Tax Credits & Subsidies · United Kingdom · Verified Nov 2026

UK Smart Export Guarantee (SEG): 2026 Supplier Tariffs, SI 2019/1005 & 0% BESS VAT

Under the Smart Export Guarantee Order 2019 (SI 2019/1005), GB suppliers with at least 150,000 domestic electricity customers must offer at least one positive-rate (>0p/kWh) export tariff for MCS-certified generation up to 5 MW. In 2026, tied export rates reach 12p/kWh at British Gas (Export Premium, <=15 kW) and Octopus Energy (Outgoing Octopus), 13p to 17.5p/kWh at E.ON Next, and 15p to 20p/kWh on installer-tied offers, versus 3p to 6p/kWh untied.
SI 2019/1005 Active <= 5 MW Cap (50 kW Micro-CHP) 0% BESS VAT Until 31 Mar 2027
Primary sources: SI 2019/1005 · Ofgem SEG Year 5 Report · British Gas SEG Rates. Verified Nov 2026.
Mandatory Licensee Gate
150,000+
Domestic electricity customers (31 Dec test).
Year 5 SEG Payouts
£56.97M
443.1 GWh exported across 270,395 sites.
Tied vs Untied Spread
15.39p / 4.47p
Ofgem Year 5 averages (10.8p/kWh overall).
0% ESM VAT Cutoff
31 Mar 2027
Solar & standalone BESS revert to 5% Apr 2027.

Statutory & Fiscal Summary Matrix

Mechanism Status Authority Effective Window Key Threshold
Smart Export Guarantee (SEG)
SI 2019/1005 · Supply Licence Condition 57
Active (Year 7: 2026-27) Ofgem / DESNZ 1 Apr 2026 to 31 Mar 2027 (Continuous Annual Cycle) Suppliers >= 150,000 domestic customers; >0p/kWh floor; <= 5 MW (50 kW micro-CHP); SMETS2 + MCS + Export MPAN
Zero-Rate VAT on Solar & BESS
SI 2024/24 · HMRC VAT Notice 708/6
0% Temporary Window HM Treasury / HMRC 1 Feb 2024 to 31 Mar 2027 (Reverts to 5% on 1 Apr 2027) 0% VAT on residential & qualifying charitable PV, standalone/retrofit BESS, and smart diverters; 20% for commercial SMEs
Market-wide Half-Hourly Settlement
MHHS · BSC Modification P478
Migration Phase (M14-M16) Elexon / Ofgem M14 Oct 2026 to M15 May 2027 (M16 Cutover Jul 2027) ~75-80% meters migrated by Oct 2026; 100% target May 2027; settlement lag cut from 14 months to 4 months

British Gas Export Tariff vs Octopus, E.ON Next, EDF, OVO & ScottishPower

Asset owners evaluating UK behind-the-meter solar PV and battery storage (up to 5 MW) face a two-tier export market: modest open-market SEG tariffs required by statute versus higher commercial export tariffs gated behind tied electricity supply or supplier-installed hardware.

British Gas Export Tariff Structure (2026)

British Gas replaced its earlier Export and Earn Plus (15.1p/kWh) and Export and Earn Basic (6.4p/kWh) offers with a three-tier structure. British Gas electricity customers with systems up to 15 kW earn 12p/kWh on Export Premium (variable, no exit fees). Systems above 15 kW earn 8p/kWh on Export Extra, while non-supply customers receive 3p/kWh on the Standard SEG Tariff. Export Premium and Export Extra run as commercial export tariffs alongside its mandatory SEG licence duty.

Octopus, E.ON Next & Time-of-Use Arbitrage

In March 2026, Octopus Energy adjusted Outgoing Octopus from 15p/kWh to 12p/kWh (tied to Octopus import) and offers Prime Outgoing Octopus at 16p/kWh (16:00 to 19:00) and 9p/kWh off-peak. On Octopus Flux and Intelligent Octopus Flux, regional peak 16:00 to 19:00 export reaches ~25p to 32p/kWh alongside ~15p to 16p/kWh overnight import (02:00 to 05:00), though Intelligent Flux periodically pauses new sign-ups. E.ON Next pays 13p/kWh on Next Export Exclusive (v3) and 17.5p/kWh for E.ON-installed systems.

