Building Energy Benchmark Dashboard

Calculate EUI (Energy Use Intensity) in kWh/m²/year, compare against benchmark ranges by building type, and generate a one-page management report.

Stepper

Building data

Building / portfolio name
Shown on the printed report.
Currency
Building type
Gross floor area

Benchmark data

Benchmark set
Default ranges are indicative screening benchmarks compiled from public sources (ENERGY STAR Portfolio Manager datasets, CIBSE TM46, ASHRAE guidance). Validate with your local code and climate.

Energy consumption

Annual electricitykWh/year
If you have monthly data, upload CSV below. The tool can auto-sum and fill this field.
Electricity tariff (optional)$/kWh
Used only to estimate annual cost. Leave 0 if unknown.

Monthly CSV upload (optional)

CSV filemonth,kWh
CSV examples: "Jan,75000" or "2025-01,75000". The tool sums the 2nd column (or any numeric column if needed).
Detected totalkWh

Results & report

This is a screening benchmark. For decision-grade benchmarking, normalize for climate, occupancy, operating hours, and fuel mix.