🚜 ☀️

Solar Pump Calculator

"Greening the Desert" starts here. Size your pump and panels to irrigate without diesel.

Field Data

Total vertical distance from water level to storage tank.
50m
Volume of water needed per day for your crops.
50
5.5h

Note: Calculation assumes 60% pump efficiency and standard friction losses.

FLOW RATE
Required Pump Power
0 HP
(0 kW)
Solar Array Size
0 kWp
~ 0 Panels (400W)
Saves ~0 Litres of Diesel / Year

Why Solar Pumping is the Future of Agriculture

For remote farms disconnected from the grid, the cost of diesel irrigation is the single largest operational expense. Solar water pumps (SWP) offer a "pay once, free forever" model.

Unlike batteries, solar pumps store water instead of electricity. By pumping water into an elevated tank during the day, you use gravity for irrigation at night, eliminating the need for expensive battery banks. This makes solar pumping one of the highest ROI applications in renewable energy.

Explore More

Farm House Power? Get a Quote