The Tied Import Spread Trap

Selecting a 16.5p to 20p/kWh export rate without checking the paired import rate weakens unlevered payback. Exclusive export tiers often exclude low-cost EV or heat-pump import tariffs (such as E.ON Next Drive) or tie homes to variable import near Ofgem's Q4 2026 cap of 26.32p/kWh (rising to 32.69p/kWh in Q1 2027). Importing 3,500 kWh/year at a 4p/kWh markup costs £140/year, outweighing +£100/year gained from exporting 2,000 kWh at +5p/kWh.

Supplier Tied Import + Install Tariff Tied Import-Only Tariff Untied / Standalone SEG Key Eligibility & Lock-In Rules
British Gas No separate install-only tier Export Premium: 12p/kWh (<=15 kW)
Export Extra: 8p/kWh (>15 kW)
Standard SEG: 3p/kWh Variable rates, no exit fees. Replaced legacy Export and Earn Plus (15.1p) and Basic (6.4p). Export Premium/Extra operate under commercial export terms tied to BG electricity import.
Octopus Energy Intelligent Octopus Flux: ~25p-32p/kWh peak (16:00-19:00, regional) Outgoing Octopus: 12p/kWh flat
Prime Outgoing: 16p peak / 9p off-peak
Agile Outgoing: Half-hourly wholesale
Standard SEG: 4.1p/kWh Outgoing Octopus adjusted from 15p to 12p/kWh in March 2026. Intelligent Flux requires compatible battery API integration (Tesla, GivEnergy, SolarEdge, Enphase) and is subject to regional availability.
E.ON Next Next Export Premium (v3): 17.5p/kWh (12m fixed) Next Export Exclusive (v3): 13p/kWh (12m fixed) Next Flex Export: ~6p/kWh (variable) Premium requires system installation by E.ON Installation Services plus E.ON Next import. Exclusive (v3) excludes certain EV time-of-use import tariffs such as Next Drive.
EDF Energy Export Exclusive 12m (v3): Up to 18p/kWh Export 12m: 13p-15p/kWh (fixed) SEG Export Variable: 3p-5.6p/kWh Top 18p/kWh exclusive tier requires partnered or EDF-installed PV/BESS hardware alongside an active EDF domestic electricity import account.
OVO Energy SEG Install Exclusive: 15p-20p/kWh SEG Beyond Exclusive: 12p/kWh Standard SEG: 4p/kWh Install Exclusive is reserved for OVO electricity import customers whose solar PV and battery storage were both installed directly by OVO.
ScottishPower SmartGen Premium Plus: 15p/kWh (variable) SmartGen Premium: 12p/kWh (variable) SmartGen Standard SEG: 6p/kWh Premium Plus requires ScottishPower hardware installation and import supply; SmartGen Standard at 6p/kWh offers one of the higher untied statutory baselines.

Note: UK retail export tariffs reprice frequently in line with forward wholesale baseload curves. Asset owners should confirm postcode-specific schedules directly with the licensee prior to switching import supply.

SI 2019/1005 Legal Mechanics & Ofgem Year 5 Performance

Enacted to replace the closed Feed-in Tariff (FIT) generation-and-deemed-export regime after March 2019, the Smart Export Guarantee shifts distributed generation from taxpayer-funded fixed subsidies to a market-settled supplier obligation overseen by Ofgem.

Mandatory Licensee Obligation & Positive Price Floor

Under the Smart Export Guarantee Order 2019 (SI 2019/1005) and Electricity Supply Licence Condition 57, any GB supplier holding 150,000 or more domestic electricity customers on 31 December is a Mandatory SEG Licensee for the next SEG Year (1 April to 31 March); smaller suppliers may opt in voluntarily.

Obligated licensees must keep at least one tariff strictly above zero (>0p/kWh) in every settlement period, blocking zero or negative export charges during negative wholesale hours. Eligible technologies cap at 5 MW Total Installed Capacity (TIC) for solar PV, wind, hydro, and anaerobic digestion, and 50 kW TIC for micro-CHP. FIT-era systems cannot double-claim FIT export and SEG, though owners may opt out of deemed FIT export to take metered SEG while retaining FIT generation payments.

