Will you make it? Calculate your range based on speed and distance.
Need to charge along the way?
Calculate Charging TimeAerodynamic drag increases with the square of speed. This means driving at 130 km/h consumes significantly more energy than driving at 100 km/h. This calculator adjusts the rated range of your vehicle based on your speed and AC usage to give you a realistic prediction, helping you avoid being stranded.