| Mechanism | Status | Authority | Effective Window | Key Threshold |
|---|---|---|---|---|
| CfD Allocation Round 6 (Pot 1: Solar & Onshore) Established Renewables 15-Year CPI Contracts |
Awarded (2026–2028 Delivery) | DESNZ / LCCC | Results 3 Sep 2024; Delivery Years 2026/27–2027/28 | Solar PV: 3,288.31 MW @ £50.07/MWh; Onshore Wind: 990.37 MW @ £50.90/MWh (2012 base) |
| CfD AR6 Pot 2 (Floating Wind & Tidal Stream) Emerging Marine Ringfence & FLOW |
Awarded (Active Pre-FID / Build) | DESNZ / LCCC | Results 3 Sep 2024; 15-year CPI term | Green Volt: 400.00 MW @ £139.93/MWh; Tidal: 28.00 MW (6 contracts) @ £172.00/MWh |
| CfD AR6 Pot 3 (Fixed Offshore & Permitted Reduction) New Capacity & AR4 Re-Bid Window |
Partially Active (Hornsea 4 Exited) | DESNZ / LCCC | Delivery Years 2027/28–2028/29; Hornsea 4 exit 7 May 2025 | New: 3,363.07 MW @ £58.87/MWh (£84.97/MWh in 2026); PR: 1,578.51 MW @ £54.23/MWh |
| Non-Delivery Disincentive & Supplier Obligation S.I. 2014/2014 & CfD Allocation Regulations |
Enacted & Enforced | LCCC / DESNZ | Active 2024–2026 (ILR quarterly resets) | Zero-hour negative IMRP suspension; site re-bid lockouts on failure; Q4 2026 ILR reset to £0.000/MWh |
AR6 bridged the blank AR5 offshore outcome (2023) and AR7's 20-year, 2024-price-base reset. After expanding the budget by £530 million in July 2024 to £1.555 billion (2011/12 prices), DESNZ cleared 131 contracts totaling 9,648.26 MW on 3 September 2024.
While our AR7–AR8 Offshore Wind CfD Dossier examines 20-year contracts and Clean Industry Bonus gating, AR6 stands apart for its Pot 1 and Pot 2 breadth: 93 solar PV projects (>5 MW) secured 3,288.31 MW at £50.07/MWh, alongside 22 onshore wind contracts totaling 990.37 MW at £50.90/MWh (2012 base). Energy from Waste with CHP, remote island wind, wave, and geothermal recorded zero cleared MW.
| Auction Pot & Technology | Contracts | Awarded MW | 2012 ASP Cap | Clearing Strike (2012 Base) | 2024 Clearing / 2026 LCCC Indexed |
|---|---|---|---|---|---|
| Pot 1: Solar PV (>5 MW) Delivery Years 2026/27 & 2027/28 |
93 | 3,288.31 MW | £61.00/MWh | £50.07/MWh | ~£69.87/MWh (2024) / ~£72.27/MWh (2026) |
| Pot 1: Onshore Wind (>5 MW) England, Scotland & Wales |
22 | 990.37 MW | £64.00/MWh | £50.90/MWh | ~£71.03/MWh (2024) / ~£73.47/MWh (2026) |
| Pot 2: Tidal Stream (Ringfenced) 5 sites across Wales & Scotland |
6 | 28.00 MW | £261.00/MWh | £172.00/MWh | ~£240.04/MWh (2024) / ~£248.25/MWh (2026) |
| Pot 2: Floating Offshore Wind Green Volt (Scottish North Sea) |
1 | 400.00 MW | £176.00/MWh | £139.93/MWh | ~£195.29/MWh (2024) / ~£201.97/MWh (2026) |
| Pot 2: Geothermal / Wave / ACT / EfW Eligible technologies with zero awards |
0 | 0.00 MW | £157–£257/MWh | No award | Unallocated in AR6 |
| Pot 3: Offshore Wind (New Capacity) Hornsea 4 (2,400 MW) & East Anglia Two (963.07 MW) |
2 | 3,363.07 MW | £73.00/MWh | £58.87/MWh | ~£82.16/MWh (2024) / £84.97/MWh (LCCC 2026) |
| Pot 3: Offshore Wind (Permitted Reduction) AR4 25% trim re-bids across 4 wind farms |
7 | 1,578.51 MW | £73.00/MWh | £54.23/MWh | ~£75.68/MWh (2024) / ~£78.27/MWh (2026) |
| Total AR6 Auction Outcome Gross cleared prior to May 2025 attrition |
131 | 9,648.26 MW | £1.555B Budget | 15-Year CPI Term | ~7,248.26 MW active post-Hornsea 4 exit |
Solar PV cleared 17.9% below its £61/MWh cap across sub-50 MW arrays and NSIPs such as 60 MW Horton Wood. Onshore wind cleared 20.5% beneath its £64/MWh cap, led by Scottish projects.