Ofgem Year 4 vs Year 5 Market Expansion

Ofgem's SEG Year 5 Annual Report (covering 1 April 2024 to 31 March 2025, published December 2025) documents a sharp acceleration in metered export volume and cash payouts across Great Britain, driven by solar-plus-battery adoption and half-hourly smart meter penetration.

Year 5 Active Registrations (Mar 2025)270,395 sites
Year 4 Gross Registrations (Mar 2024)283,666 sites (~1,563.2 MW)
Year 5 Metered Electricity Exported443.1 GWh (+56.5% vs 283.1 GWh Yr 4)
Year 5 Total Generator Payouts£56.97M (+85.3% vs £30.75M Yr 4)
Year 5 Active Tariffs & Licensees50 tariffs across 11 licensees
Year 5 Volume / Tariff Rate Split10.8p avg (15.39p tied vs 4.47p untied)

Solar PV accounts for more than 99.9% of registered SEG installations. Periodic registry reconciliation explains the slight net count adjustment between Year 4 gross tallies and Year 5 active registrations even as exported GWh and total payouts surged.

G98 vs G99 Connection Limits, Green-Only BESS Rules & 0% VAT Cutoff

Commercial and residential sponsors often lose three to six months of export revenue not because of supplier bottlenecks, but because of DNO Export MPAN delays, missing MCS/equivalent accreditation, or non-compliant hybrid battery metering.

Compliance Layer Statutory / Engineering Standard Threshold & Technical Trigger Commercial Impact on Project Cash Flow
DNO Fast-Track Connection ENA Engineering Recommendation G98 Up to 16A per phase: 3.68 kW (single-phase) or 11.04 kW (three-phase) aggregate AC inverter capacity. Connect-and-notify process: installer commissions first and notifies the DNO within 28 days, avoiding pre-construction grid queues.
DNO Pre-Application Route ENA Engineering Recommendation G99 (+ optional G100) Aggregate inverter rating > 3.68 kW (1-phase) or > 11.04 kW (3-phase), up to 5 MW SEG ceiling. Requires prior DNO engineering approval before energisation (typically 45 to 65 working days). G100 export limitation caps net grid export where approved by DNO, preserving larger array sizing for daytime self-consumption.
Installation Accreditation MCS (or EN 45011 / ISO 17065 equivalent) Mandatory for systems <= 50 kW (solar PV/wind) unless alternative equivalent proof is accepted; commercial 50 kW to 5 MW sites use Flexi-Orb / ISO 17065 / RO-equivalent routes. Without a valid MCS certificate number and handover pack, obligated SEG licensees reject onboarding, stranding exported kWh unpaid.
Export Settlement Metering SMETS2 (or AMR half-hourly) + Export MPAN Half-hourly (30-minute) export register capability paired with a DNO-issued Export MPAN distinct from the Import MPAN. Export MPAN issuance typically takes 2 to 6 weeks post-DNO notice; back-dated export payments before Export MPAN registration and meter opening reads are rarely recoverable.
Green vs Brown BESS Export Ofgem SEG Storage Guidance Mixed grid-charged + PV-charged BESS requires separation if supplier restricts SEG strictly to renewable ("green") generation. Suppliers have no statutory duty to pay SEG on grid-imported ("brown") power discharged back out. Pure SEG accounts may require DC-coupled metering or disable forced grid-to-grid export; commercial ToU tariffs (e.g., Octopus Flux) voluntarily permit arbitrage.
Energy-Saving Materials VAT SI 2024/24 & HMRC VAT Notice 708/6 0% VAT on residential & qualifying charitable solar PV and standalone/retrofit BESS until 31 March 2027; reverts to 5% on 1 April 2027. Saves 5% to 20% upfront equity CAPEX on residential battery retrofits completed before 31 March 2027. Commercial non-charitable SME installations incur 20% VAT (recoverable if VAT-registered).

