| Mechanism | Status | Authority | Effective Window | Key Threshold |
|---|---|---|---|---|
| Smart Export Guarantee (SEG) SI 2019/1005 · Supply Licence Condition 57 |
Active (Year 7: 2026-27) | Ofgem / DESNZ | 1 Apr 2026 to 31 Mar 2027 (Continuous Annual Cycle) | Suppliers >= 150,000 domestic customers; >0p/kWh floor; <= 5 MW (50 kW micro-CHP); SMETS2 + MCS + Export MPAN |
| Zero-Rate VAT on Solar & BESS SI 2024/24 · HMRC VAT Notice 708/6 |
0% Temporary Window | HM Treasury / HMRC | 1 Feb 2024 to 31 Mar 2027 (Reverts to 5% on 1 Apr 2027) | 0% VAT on residential & qualifying charitable PV, standalone/retrofit BESS, and smart diverters; 20% for commercial SMEs |
| Market-wide Half-Hourly Settlement MHHS · BSC Modification P478 |
Migration Phase (M14-M16) | Elexon / Ofgem | M14 Oct 2026 to M15 May 2027 (M16 Cutover Jul 2027) | ~75-80% meters migrated by Oct 2026; 100% target May 2027; settlement lag cut from 14 months to 4 months |
Asset owners evaluating UK behind-the-meter solar PV and battery storage (up to 5 MW) face a two-tier export market: modest open-market SEG tariffs required by statute versus higher commercial export tariffs gated behind tied electricity supply or supplier-installed hardware.
British Gas replaced its earlier Export and Earn Plus (15.1p/kWh) and Export and Earn Basic (6.4p/kWh) offers with a three-tier structure. British Gas electricity customers with systems up to 15 kW earn 12p/kWh on Export Premium (variable, no exit fees). Systems above 15 kW earn 8p/kWh on Export Extra, while non-supply customers receive 3p/kWh on the Standard SEG Tariff. Export Premium and Export Extra run as commercial export tariffs alongside its mandatory SEG licence duty.
In March 2026, Octopus Energy adjusted Outgoing Octopus from 15p/kWh to 12p/kWh (tied to Octopus import) and offers Prime Outgoing Octopus at 16p/kWh (16:00 to 19:00) and 9p/kWh off-peak. On Octopus Flux and Intelligent Octopus Flux, regional peak 16:00 to 19:00 export reaches ~25p to 32p/kWh alongside ~15p to 16p/kWh overnight import (02:00 to 05:00), though Intelligent Flux periodically pauses new sign-ups. E.ON Next pays 13p/kWh on Next Export Exclusive (v3) and 17.5p/kWh for E.ON-installed systems.
Selecting a 16.5p to 20p/kWh export rate without checking the paired import rate weakens unlevered payback. Exclusive export tiers often exclude low-cost EV or heat-pump import tariffs (such as E.ON Next Drive) or tie homes to variable import near Ofgem's Q4 2026 cap of 26.32p/kWh (rising to 32.69p/kWh in Q1 2027). Importing 3,500 kWh/year at a 4p/kWh markup costs £140/year, outweighing +£100/year gained from exporting 2,000 kWh at +5p/kWh.
| Supplier | Tied Import + Install Tariff | Tied Import-Only Tariff | Untied / Standalone SEG | Key Eligibility & Lock-In Rules |
|---|---|---|---|---|
| British Gas | No separate install-only tier | Export Premium: 12p/kWh (<=15 kW) Export Extra: 8p/kWh (>15 kW) |
Standard SEG: 3p/kWh | Variable rates, no exit fees. Replaced legacy Export and Earn Plus (15.1p) and Basic (6.4p). Export Premium/Extra operate under commercial export terms tied to BG electricity import. |
| Octopus Energy | Intelligent Octopus Flux: ~25p-32p/kWh peak (16:00-19:00, regional) | Outgoing Octopus: 12p/kWh flat Prime Outgoing: 16p peak / 9p off-peak Agile Outgoing: Half-hourly wholesale |
Standard SEG: 4.1p/kWh | Outgoing Octopus adjusted from 15p to 12p/kWh in March 2026. Intelligent Flux requires compatible battery API integration (Tesla, GivEnergy, SolarEdge, Enphase) and is subject to regional availability. |
| E.ON Next | Next Export Premium (v3): 17.5p/kWh (12m fixed) | Next Export Exclusive (v3): 13p/kWh (12m fixed) | Next Flex Export: ~6p/kWh (variable) | Premium requires system installation by E.ON Installation Services plus E.ON Next import. Exclusive (v3) excludes certain EV time-of-use import tariffs such as Next Drive. |
| EDF Energy | Export Exclusive 12m (v3): Up to 18p/kWh | Export 12m: 13p-15p/kWh (fixed) | SEG Export Variable: 3p-5.6p/kWh | Top 18p/kWh exclusive tier requires partnered or EDF-installed PV/BESS hardware alongside an active EDF domestic electricity import account. |
| OVO Energy | SEG Install Exclusive: 15p-20p/kWh | SEG Beyond Exclusive: 12p/kWh | Standard SEG: 4p/kWh | Install Exclusive is reserved for OVO electricity import customers whose solar PV and battery storage were both installed directly by OVO. |
| ScottishPower | SmartGen Premium Plus: 15p/kWh (variable) | SmartGen Premium: 12p/kWh (variable) | SmartGen Standard SEG: 6p/kWh | Premium Plus requires ScottishPower hardware installation and import supply; SmartGen Standard at 6p/kWh offers one of the higher untied statutory baselines. |
Note: UK retail export tariffs reprice frequently in line with forward wholesale baseload curves. Asset owners should confirm postcode-specific schedules directly with the licensee prior to switching import supply.