Tidal stream cleared 34% under the £261/MWh ASP at £172/MWh across HydroWing (10 MW), MeyGen (9 MW), Seastar (4 MW), Magallanes (3 MW), and Ocean Star Tidal (2 MW). Green Volt cleared 20.5% under its £176/MWh cap.
AR4 offshore winners holding £37.35/MWh awards trimmed up to 25% of AR4 capacity and re-bid at £54.23/MWh, lifting blended SPV cashflow enough to unlock FID on Inch Cape, Hornsea 3, and East Anglia Three.
DESNZ published AR6 prices in 2012 real terms, whereas LCCC settles every MWh in current nominal pounds after compounding twelve-plus years of CPI inflation.
Each April at the contract Indexation Anniversary, LCCC recalculates Adjusted Strike Prices for cumulative UK CPI inflation alongside Balancing Services Use of System (BSUoS) and Transmission Loss Multiplier (TLM) adjustments. At the September 2024 auction, the CPI factor (~1.396x) placed £58.87/MWh offshore wind near £82.16/MWh and £50.07/MWh solar near £69.87/MWh. By 2026, LCCC's live Schemes Register listed East Anglia Two and Hornsea Project Four at £84.97/MWh (1.443x over 2012), placing Pot 1 solar near £72.27/MWh and onshore wind near £73.47/MWh. To remove this 2012-base distortion, DESNZ re-based AR7 and AR8 to 2024 real terms alongside a 20-year offshore tenor.
UK CPI tracks consumer goods rather than marine steel, HVDC converters, or installation vessels. Between September 2024 and May 2025, specialised offshore CAPEX and capital costs moved faster than CPI, compressing pre-FID equity margins on fixed-real contracts.
LCCC funds net payouts via quarterly Interim Levy Rates (ILR) on GB suppliers under S.I. 2014/2014: Q1 2025 opened at £7.608/MWh, Q1 2026 rose to £10.576/MWh (TRA £332.5M), Q3 2026 was cut in-period to £2.068/MWh in August 2026, and Q4 2026 dropped to £0.000/MWh in November 2026.
Between January 2025 and late 2026, AR6's flagship portfolio diverged sharply between projects reaching construction and a 2.4 GW exit that removed a quarter of the round.
On 7 May 2025, Ørsted discontinued the 2,400 MW Hornsea 4 project in its AR6 form and terminated supply contracts, with formal LCCC register termination logged in July 2025. Ørsted cited supply-chain CAPEX escalation, higher capital costs, and execution risk that eroded equity value creation even at ~£84.97/MWh indexed pricing, absorbing break-away write-downs while preserving seabed rights, grid agreements, and its Development Consent Order.
| Project & Sponsor | AR6 Pot & MW | Strike Price (2012 / 2026) | 2025–2026 Contractual & Build Status | Commercial & Regulatory Driver |
|---|---|---|---|---|
| Hornsea 4 Ørsted (North Sea) |
Pot 3 New 2,400.00 MW |
£58.87 / £84.97 | Discontinued / Terminated Halted 7 May 2025; LCCC exit Jul 2025 |
Supply-chain CAPEX escalation & execution risk eroded equity returns; subject to NDD site re-bid lockouts |
| Hornsea 3 Ørsted (2.85+ GW total) |
Pot 3 PR 1,080.00 MW |
£54.23 / ~£78.27 | Active Offshore Construction Marine logistics & foundation build 2025–2026 |
Blended AR4 + AR6 PR revenue stabilised FID; dedicated vessels & aviation contracted into 2026 |
| East Anglia Two ScottishPower Renewables |
Pot 3 New 963.07 MW |
£58.87 / £84.97 | Construction Underway Substation civils 2025; HDD landfalls 2026 |
Sole surviving Pot 3 New build after Hornsea 4 exit; onshore cable corridor & crane orders progressing |
| Inch Cape ESB / Red Rock Renewables (1,080 MW) |
Pot 3 PR 266.00 MW |
£54.23 / ~£78.27 | Financial Close & Offshore Build £3.5B financial close 27 Jan 2025 |
AR6 Permitted Reduction slice closed the funding gap across the 1,080 MW Firth of Forth array |
| East Anglia Three ScottishPower / Iberdrola (1,400 MW) |
Pot 3 PR 158.90 MW |
£54.23 / ~£78.27 | Heavy Offshore Construction Commissioning ramp 2026 |
AR6 PR top-up complemented AR4 core CfD, keeping 1.4 GW East Anglian build on 2026 schedule |
