The Complete Energy Toolkit
54 precision calculators engineered for utilities, project developers, industrial plants, and energy investors — covering solar, BESS, power grids, HVAC, hydrogen, and carbon economics.
Interactive Engineering & ROI Suite
54 Live WorkstationsGrid Capacity Upgrade Calculator
Calculate the hidden capacity, cost, and time savings of Grid-Enhancing Technologies (GETs) vs. building new transmission lines.
Solar Savings Estimator
Calculate ROI, payback period, and recommended system size for your home.
Battery Backup Simulator
Simulate power outages and see how long your battery will last based on appliance usage.
AC Sizing & Cost
Find the perfect BTU/Ton and calculate savings from Inverter technology.
Appliance Audit
Discover which devices are draining your wallet with this energy vampire detector.
Home Energy Fusion
Model your entire energy life: Solar production, Battery storage, and EV charging all in one place.
Bill Estimator
Predict your upcoming electricity bill based on meter readings and tiered rates.
Insulation ROI Calculator
Thermal Audit: Calculate the payback period and total annual savings from upgrading your home's insulation (walls/roof).
Window Upgrade ROI
Model the payback of upgrading glazing (single→double, double→triple) using U-values, HDD/CDD, HVAC performance, and energy prices.
Air Leakage Savings (ACH50)
Estimate savings and payback from air sealing using blower door ACH50, building volume, HDD/CDD, HVAC performance, and energy prices.
EV vs. Gas Comparison
Compare fuel and maintenance costs between electric and combustion vehicles.
EV Charging Time
Calculate how long it takes to charge your car on AC vs DC Fast Chargers.
Range Planner
Will your battery survive the trip? Plan your EV journey with confidence.
Home Charger ROI
Calculate the cost and return on investment of installing a Wallbox at home.
Corporate Carbon Audit
Measure Scope 1 & 2 emissions to build your company's Net Zero strategy.
Carbon Price Impact (ETS / Tax + CBAM)
Convert $/tCO₂ into direct energy price uplift (€/kWh, €/m³, €/L). Compare fuels and estimate CBAM cost exposure for EU exports.
Building Energy Benchmark (EUI)
Calculate Energy Use Intensity (kWh/m²/year), compare against benchmarks by building type, and export a simple management PDF report.
Fleet Electrification Planner
Compare ICE vs partial EV vs full EV for fleets with CAPEX, OPEX, discounted TCO (NPV), payback, and CO2 reduction.
Power Factor Correction
Avoid utility penalties by calculating the capacitor bank size needed for your factory.
Transformer Losses Calculator (Pro)
Nameplate/Test + Field modes. Interval-based annual kWh losses, cost, CO2, breakdown (P0 vs Pk·x²), weighted efficiency, and CSV/PDF export.
Data Center Heat Recovery & District Heating Simulator
Model waste heat capture + heat pump upgrade to district heating. Compare air vs liquid cooling source temperatures, COP, thermal output, net cashflow, LCOH, payback, Sankey + sensitivity, PDF export.
Boiler & Steam Savings Suite
Estimate fuel, water, treatment, and CO2 savings from condensate return and boiler efficiency improvements, plus payback, charts, and PDF report export.
Motor & VFD Savings Master
Compare IE2→IE3→IE4 upgrades and VFD speed control vs throttle/damper using duty-cycle modeling, charts, CO2, payback, NPV, and PDF export.
Central Plant Optimizer (CHW + Steam)
Compare baseline vs optimized setpoints & control strategies for chilled water plants (chillers, pumps, towers) with optional steam module, duty profiles, part-load, kW/ton, savings, CO2, and PDF export.
Chiller Plant Efficiency Analyzer (Plant kW/ton)
Interval-based (hourly/daily/monthly) Plant kW/ton analysis for full chiller plants (chillers + CHW/CW pumps + tower fans + aux). Computes energy-weighted annual kW/ton, cost, flags, and CSV/PDF export.
