| Mechanism | Status | Authority | Effective Window | Key Threshold |
|---|---|---|---|---|
| SIGHT Component I (Electrolyser PLI) Domestic alkaline, PEM & SOEC stack manufacturing | Active (Tranches I & II Awarded) | MNRE / SECI | 5-year payout window from commissioning (2025-2030) | INR 4,440 Cr envelope; INR 4,440/kW base cap tapering annually |
| SIGHT Component II Mode-1 (Green Hydrogen) Competitive lowest-subsidy production tenders | Active (SECI Bidding & Execution) | MNRE / SECI | 3 operating years post-COD | Capped at INR 50 / INR 40 / INR 30 per kg H2 |
| SIGHT Component II Mode-2A (Green Ammonia) Aggregated fertilizer demand & 10-year GAPA | Active (Tranche I & II Tenders) | MNRE / SECI / Dept. of Fertilizers | 10-year GAPA; 3-year incentive payout | INR 8.82 / INR 7.06 / INR 5.30 per kg NH3 + PSM backing |
| National Green Hydrogen Standard Mandatory well-to-gate carbon intensity limit | Binding Statutory Rule | MNRE / BEE | Continuous for all SIGHT & ISTS waivers | Max 2.0 kg CO2e per kg H2 (12-month rolling average) |
Approved by India's Union Cabinet in January 2023 and executed through operational guidelines issued by the Ministry of New and Renewable Energy (MNRE), the National Green Hydrogen Mission targets 5 million metric tonnes per annum (MMTPA) of green hydrogen production capacity by 2030. Rather than relying on open-ended tax credits, New Delhi structured SIGHT as a ring-fenced INR 17,490 crore fiscal pool administered via competitive tenders run by the Solar Energy Corporation of India (SECI). Note the frequent industry misnomer "SITA": the statutory scheme name is SIGHT (Strategic Interventions for Green Hydrogen Transition).
Component I provides five-year Production-Linked Incentives (PLI) tied to verified annual sales of locally manufactured electrolysers. Base incentives start at INR 4,440 per kW in Year 1 and step down progressively through Year 5, weighted by specific energy consumption (SEC) efficiency and domestic value addition (DVA) milestones.
Under Tranche I and Tranche II tenders, SECI awarded gigawatt-scale manufacturing allocations to major industrial groups and specialized technology suppliers, including Reliance Electrolyser Manufacturing, Ohmium Operations, John Cockerill Greenko, L&T Electrolysers, Advait Infratech, Matrix Gensol, Adani Enterprises, Waaree Energies, and Avaada Electrolysers, with factory commissioning schedules stretching into 2026.
Component II bridges the operating cost spread against grey hydrogen and imported fossil ammonia across three bidding tracks: Mode-1 (competitive lowest-subsidy green hydrogen tenders), Mode-2A (demand-aggregated green ammonia for fertilizer plants), and Mode-2B (dedicated green hydrogen demand aggregation for refineries and steelmakers).
Unlike European Contract-for-Difference mechanisms that expose the sovereign budget to 10-year variable commodity spreads, SIGHT caps direct per-kilogram fiscal outlays strictly to the first three years of commercial operation. Once Year 3 closes, project sponsors rely entirely on executed industrial offtake contracts, renewable power banking, and export premiums.
| SIGHT Track | Budget Envelope | Bid Selection Basis | Incentive Duration | 2025-2026 Implementation Stage |
|---|---|---|---|---|
| Component I (Tranche I & II) | INR 4,440 Crore | DVA score + SEC performance + capacity | 5 years post-COD | Factory build-outs and local supply chain qualification underway through 2026 |
| Component II Mode-1 | Within INR 13,050 Cr | Lowest weighted 3-year INR/kg bid | 3 years post-COD | Tranche I & II capacity awarded; developers executing renewable PPAs and EPC |
| Component II Mode-2A | Within INR 13,050 Cr | Lowest 10-year landed NH3 price (INR/kg) | 3-yr grant + 10-yr GAPA | Tranche I & II fertilizer tenders (including 54,000 MTPA Dhule lot) advancing |
| Component II Mode-2B | Within INR 13,050 Cr | Refinery & industrial demand aggregation | 3 years post-COD | Public-sector refinery hydrogen procurement synchronized with MNRE guidelines |
Because raw gaseous hydrogen faces pipeline and storage bottlenecks, India prioritized green ammonia (NH3) as an immediate industrial vector to displace imported liquefied natural gas in domestic urea and complex fertilizer manufacturing. During 2025 and 2026, SECI scaled Mode-2A from initial pilot allocations into repeatable commercial tenders backed by standardized contract architecture.
