Future Fuels & Mobility - Page 5

Comprehensive analysis of sustainable aviation fuels, hydrogen transport, maritime decarbonization, and breakthrough mobility technologies.

Hyperloop Energy Consumption: Theoretical vs Practical

Analyzing the energy economics of vacuum tube transport versus conventional high-speed rail and aviation.

Read Hyperloop Analysis

Autonomous Freight: Self-Driving Impact on EV Efficiency

How autonomous driving technology improves energy efficiency in electric freight operations.

Read Autonomous Freight Brief

Drone Delivery: Energy Efficiency vs Delivery Vans

Comparing kWh per package for aerial drones versus electric delivery vehicles in last-mile logistics.

Read Drone Logistics Study

Catenary Electric Trucks: Siemens eHighway Analysis

Overhead wire electrification for heavy freight corridors: infrastructure costs and efficiency gains.

Read eHighway Report

Wireless Charging for Electric Buses: Infrastructure ROI

Inductive charging economics for transit fleets: depot vs opportunity charging strategies.

Read Bus Charging Analysis

SOFC for Trucks: Efficiency Gains vs Durability

Solid oxide fuel cell technology for heavy-duty transport: 60%+ efficiency but thermal cycling challenges.

Read SOFC Truck Brief

Synthetic Diesel (e-Diesel): Drop-in Compatibility & Cost

Power-to-liquid diesel production economics and compatibility with existing infrastructure.

Read e-Diesel Analysis

Bio-LNG for Heavy Transport: Carbon Negative Potential

Manure-to-fuel pathways achieving negative lifecycle emissions for long-haul trucking.

Read Bio-LNG Report

LOHC: Transporting Hydrogen Safely

Liquid organic hydrogen carriers for ambient-condition H2 transport and storage economics.

Read LOHC Technology Brief

Heavy-Duty FCEVs: Hyundai XCIENT vs Nikola Tre

Head-to-head comparison of leading hydrogen fuel cell trucks: range, payload, and TCO analysis.

Read FCEV Truck Comparison

Railway Decarbonization: Battery vs Hydrogen Hydrail

Comparing BEMU and hydrogen trains for non-electrified rail lines: range, refueling, and infrastructure.

Read Rail Decarb Analysis

H2-ICE Engines: JCB & Toyota Heavy Duty Strategy

Hydrogen internal combustion engines as a bridge technology for construction and heavy equipment.

Read H2-ICE Strategy Brief

Nuclear Propulsion for Merchant Ships: SMRs at Sea

Small modular reactors for maritime: regulatory pathways, safety, and port access challenges.

Read Nuclear Maritime Brief

Green Ammonia Maritime Fuel: Safety & Engine Readiness

Ammonia as zero-carbon bunker fuel: toxicity protocols, engine modifications, and bunkering infrastructure.

Read Ammonia Shipping Report

Green Methanol for Shipping: Maersk's Bet

Maersk's methanol-fueled container ships: feedstock supply chains and scalability challenges.

Read Methanol Shipping Analysis

Electric VTOLs: Flying Taxis Energy Requirements

Battery energy density thresholds for urban air mobility and vertiport infrastructure planning.

Read eVTOL Analysis

Hydrogen Aviation: Liquid H2 vs Fuel Cell Powertrains

Airbus ZEROe concepts: comparing hydrogen combustion turbines with fuel cell electric propulsion.

Read H2 Aviation Brief

E-Kerosene (Power-to-Liquid): Unlimited Aviation Fuel

Synthetic jet fuel from renewable electricity and captured CO2: production costs and scaling pathways.

Read E-Kerosene Report

SAF Economics: HEFA vs Alcohol-to-Jet

Comparing sustainable aviation fuel pathways: feedstock availability, production costs, and airline adoption.

Read SAF Economics Brief

Portable Solar Generators: Jackery vs EcoFlow vs Bluetti

Comprehensive comparison of leading portable power stations for camping, RVs, and emergency backup.

Read Generator Comparison

Steam Trap Monitoring in Refineries: Wireless IoT Savings

How wireless IoT steam trap monitoring cuts fuel losses, reduces emissions, and improves boiler capacity in complex refinery networks.

Read Steam Trap Analysis

Electric Fracking Fleets (E‑Frac): Displacing Diesel

Benchmarking electric frac spreads against diesel fleets on fuel cost, emissions, and grid connection requirements in shale plays.

Read E‑Frac Fleet Report

Subsea Power Distribution: Long‑Stepout Remote Fields

Subsea MV power distribution for long-stepout offshore fields: capex, losses, and tie-back economics vs standalone platforms.

Read Subsea Power Brief

The Future of Gas Stations: Transitioning to EV Hubs

How forecourts evolve into EV charging hubs: fast-charger power levels, grid upgrades, and dwell-time revenue models.

Read EV Hub Transition Brief

Abandoned Oil Wells: Geothermal Retrofit Opportunities

Quantifying the potential to convert abandoned oil & gas wells into low-enthalpy geothermal heat sources by 2027.

Read Geothermal Wells Brief

Blue Hydrogen SMR Retrofits: Low‑Hanging Fruit

Cost and abatement economics of adding CO2 capture to existing SMR units for blue hydrogen production.

Read Blue Hydrogen Retrofit Analysis

Carbon‑Neutral LNG Cargoes: Standards & Verification

Tracing, offsetting, and certifying LNG cargoes as carbon‑neutral under emerging 2027 verification frameworks.

Read LNG Neutrality Brief

CO₂ Pipelines: Repurposing Gas Networks

Technical and regulatory considerations for repurposing natural gas pipelines to carry dense‑phase CO₂.

