Wind Power Estimator

Harness the breeze. Calculate how much power a turbine generates at your location.

Turbine Specs

Average Wind Speed 6 m/s
Requires at least 3-4 m/s to start.
Rotor Diameter 2 m
Blade span (Tip to Tip).
Turbine Efficiency 35%
Typical: 30-45% (Betz Limit is 59.3%)
Capacity Factor 30%
% of time wind is optimal (Onshore: 25-35%, Offshore: 40-55%)
0 W
Instant Output
~0 kWh / Year
The Power of the Cube:
Doubling wind speed (e.g., 5 to 10 m/s) increases power by 8 times! Location is everything.

Understanding Wind Physics

The power available in the wind is calculated by the formula: P = 0.5 × ρ × A × V³.