Retrofit Savings

See how much your warehouse or office can save by switching to LED lighting.

Calculate Savings

HVAC Lifecycle Cost

Compare long-term costs of VRF systems vs. traditional Chillers.

Compare Systems

Waste Heat Recovery

Estimate the energy potential from recycling industrial exhaust heat.

Analyze Heat

Industrial Energy Efficiency Hub

One-page factory audit: power factor correction + waste heat recovery + bill optimization in a single printable PDF report.

Run Audit

Factory Energy Audit Map (Interactive)

Visual industrial audit: hover/tap hotspots (boiler, compressor, stack, panel) to spot losses and open the right calculator or guide.

Explore Map

Waste-to-Energy Biogas Master

Convert organic waste (ton/day) into biogas (m³/day), electricity/heat (kWh), and estimate energy + CO₂ reductions with a printable report.

Run Biogas Model

Water & WWTP Energy Benchmark

Enter m³/day + kWh/m³ to calculate annual kWh/year, compare against global benchmarks by size/type, and generate a VFD/biogas/solar roadmap with PDF/CSV export.

Benchmark Now

Global Reliability Index

Proprietary score for grid stability, renewable penetration, and EV adoption across 50 countries for investment risk.

View Data

Global Energy Cost Index

Track LCOE vs LCOS across markets. A data-style dashboard for cost trends and storage break-even.

View Index

Solar Crypto Mining

Calculate Bitcoin mining profitability when powered by renewable energy.

Mine Green

LCOS Calculator

Levelized Cost of Storage: Analyze the true unit cost of storing energy over the battery's lifespan (essential for investors).

Analyze Cost

Next-Gen Battery Strategic Matrix (SSB vs Sodium-Ion)

Investor decision tool: choose market + timeline + priorities to score Solid-State vs Sodium-Ion (with LFP baseline). Verdict badge, radar chart, projected system cost, supply chain risk, PDF export.

Run Matrix

Green Hydrogen (LCOH)

Estimate the levelized cost of producing Hydrogen via electrolysis.

Calculate LCOH

AI Energy Advisor

Get a personalized energy strategy based on your unique profile using AI.

Ask AI

Wind Power Estimator

Calculate the potential energy output of a wind turbine at your location.

Estimate Power

Project Finance Model

Model Returns

LCOE Calculator

Levelized Cost of Energy: Compare the lifetime cost of different energy sources.

Analyze LCOE

Agri-Pump Sizing

Design a solar irrigation system. Calculate pump HP and array size.

Design System

Irrigation ROI Master

Estimate energy and water savings from upgrading irrigation pumps, piping losses, schedules, and solar pumping options with payback.

Run ROI

Farm Energy Profile & Solar Sizing

Generate a farm load profile (cooling, ventilation, lighting, pumps) for Dairy/Poultry/Greenhouse and size PV + batteries with a printable report.

Generate Profile

Compressed Air Cost Calculator

Calculate true operating cost of compressed air systems. Estimate leak losses, compressor efficiency, and annual energy savings potential.

Analyze System

Cable Sizing & Voltage Drop

Calculate optimal cable size and voltage drop for electrical installations. Supports single/three-phase AC and DC systems based on IEC/NEC.

Size Cable

CHP Cogeneration Feasibility

Evaluate Combined Heat and Power viability. Compare separate grid+boiler vs on-site cogeneration with payback and CO₂ analysis.

Evaluate CHP

Energy Unit Converter

Convert between kWh, BTU, MJ, therms, TOE, and more. Includes power, pressure, temperature, and CO₂ emission conversions.

Convert Units