Enacted to replace the closed Feed-in Tariff (FIT) generation-and-deemed-export regime after March 2019, the Smart Export Guarantee shifts distributed generation from taxpayer-funded fixed subsidies to a market-settled supplier obligation overseen by Ofgem.
Under the Smart Export Guarantee Order 2019 (SI 2019/1005) and Electricity Supply Licence Condition 57, any GB supplier holding 150,000 or more domestic electricity customers on 31 December is a Mandatory SEG Licensee for the next SEG Year (1 April to 31 March); smaller suppliers may opt in voluntarily.
Obligated licensees must keep at least one tariff strictly above zero (>0p/kWh) in every settlement period, blocking zero or negative export charges during negative wholesale hours. Eligible technologies cap at 5 MW Total Installed Capacity (TIC) for solar PV, wind, hydro, and anaerobic digestion, and 50 kW TIC for micro-CHP. FIT-era systems cannot double-claim FIT export and SEG, though owners may opt out of deemed FIT export to take metered SEG while retaining FIT generation payments.
Ofgem's SEG Year 5 Annual Report (covering 1 April 2024 to 31 March 2025, published December 2025) documents a sharp acceleration in metered export volume and cash payouts across Great Britain, driven by solar-plus-battery adoption and half-hourly smart meter penetration.
Solar PV accounts for more than 99.9% of registered SEG installations. Periodic registry reconciliation explains the slight net count adjustment between Year 4 gross tallies and Year 5 active registrations even as exported GWh and total payouts surged.
Commercial and residential sponsors often lose three to six months of export revenue not because of supplier bottlenecks, but because of DNO Export MPAN delays, missing MCS/equivalent accreditation, or non-compliant hybrid battery metering.
| Compliance Layer | Statutory / Engineering Standard | Threshold & Technical Trigger | Commercial Impact on Project Cash Flow |
|---|---|---|---|
| DNO Fast-Track Connection | ENA Engineering Recommendation G98 | Up to 16A per phase: 3.68 kW (single-phase) or 11.04 kW (three-phase) aggregate AC inverter capacity. | Connect-and-notify process: installer commissions first and notifies the DNO within 28 days, avoiding pre-construction grid queues. |
| DNO Pre-Application Route | ENA Engineering Recommendation G99 (+ optional G100) | Aggregate inverter rating > 3.68 kW (1-phase) or > 11.04 kW (3-phase), up to 5 MW SEG ceiling. | Requires prior DNO engineering approval before energisation (typically 45 to 65 working days). G100 export limitation caps net grid export where approved by DNO, preserving larger array sizing for daytime self-consumption. |
| Installation Accreditation | MCS (or EN 45011 / ISO 17065 equivalent) | Mandatory for systems <= 50 kW (solar PV/wind) unless alternative equivalent proof is accepted; commercial 50 kW to 5 MW sites use Flexi-Orb / ISO 17065 / RO-equivalent routes. | Without a valid MCS certificate number and handover pack, obligated SEG licensees reject onboarding, stranding exported kWh unpaid. |
| Export Settlement Metering | SMETS2 (or AMR half-hourly) + Export MPAN | Half-hourly (30-minute) export register capability paired with a DNO-issued Export MPAN distinct from the Import MPAN. | Export MPAN issuance typically takes 2 to 6 weeks post-DNO notice; back-dated export payments before Export MPAN registration and meter opening reads are rarely recoverable. |
| Green vs Brown BESS Export | Ofgem SEG Storage Guidance | Mixed grid-charged + PV-charged BESS requires separation if supplier restricts SEG strictly to renewable ("green") generation. | Suppliers have no statutory duty to pay SEG on grid-imported ("brown") power discharged back out. Pure SEG accounts may require DC-coupled metering or disable forced grid-to-grid export; commercial ToU tariffs (e.g., Octopus Flux) voluntarily permit arbitrage. |
| Energy-Saving Materials VAT | SI 2024/24 & HMRC VAT Notice 708/6 | 0% VAT on residential & qualifying charitable solar PV and standalone/retrofit BESS until 31 March 2027; reverts to 5% on 1 April 2027. | Saves 5% to 20% upfront equity CAPEX on residential battery retrofits completed before 31 March 2027. Commercial non-charitable SME installations incur 20% VAT (recoverable if VAT-registered). |
DNOs assess G98/G99 thresholds using total AC inverter nameplate capacity across solar and AC-coupled batteries combined, not DC panel wattage. Adding an AC-coupled 3.68 kW battery inverter beside a 3.68 kW solar inverter raises aggregate AC capacity to 7.36 kW, requiring G99 pre-approval before commissioning.