Hybrid Inverter & Export MPAN Bottlenecks

DNOs assess G98/G99 thresholds using total AC inverter nameplate capacity across solar and AC-coupled batteries combined, not DC panel wattage. Adding an AC-coupled 3.68 kW battery inverter beside a 3.68 kW solar inverter raises aggregate AC capacity to 7.36 kW, requiring G99 pre-approval before commissioning.

Ofgem Green vs Brown Export Accounting

Battery storage alone is ineligible under SI 2019/1005 unless co-located with qualifying low-carbon generation. Because suppliers claim REGOs on renewable exports, Ofgem guidance lets licensees exclude grid-charged ("brown") storage exports or require separate generation metering outside voluntary ToU tariffs.

Commercial Sites Between 50 kW and 5 MW

Warehouses, farms, and industrial roofs up to 5 MW remain SEG-eligible, though commercial sponsors rarely rely on 3p to 6p/kWh untied SEG rates. Above 150 kW, owners typically pair half-hourly AMR metering with sleeved or private-wire PPAs, treating SEG strictly as a seasonal weekend floor.

Self-Consumption Economics, 0% BESS VAT Arbitrage & MHHS Reform

Evaluating distributed solar and battery investments strictly on unlevered equity CAPEX payback, avoided retail import tariffs remain the dominant driver of asset yield, even as peak-window export and 0% VAT battery retrofits narrow payback timelines ahead of April 2027.

Import Avoidance vs Export Yield Spread

For Q4 2026 (1 October to 31 December 2026), Ofgem's default Standard Variable Tariff electricity unit rate stands at 26.32p/kWh (54.83p/day standing charge), with Ofgem projecting a Q1 2027 rise to 32.69p/kWh. Displacing 1 MWh of grid import delivers £263.20 in direct bill avoidance today, compared with £120.00 at a 12p/kWh tied export tariff (British Gas Export Premium or Outgoing Octopus) or just £30.00 to £60.00 on an untied 3p to 6p/kWh SEG tariff. Consequently, sizing a BESS to maximize behind-the-meter self-consumption yields more than double the per-kWh economic return of flat-rate grid export.

Pre-April 2027 Standalone BESS 0% VAT Window

Under SI 2024/24, electrical storage batteries installed either standalone or retrofitted to an existing PV array qualify for 0% VAT on residential and eligible charitable properties until 31 March 2027. On a £6,000 turnkey 10 kWh residential battery retrofit, completing commissioning before the March 2027 sunset saves £300 immediately relative to the scheduled 5% rate on 1 April 2027 (and £1,200 relative to the legacy 20% pre-2024 rate on standalone batteries). Combining daytime PV shifting with peak 16:00 to 19:00 Flux or Prime Outgoing export further compresses unlevered equity payback without relying on external borrowing.

Model storage sizing with ESI Battery Sizing Tool →

Elexon MHHS Settlement Cutover (2026-2027)

Great Britain's Market-wide Half-Hourly Settlement (MHHS) programme, delivered by Elexon, moves retail billing from estimated load profiles to actual 30-minute smart-meter settlement. Following system go-live in late 2025 (M10) and formal supplier/DSO qualification in October 2026 (M14, with roughly 75% to 80% of meters migrated), full industry migration completes in May 2027 (M15) before the settlement reconciliation timeline compresses from 14 months to 4 months in July 2027 (M16). Faster settlement cuts supplier working-capital risk and widens availability of half-hourly export tariffs aligned with evening grid peaks.

DESNZ Warm Homes Plan & Distributed Capacity

Launched by DESNZ in 2026, the multi-billion-pound Warm Homes Plan expands household and social-housing deployment of rooftop solar PV, heat pumps, and behind-the-meter battery storage alongside community energy initiatives. As millions of additional residential roofs enter the grid through 2030, midday solar saturation in distribution networks will place downward pressure on flat daytime export rates while increasing the value of evening-window (16:00 to 19:00) battery discharge under MHHS-enabled tariffs.