Read CO₂ Pipeline Report

Digital Oilfield: AI Emissions Monitoring & Optimization

Using AI and advanced sensing to monitor, predict, and reduce Scope 1 emissions across upstream assets.

Read Digital Oilfield Brief

Flaring Reduction & VRU Economics

Vapor recovery units, flare gas capture, and payback periods under tightening 2027 methane regulations.

Read Flaring Reduction Analysis

LDAR Programs: 2026 Regulatory Compliance Guide

Designing leak detection and repair (LDAR) programs to meet tightening methane performance standards.

Read LDAR Compliance Guide

Methane Leak Detection: Satellite vs Drone vs IoT

Cost and sensitivity comparison of aerial, satellite, and ground‑based IoT methane monitoring solutions.

Read Methane Detection Study

Non‑Metallic Pipes: Corrosion & Carbon Footprint

Evaluating composite and non‑metallic pipe systems to cut corrosion costs and embodied emissions.

Read Non‑Metallic Pipe Brief

Offshore Decommissioning: Rigs‑to‑Reefs vs Full Removal

Comparing cost, environmental impact, and liability of Rigs‑to‑Reefs programs versus full platform removal.

Read Decommissioning Options Brief

Offshore Platform Electrification with Subsea Cables

Electrifying offshore platforms from shore: subsea cable capex, emissions savings, and payback windows.

Read Platform Electrification Study

Produced Water Management: Green Hydrogen Re‑Use

Using treated produced water streams as feedstock for electrolysis and green hydrogen production.

Read Produced Water Re‑Use Brief

Refinery Energy Efficiency: Heat Integration & Pinch

Applying pinch analysis and heat integration to reduce fired heater duty and fuel consumption in refineries.

Read Refinery Efficiency Report

Biogas Upgrading: Membrane vs Water Scrubbing Costs

Side‑by‑side comparison of CAPEX, OPEX and methane slip for membrane upgrading versus classic water scrubbing lines.

Read Biogas Upgrading Brief

AD Market Outlook: Agricultural vs Municipal Feedstocks

How manure, crop residues and sewage sludge compete and complement each other in anaerobic digestion portfolios.

Read AD Market Outlook

WtE Incineration: Flue Gas Treatment & 2026 Standards

Stack emission limits, FGT train design and cost implications for next‑generation waste‑to‑energy plants.

Read WtE Emissions Brief

Landfill Gas to RNG: Pipeline Injection Economics

From flaring to renewable natural gas: compression, clean‑up and pipeline tie‑in costs for LFG projects.

Read LFG to RNG Analysis

Plastic Pyrolysis: Fuel Yield vs Circular Monomers

Yield splits, product quality and margin stacks for plastic waste pyrolysis across fuel and chemical routes.

Read Plastic Pyrolysis Study

HTL of Wet Biomass: Bio‑Crude Economics

Hydrothermal liquefaction of sludge, algae and wet residues: capex intensity and upgrading pathways to finished fuels.

Read HTL Economics Brief

Sustainable Biomass Pellets: Supply Chain Risks

Lessons from large pellet offtake portfolios: sourcing constraints, ESG scrutiny and counterparty risk.

Read Biomass Supply Chain Case

Biochar: Soil Carbon & Revenue Stacking

How biochar projects blend agronomic benefits, carbon removal credits and waste management fees.

Read Biochar Revenue Brief

Torrefaction Technology: Making Black Pellets

Process basics, fuel properties and co‑firing economics for torrefied biomass in legacy coal assets.

Read Torrefaction Brief

MSW Gasification: Syngas Uses & Costs

Where municipal waste gasification can compete with incineration and landfill in modern waste‑to‑X hubs.

Read MSW Gasification Brief

Lignin Valorization: From Boiler Fuel to Bio‑Batteries

How pulp mills turn lignin side‑streams into higher‑value chemicals, materials and bio‑battery components.

Read Lignin Valorization Brief

Sewage Sludge: WWTPs as Power Stations

How anaerobic digestion and CHP can move large wastewater plants toward electricity self‑sufficiency.

Read Sludge Energy Recovery Brief

MECs: Hydrogen from Wastewater

Microbial electrolysis cells as a niche route to combine wastewater treatment with small‑scale hydrogen production.

Read MEC Technology Brief

Used Cooking Oil (UCO): Global SAF Feedstock

Tracking competition, pricing and policy for UCO as a constrained feedstock for HEFA sustainable aviation fuel.

Read UCO Market Report

Bio‑LPG: Production Pathways & Market Potential

How bio‑LPG volumes from biorefineries and waste streams can decarbonise off‑grid heat markets.

Read Bio‑LPG Market Brief

Cellulosic Ethanol: 2nd‑Gen Biofuel Economics

Cost trajectories, learning curves and policy support needed for residue‑based ethanol to scale.

Read Cellulosic Ethanol Report

Wood‑Based Composites for Wind Blades

Bio‑based blade concepts aiming to cut lifecycle emissions and ease end‑of‑life disposal for wind farms.

Read Wood Blade Concepts Brief

Enzymatic Recycling of PET: Biological Solutions

Where enzyme‑based PET recycling fits versus mechanical and chemical routes in plastic circularity.

Read PET Enzymatic Recycling Brief

Integrated Biorefineries: Fuel, Heat & Chemicals

Configuring multi‑product biorefinery hubs that monetise power, heat and high‑value co‑products simultaneously.

Read Biorefinery Concepts Brief

The Future of Ethanol: From Fuel Additive to Feedstock

How ethanol’s role shifts from gasoline blendstock toward a platform chemical in low‑carbon value chains.

Read Ethanol Transition Brief
1 2 3 4 5 6 7