| Moray West (String 9) Ocean Winds (Moray Firth) |
Pot 3 PR 73.50 MW |
£54.23 / ~£78.27 | Late-Stage / Operational Transition Delivery Year 2027/28 |
Targeted PR allocation supplemented merchant PPA and AR4 capacity on String 9 |
| Green Volt Flotation Energy / Vårgrønn |
Pot 2 FLOW 400.00 MW |
£139.93 / ~£201.97 | Pre-FID / Supply Chain Reservation 28x15 MW turbine & Aberdeen port deals 2026 |
World's largest commercial floating wind farm; backed by offshore oil-platform electrification demand |
| Pot 1 Solar PV Portfolio 93 Utility Solar SPVs (10–60 MW) |
Pot 1 Solar 3,288.31 MW |
£50.07 / ~£72.27 | Active Pre-Build & Grid Queue Delivery Years 2026/27 & 2027/28 |
Module price deflation improved equity IRR, though DNO/TNUoS connection dates govern energisation |
Hornsea 4's withdrawal spotlighted DESNZ's Non-Delivery Disincentive (NDD) rules: terminating before the Milestone Delivery Date triggers statutory site-exclusion penalties barring immediate re-entry for roughly 13 to 24 months (one to two cycles). Ørsted confirmed no immediate AR7 or AR8 re-bid, while DESNZ tightened DCO maturity and surrendered-capacity rules ahead of AR7–AR8 and Offshore Wind Marshalling Ports expansion.
Three commercial mechanics govern realised equity yield on AR6 portfolios relative to unsubsidised bilateral power contracts.
At ~£72/MWh in 2026 terms, Pot 1 solar CfDs rival 10-to-12-year corporate PPAs while avoiding buyer credit migration and post-year-10 merchant tail exposure. Model returns in the Solar Calculator and LCOE Calculator.
AR6 enforces zero-hour negative-price tolerance: whenever the GB day-ahead IMRP falls below £0/MWh in any hour, LCCC suspends top-up payments, creating an immediate curtailment or co-located storage signal.
CfD assets cannot stack the UK Capacity Market, sub-5 MW solar uses the Smart Export Guarantee (SEG), and North Sea sponsors benchmark AR6 against Belgium's Princess Elisabeth Zone.
Before secondary SPV acquisitions, equity committees should confirm 18-month Milestone Requirement satisfaction on the LCCC register, check Target Commissioning Window erosion against Longstop termination, and benchmark yield against our Solar Degradation, Onshore Wind, and Offshore Wind Economics studies.
All AR6 clearing prices, awarded megawatts, 2026 CPI-indexed strike prices, LCCC levy determinations, and Hornsea 4 contract-exit milestones are verified directly against official UK government, LCCC, and corporate regulatory filings as of November 2026.
Every clearing figure, CPI conversion factor, and post-award milestone in this dossier is anchored directly to primary DESNZ auction publications, LCCC counterparty registers, UK statutory instruments, and stock-exchange corporate disclosures. ESI strictly separates gross auction awards from active deliverable capacity.
| Mechanism | Status | Authority | Effective Window | Key Threshold |
|---|---|---|---|---|
| Energy Act 2013 & CfD (Allocation) Regulations 2014 AR6 Auction Clearing & NDD Enforcement |
Enacted & Active | UK Parliament / DESNZ | 3 Sep 2024 awards; 15-yr CfD tenor | 131 contracts / 9,648.26 MW cleared; NDD site lockout on breach |
| LCCC Strike Price Indexation & S.I. 2014/2014 Annual CPI Escalation & Supplier Obligation |
Active Settlement (2025–2026) | LCCC | Annual April indexation; quarterly ILR | £58.87 (2012) indexed to £84.97/MWh (2026); Q4 2026 ILR £0.000/MWh |
| AR6 Post-Award Attrition & FID Ledger Contract Delivery vs. Termination Tracking |
7.25 GW Active / 2.4 GW Exited | LCCC Register / Sponsors | Jan 2025–Nov 2026 milestones | Hornsea 4 (-2,400 MW) exited May/Jul 2025; Inch Cape FID Jan 2025 |
Connect AR6 auction clearing prices directly to engineering generation calculators, port constraints, and levelised cost benchmarks.