Executive Regulatory Q&A

What are British Gas's 2026 export tariff rates under the Smart Export Guarantee?
British Gas structures its 2026 export suite into three tiers: Export Premium at 12p/kWh for systems up to 15 kW (variable, no exit fees, exclusive to British Gas electricity customers), Export Extra at 8p/kWh for systems above 15 kW supplied by British Gas, and its Standard SEG Tariff at 3p/kWh flat rate for non-British Gas import customers. These replaced earlier Export and Earn Plus (15.1p/kWh) and Export and Earn Basic (6.4p/kWh) offers.
Are UK suppliers legally required to pay a minimum SEG rate or pay for grid-charged battery exports?
Under SI 2019/1005, licensed electricity suppliers with 150,000 or more domestic customers must offer at least one SEG tariff paying strictly above zero pence per kWh (>0p/kWh) at all times, preventing zero or negative settlement prices. However, there is no fixed statutory pence-per-kWh floor, and Ofgem guidance confirms suppliers are not obliged to pay SEG rates on brown electricity imported from the grid into a battery and re-exported unless offered voluntarily under a commercial time-of-use tariff.
Why is there such a wide spread between tied and untied UK SEG tariffs?
Ofgem's SEG Year 5 Annual Report (covering April 2024 to March 2025) recorded an average tied tariff of 15.39p/kWh versus 4.47p/kWh for untied open-market tariffs, around an overall 10.8p/kWh average. Suppliers subsidize higher bundled export rates by capturing margin on the accompanying electricity import contract or direct hardware installation, whereas standalone export-only accounts track conservative wholesale netback values.
When does a solar PV or battery system require a DNO G99 application instead of G98?
Under ENA Engineering Recommendation G98, installations up to 16A per phase (3.68 kW single-phase or 11.04 kW three-phase total inverter capacity) can connect first and notify the Distribution Network Operator afterward. Any aggregate AC inverter rating exceeding 3.68 kW on single-phase or 11.04 kW on three-phase requires formal pre-installation DNO approval under G99, unless an approved G100 export limitation scheme is accepted by the local DNO.
How does the 0% VAT relief on solar panels and standalone batteries work before April 2027?
Under SI 2024/24 (effective 1 February 2024) and HMRC VAT Notice 708/6, electrical storage batteries (standalone, retrofitted, or installed alongside solar PV) and solar panels qualify for 0% VAT on residential and qualifying charitable installations through 31 March 2027. On 1 April 2027, the temporary zero rate reverts to the 5% reduced VAT rate unless extended by Parliament; non-charitable commercial installations remain subject to standard 20% VAT.
How will Elexon's Market-wide Half-Hourly Settlement (MHHS) affect export tariffs in 2026-2027?
Managed by Elexon, MHHS completed industry qualification in October 2026 (M14) with roughly 75% to 80% of meters migrated, ahead of 100% migration completion in May 2027 (M15) and cutover from a 14-month to a 4-month settlement window in July 2027 (M16). Compressing settlement lag lowers supplier collateral exposure and enables broader time-of-use and dynamic half-hourly export tariffs.

Official Legislation, Ofgem Filings & Supplier Tariff Registers

All statutory boundaries, Year 5 SEG settlement figures, DNO thresholds, and 2026 supplier tariffs in this dossier are verified directly against primary UK registries and licensee publications. Accessed and verified November 2026.

Regulatory Verification & Primary Basis

Every statutory status, tariff tier, Ofgem telemetry figure, and tax cutoff in this briefing is anchored directly to UK Statutory Instruments, Ofgem compliance reports, Elexon settlement documentation, and live supplier tariff schedules cited above. ESI separates enacted statutory obligations from discretionary retail tariff pricing.

Primary-Source AnchoringStatutory scope, >0p/kWh floor rules, and capacity caps are verified against SI 2019/1005 and SI 2024/24, paired with Ofgem's December 2025 SEG Year 5 Annual Report and Elexon MHHS milestone schedules.
Asset-Owner Diligence ProtocolBefore commissioning PV or standalone BESS capital, project owners should confirm DNO G98/G99 approvals, MCS certification, Export MPAN registration, and unbundled import-export unit spreads rather than relying on headline export rates alone.
Reviewed & Verified by Khaled Shawky · Chief Energy Systems & Policy Editor, Energy Solutions Intelligence Verification Cycle: November 2026