Industrial Bill Optimizer (Demand Charges)
Optimize TOU tariffs + demand charges. Model peak shaving, load shifting, and demand ratchets with charts.
Industrial BESS Simulator (Peak Shaving + Arbitrage ROI)
Upload an hourly load (or generate a synthetic curve), dispatch batteries with SoC/C-rate limits, and estimate demand-charge savings + TOU arbitrage, ROI, payback, and 10-year NPV.
LED Retrofit Savings
See how much your warehouse or office can save by switching to LED lighting.
HVAC Lifecycle Cost
Compare long-term costs of VRF systems vs. traditional Chillers.
Waste Heat Recovery
Estimate the energy potential from recycling industrial exhaust heat.
Industrial Energy Efficiency Hub
One-page factory audit: power factor correction + waste heat recovery + bill optimization in a single printable PDF report.
Factory Energy Audit Map (Interactive)
Visual industrial audit: hover/tap hotspots (boiler, compressor, stack, panel) to spot losses and open the right calculator or guide.
Waste-to-Energy Biogas Master
Convert organic waste (ton/day) into biogas (m³/day), electricity/heat (kWh), and estimate energy + CO₂ reductions with a printable report.
Water & WWTP Energy Benchmark
Enter m³/day + kWh/m³ to calculate annual kWh/year, compare against global benchmarks by size/type, and generate a VFD/biogas/solar roadmap with PDF/CSV export.
Global Reliability Index
Proprietary score for grid stability, renewable penetration, and EV adoption across 50 countries for investment risk.
Global Energy Cost Index
Track LCOE vs LCOS across markets. A data-style dashboard for cost trends and storage break-even.
Solar Crypto Mining
Calculate Bitcoin mining profitability when powered by renewable energy.
LCOS Calculator
Levelized Cost of Storage: Analyze the true unit cost of storing energy over the battery's lifespan (essential for investors).
Next-Gen Battery Strategic Matrix (SSB vs Sodium-Ion)
Investor decision tool: choose market + timeline + priorities to score Solid-State vs Sodium-Ion (with LFP baseline). Verdict badge, radar chart, projected system cost, supply chain risk, PDF export.
Green Hydrogen (LCOH)
Estimate the levelized cost of producing Hydrogen via electrolysis.
AI Energy Advisor
Get a personalized energy strategy based on your unique profile using AI.
Wind Power Estimator
Calculate the potential energy output of a wind turbine at your location.
Project Finance Model
LCOE Calculator
Levelized Cost of Energy: Compare the lifetime cost of different energy sources.
Agri-Pump Sizing
Design a solar irrigation system. Calculate pump HP and array size.
Irrigation ROI Master
Estimate energy and water savings from upgrading irrigation pumps, piping losses, schedules, and solar pumping options with payback.
Farm Energy Profile & Solar Sizing
Generate a farm load profile (cooling, ventilation, lighting, pumps) for Dairy/Poultry/Greenhouse and size PV + batteries with a printable report.
Compressed Air Cost Calculator
Calculate true operating cost of compressed air systems. Estimate leak losses, compressor efficiency, and annual energy savings potential.
Cable Sizing & Voltage Drop
Calculate optimal cable size and voltage drop for electrical installations. Supports single/three-phase AC and DC systems based on IEC/NEC.
CHP Cogeneration Feasibility
Evaluate Combined Heat and Power viability. Compare separate grid+boiler vs on-site cogeneration with payback and CO₂ analysis.
Energy Unit Converter
Convert between kWh, BTU, MJ, therms, TOE, and more. Includes power, pressure, temperature, and CO₂ emission conversions.
AI Power Readiness Index
Compare 22 global AI data center markets across grid queues, power pricing, interconnection timelines, and clean energy readiness.
Blackout Financial Loss Tracker
Quantify Value of Lost Load (VoLL), downtime costs, spoiled inventory, and backup power payback for industrial and commercial sites.
EU Data Centre Sustainability Calculator
Model EU Energy Efficiency Directive (EED) metrics: PUE, WUE, REF, ERF, and sustainability rating compliance for data centers.