LED Retrofit Calculator

Upgrade your facility lighting. Calculate ROI and energy savings instantly.

Project Details

Office
8h/day
Retail
12h/day
Factory
24h/day
Incandescent
60W→9W
T8 Fluorescent
72W→18W
HID/Metal Halide
400W→100W
Current (Old)
New LED
Elec Rate ($/kWh)
Upgrade Cost ($)
$0
Annual Savings
Energy Saved 0 kWh/yr
CO2 Reduced 0 Tons/yr
ROI / Payback Period
0.8 Months
Add these savings to your ESG Report

Why LED Retrofits are a No-Brainer

Lighting typically accounts for 20-40% of a commercial building's electricity bill. Switching from fluorescent (T5/T8) or HID lamps to LED reduces this load by 50-80% while improving light quality.

Beyond energy, LEDs last 50,000+ hours compared to 10,000 hours for older bulbs, slashing maintenance costs—a factor this calculator treats as a bonus.