Air Leakage Savings Estimator

Translate blower door results (ACH50) into estimated annual HVAC savings from air sealing. This model uses building volume, HDD/CDD, HVAC performance, and energy prices to estimate Year-1 savings, simple payback, NPV, and IRR. Cooling is modeled as sensible conductive load; latent humidity effects are not included.

Inputs

Custom

Building dimensions

Floor area2,000 ft²
Enter conditioned floor area (not lot size).
Area unit
Avg. ceiling height8.0 ft
Used to estimate building volume.
Height unit

Air tightness (blower door)

Baseline ACH508.0
Blower door result at 50 Pa. Older homes can be 8–15; newer code homes often 3–5; high-performance < 2.
Target ACH504.0
Your expected post-sealing air tightness.
ACH50 → ACHnat divisor20
Rule-of-thumb conversion depends on exposure & stack/wind. Typical range 15–25. Higher divisor = lower natural infiltration.

Climate & HVAC

Heating degree days (HDD)4,500
Cooling degree days (CDD)1,100
Cooling COP3.2
Used to estimate cooling input energy from sensible load.
Heating system
AFUE0.92
Enter AFUE as a decimal (e.g., 0.92). For heat pumps enter COP (e.g., 3.0).
Electricity price ($/kWh)0.15
Gas price ($/therm)1.50
Used only if heating system is gas.

Project economics

Air sealing cost (capex)$2,200
Includes labor, materials, and diagnostic testing. Adjust to your quotes.
Escalation2.5%
Horizon15 yrs
Discount rate6.0%