Inputs (Quick)
Baseline vs ImprovedCurrencyReporting
Operating hours (h/year)1–8760
Fuel typeDefaults HV + CO₂
Fuel unit labelFor report
Annual fuel consumptionUnits/year
Fuel priceCurrency/unit
Fuel heating value (MJ/unit)Editable
CO₂ factor (kg CO₂/unit fuel)Editable
Boiler efficiency baseline (%)50–98
Boiler efficiency target (%)50–98
Condensate return baseline (%)0–100
Condensate return target (%)0–100
Condensate temp (°C)0–200
Make-up water temp (°C)0–100
Water cost (per m³)Optional
Treatment cost (per m³ make-up)Optional
CAPEX (condensate project)Currency
CAPEX (boiler efficiency)Currency
Next patches: Advanced Mode, multi-scenario manager, charts, and one-click PDF export.
Results
Confidence: MediumAnnual savings (total)
—
Fuel + water + treatment
Fuel savings
—
—
Payback
—
Simple payback
| Metric | Baseline | Improved | Delta |
|---|
Report summary
—
Savings breakdown
Cumulative cashflow vs CAPEX