Inputs
ReadyFactory profile
Facility name
Shown on the printed report.
Currency
Electricity bill (quick model)
Monthly energy500,000
kWh
Peak demand1,200 kW
Fixed charge$1,500/mo
Demand charge$18/kW-mo
Energy pricing
Energy rate$0.110/kWh
Peak reduction15%
Peak shaving via control or storage (screening estimate).
Load shifting10%
Move on-peak production to off-peak (TOU only).
Bill CAPEX$0
Optional: automation / EMS / battery CAPEX.
Power factor correction
Active power load1,000
kW
PF10.70
PF2 target0.95
Voltage (L-L)400 V
kVA charge$15/kVA-mo
If your utility charges demand on kVA (or PF penalties).
PFC CAPEX$0
Waste heat recovery (screening)
Exhaust flow5,000
m³/hr
Inlet temp250°C
Exit temp140°C
Hours/year6,000
Fuel cost$8/MMBtu
WHR CAPEX$0