Battery storage alone is ineligible under SI 2019/1005 unless co-located with qualifying low-carbon generation. Because suppliers claim REGOs on renewable exports, Ofgem guidance lets licensees exclude grid-charged ("brown") storage exports or require separate generation metering outside voluntary ToU tariffs.
Warehouses, farms, and industrial roofs up to 5 MW remain SEG-eligible, though commercial sponsors rarely rely on 3p to 6p/kWh untied SEG rates. Above 150 kW, owners typically pair half-hourly AMR metering with sleeved or private-wire PPAs, treating SEG strictly as a seasonal weekend floor.
Evaluating distributed solar and battery investments strictly on unlevered equity CAPEX payback, avoided retail import tariffs remain the dominant driver of asset yield, even as peak-window export and 0% VAT battery retrofits narrow payback timelines ahead of April 2027.
For Q4 2026 (1 October to 31 December 2026), Ofgem's default Standard Variable Tariff electricity unit rate stands at 26.32p/kWh (54.83p/day standing charge), with Ofgem projecting a Q1 2027 rise to 32.69p/kWh. Displacing 1 MWh of grid import delivers £263.20 in direct bill avoidance today, compared with £120.00 at a 12p/kWh tied export tariff (British Gas Export Premium or Outgoing Octopus) or just £30.00 to £60.00 on an untied 3p to 6p/kWh SEG tariff. Consequently, sizing a BESS to maximize behind-the-meter self-consumption yields more than double the per-kWh economic return of flat-rate grid export.
Under SI 2024/24, electrical storage batteries installed either standalone or retrofitted to an existing PV array qualify for 0% VAT on residential and eligible charitable properties until 31 March 2027. On a £6,000 turnkey 10 kWh residential battery retrofit, completing commissioning before the March 2027 sunset saves £300 immediately relative to the scheduled 5% rate on 1 April 2027 (and £1,200 relative to the legacy 20% pre-2024 rate on standalone batteries). Combining daytime PV shifting with peak 16:00 to 19:00 Flux or Prime Outgoing export further compresses unlevered equity payback without relying on external borrowing.
Great Britain's Market-wide Half-Hourly Settlement (MHHS) programme, delivered by Elexon, moves retail billing from estimated load profiles to actual 30-minute smart-meter settlement. Following system go-live in late 2025 (M10) and formal supplier/DSO qualification in October 2026 (M14, with roughly 75% to 80% of meters migrated), full industry migration completes in May 2027 (M15) before the settlement reconciliation timeline compresses from 14 months to 4 months in July 2027 (M16). Faster settlement cuts supplier working-capital risk and widens availability of half-hourly export tariffs aligned with evening grid peaks.
Launched by DESNZ in 2026, the multi-billion-pound Warm Homes Plan expands household and social-housing deployment of rooftop solar PV, heat pumps, and behind-the-meter battery storage alongside community energy initiatives. As millions of additional residential roofs enter the grid through 2030, midday solar saturation in distribution networks will place downward pressure on flat daytime export rates while increasing the value of evening-window (16:00 to 19:00) battery discharge under MHHS-enabled tariffs.
All statutory boundaries, Year 5 SEG settlement figures, DNO thresholds, and 2026 supplier tariffs in this dossier are verified directly against primary UK registries and licensee publications. Accessed and verified November 2026.
Every statutory status, tariff tier, Ofgem telemetry figure, and tax cutoff in this briefing is anchored directly to UK Statutory Instruments, Ofgem compliance reports, Elexon settlement documentation, and live supplier tariff schedules cited above. ESI separates enacted statutory obligations from discretionary retail tariff pricing.
Connect UK Smart Export Guarantee tariff rules directly to behind-the-meter sizing tools, battery storage cost models, and solar degradation benchmarks.