Market Insights & Research - Page 6

Standards-led analysis for carbon accounting, digital substations, and energy management systems.

GHG Protocol Updates 2026: Scope 2 & Scope 3 Accounting

A compliance-grade briefing on what is required today and what is proposed for 2026–2027.

Read GHG Protocol Brief

IEC 61850 Standard: Digital Substation Interoperability

Why IEC 61850 is an engineering operating model — not just a protocol selection.

Read IEC 61850 Deep-Dive

ISO 50001 ROI: Building an Audit-Ready EnMS

A practical view of EnMS governance, controls, and ROI logic for certification.

Read ISO 50001 ROI Guide

EPD: Environmental Product Declarations in Construction

Understanding the lifecycle impact and standardization of construction materials via EPDs.

Read EPD Guide

Euro 7 Standards: ICE Phase-Out & EV Adoption

A deep dive into the regulatory transition from Euro 6 to Euro 7 and its impact on the EV market.

Read Euro 7 Analysis

Hydrogen Guarantees of Origin: CertifHy & Green-e

Exploring the certification frameworks ensuring the 'color' and origin of hydrogen production.

Read Hydrogen Certification

IMO 2030-2050: Maritime Decarbonization Targets

Analyzing the International Maritime Organization's roadmap for reducing shipping emissions.

Read Maritime Roadmap

NEC 2026: Solar & Storage Installer Code Changes

Key electrical code updates installers must know for residential and commercial storage systems.

Read NEC 2026 Changes

TCFD vs. TNFD: Climate & Nature Disclosures

Comparing the two leading frameworks for environmental financial risk reporting.

Read Disclosure Comparison

UL 9540 vs. NFPA 855: Battery Fire Safety Standards

Navigating the critical safety requirements for BESS installations and thermal runaway prevention.

Read Safety Standards

Energy Security Strategies 2027: Supply Resilience & Geopolitical Risk

Market intelligence on strategic reserves sizing, LNG diversification economics, grid resilience investments, and supply chain risk mitigation through 2030.

Read Security Analysis

Grid Cyber Security 2027: Critical Infrastructure Protection

Comprehensive analysis of power grid cybersecurity: NERC CIP compliance costs, zero-trust architecture, state-sponsored threats, and incident response frameworks.

Read Cyber Intelligence

Precision Agriculture IoT: Energy Optimization Market Intelligence 2027

Market analysis of smart irrigation, soil sensors, and autonomous farming systems reducing energy consumption in global agriculture through 2030.

Read Agriculture Intelligence

Vertical Farming Energy Optimization: Market Intelligence 2027

Strategic analysis of controlled environment agriculture (CEA), LED-to-solar efficiency ratios, and energy cost economics for indoor vertical farms through 2030.

Read Vertical Farming Analysis

Circular Economy Business Models: Energy Equipment Revenue Strategies

Market intelligence on PSS implementation, second-life battery economics ($5-15/kWh certification), and revenue models achieving 12-18% IRR by 2030.

Read Circular Economy Analysis

Product-as-a-Service Energy Equipment: Economics & Implementation

Expert analysis of PaaS models: Solar-as-a-Service PPAs at $0.09-0.11/kWh, Battery-as-a-Service achieving 12-18% IRR, and CAPEX-OPEX transformation strategies.

Read PaaS Analysis

Metal-Air Batteries Comparison: Zinc, Aluminum, Lithium 2027-2035

Technology deep-dive comparing metal-air chemistries for ultra-long duration storage, EV range extension, and LCOS economics to 2035.

Read Battery Comparison

Lithium-Sulfur Batteries Market Intelligence 2027-2035

Market intelligence on Li-S batteries for EVs and aviation: energy density roadmaps, cost per kWh projections, and commercialization timelines to 2035.

Read Li-S Intelligence

Silicon Anode Battery Technology 2027-2035

Strategic analysis of silicon-based anode materials, their impact on lithium-ion energy density, cost per kWh, and commercialization pathways to 2035.

Read Silicon Anode Analysis

Agricultural Cold Chain Energy Efficiency: Post-Harvest Loss Reduction

Economic analysis of cold storage optimization, refrigeration system efficiency, and energy cost reduction strategies for agricultural supply chains.

Read Cold Chain Analysis

Agrivoltaics Market Intelligence & Economics 2025-2035

Market intelligence on dual-use solar farming: crop yield impacts, revenue stacking models, and LCOE economics for agricultural photovoltaics through 2035.

Read Agrivoltaics Intelligence

Aluminum-Air Batteries Market Intelligence 2027-2035

Technology and market analysis of aluminum-air batteries for EV range extension, backup power, and mechanically rechargeable energy storage through 2035.

Read Aluminum-Air Intelligence

Anaerobic Digestion Economic Analysis 2027-2035

Comprehensive techno-economic analysis of anaerobic digestion systems: feedstock optimization, biogas upgrading, and revenue models achieving 15-20% IRR.

Read Digestion Analysis

Battery Passport & Supply Chain Traceability: EU 2027 Compliance

Implementation guide for EU Battery Regulation digital passports: data requirements, blockchain integration, and compliance roadmaps for 2027 enforcement.

Read Passport Guide

E-Waste Rare Earth Recovery Economics 2035

Market intelligence on urban mining: rare earth extraction technologies, recovery costs per kg, and supply chain security strategies through 2035.

Read E-Waste Economics

Lithium & Cobalt Recycling Economics & Technology 2035

Technology deep-dive on battery recycling: hydrometallurgical vs pyrometallurgical processes, recovery rates, and closed-loop supply chain economics to 2035.

Read Recycling Economics

Onshore Wind Farm Economics 2026

Comprehensive economic analysis of onshore wind projects: LCOE trends, financing structures, and profitability forecasts through 2026.

Read Wind Economics

AI Energy Trading & Forecasting: Machine Learning Market Intelligence 2027-2035

Market intelligence on AI-powered energy trading algorithms, demand forecasting accuracy, and automated market optimization strategies through 2035.

Read AI Trading Intelligence

Wind Turbine Maintenance Strategies 2026

Strategic analysis of predictive maintenance, condition monitoring systems, and O&M cost optimization for wind turbine fleets through 2026.

Read Maintenance Strategies

Digital Twins Power Plants: Predictive Maintenance & Optimization 2027-2035

Technology deep-dive on digital twin implementation for power generation: asset performance optimization, predictive maintenance ROI, and operational efficiency gains to 2035.

Read Digital Twins Analysis
1 2 3 4 5 6 7