SECI pools multi-year ammonia requirements from domestic fertilizer facilities across coastal and inland industrial corridors. In Tranche II, for example, SECI issued targeted lots such as the 54,000 MTPA green ammonia supply tender for fertilizer operations in Dhule, Maharashtra, giving developers bankable long-term industrial demand without bilateral counterparty fragmentation.
Winning bidders sign 10-year Green Ammonia Purchase Agreements (GAPAs) priced in INR per kg, paired with a fixed three-year production incentive: INR 8.82/kg in Year 1, INR 7.06/kg in Year 2, and INR 5.30/kg in Year 3. Front-loading the subsidy lowers early-year unit delivery prices while fertilizer plants adapt procurement budgets.
To protect project equity sponsors against delayed receivables from fertilizer buyers, MNRE and SECI integrated a dedicated Payment Security Mechanism backed by government reserves. Sponsors must reach financial closure within 12 months of Letter of Award issuance and post performance bank guarantees tied to commissioning milestones.
| Compliance & Commercial Parameter | Mode-1 (Green Hydrogen) | Mode-2A (Green Ammonia) | Sponsor Diligence Verification |
|---|---|---|---|
| Year 1 / Year 2 / Year 3 Cap | INR 50 / 40 / 30 per kg (bid-determined) | INR 8.82 / 7.06 / 5.30 per kg (fixed schedule) | Confirm net realized tariff after renewable wheeling and water charges |
| Contracted Offtake Tenor | Merchant or bilateral industrial offtake | 10-year SECI-intermediated GAPA | Verify buyer take-or-pay floor and PSM reserve replenishment triggers |
| Financial Closure Window | Typically 12 months from LoA | 12 months from LoA / GAPA signing | Ensure full sponsor equity commitment and EPC binding price schedules |
| Grid & ISTS Waiver Eligibility | 25-year ISTS waiver for projects commissioned by Dec 2030 | 25-year ISTS waiver for dedicated RE supply | Verify CERC connectivity grant and state open-access banking rules |
Winning a SECI allocation under SIGHT does not guarantee subsidy disbursement. Between 2025 and November 2026, project execution has shifted focus toward grid connectivity queues, round-the-clock (RTC) renewable power firming, and compliance audits under India's statutory Green Hydrogen Standard.
Under MNRE's August 2023 Green Hydrogen Standard, total well-to-gate emissions (covering renewable electricity supply, water desalination or treatment, electrolysis, compression, and on-site storage) must average 2.0 kg CO2 equivalent or less per kg of hydrogen over each rolling 12-month verification period.
The Bureau of Energy Efficiency (BEE) serves as the nodal accreditation agency overseeing third-party verification bodies. Any fossil backup power or grid draw during low-wind hours that pushes lifecycle intensity above 2.0 kg CO2e/kg disqualifies the affected production batch from SIGHT claims.
Developers face tight alignment rules between Component I domestic electrolyser supply and Component II project schedules. While domestic gigawatt factories ramp up through 2026, stack commissioning delays, balance-of-plant import duties, and high-voltage substation bottlenecks can compress the 12-month financial closure and 30-to-36-month COD windows.
Investment committees underwriting Indian hydrogen or ammonia assets should structure capital around strong sponsor equity participation, firm round-the-clock solar-wind-storage PPAs, and conservative commissioning buffers, treating SIGHT Year 1-3 cash flows as performance-verified upside contingent on BEE audit sign-off.
All budgetary allocations, tender tranches, and emission standards are anchored to primary Indian ministry and implementing-agency registers as of November 2026.
Every budgetary outlay, per-kilogram cap, and tranche milestone in this dossier is verified directly against MNRE operational guidelines, SECI tender documents, and NGHM public registers. ESI distinguishes between Union budget envelopes, competitively awarded allocations, and post-COD verified subsidy disbursements.
Explore technical benchmarks, engineering calculators, and supply-chain intelligence aligned with this policy.