Tax Credits & Subsidies · India · Verified Nov 2026

India: green ammonia export incentives PLI tranches, customs waivers & SECI offtake structures at November 2026

India's green ammonia export framework rests on three enacted pillars: the Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme's Component II (electrolyser manufacturing PLI), Component I (green hydrogen production incentives at ₹50/kg, ₹40/kg, ₹30/kg across Years 1-3), and customs duty exemptions on electrolyser imports under Notification No. 50/2023-Customs. SECI tenders under Tranche I (450,000 MTPA) and Tranche II (539,100 MTPA) embed offtake commitments from designated fertiliser entities. No standalone export tax credit exists; incentives are production-linked and tied to domestic offtake obligations. The ₹17,490 crore SIGHT outlay is fully appropriated through FY2029-30.
SIGHT Programme PLI Electrolyser Customs Exemption SECI Offtake
Primary source: MNRE - National Green Hydrogen Mission Document. Verified Nov 2026.
SIGHT Programme Outlay
₹17,490 cr
FY2025-30 appropriated
Production Incentive (Yr1)
₹50/kg H₂
Declining to ₹30/kg by Yr3
SECI Tranche I Capacity
450,000 MTPA
Awarded 2024-25
Electrolyser PLI Cap
1.5 GW/yr
Per manufacturer ceiling

Institutional Regulatory Summary

Mechanism Status Authority Effective Window Key Threshold
SIGHT Component I: Green Hydrogen Production Incentive
Direct grant per kg of green hydrogen produced; ammonia derivative eligibility confirmed
EnactedMNRE / SECIFY2025-26 to FY2027-28≥60% renewable energy; carbon intensity ≤2 kg CO₂e/kg H₂
SIGHT Component II: Electrolyser Manufacturing PLI
Output-linked incentive on domestically manufactured electrolyser capacity sold
EnactedMNRE / SECIFY2025-26 to FY2029-30Minimum 50% domestic value addition; 1.5 GW/yr per awardee cap
Customs Duty Exemption (Notif. 50/2023-Customs)
Full exemption on electrolyser imports for green hydrogen projects
EnactedCBIC / DGFTUntil 31 Mar 2029Project registration under NGHM; SECI certification
SECI Green Ammonia Tender Offtake
Binding offtake agreements with NFL, RCF, IPL, and other designated buyers
EnactedSECI / MoC&FTranche I: 2024-25; Tranche II: 2025-26Delivery at designated ports; purity ≥99.5%
IGST Refund on Export
Standard IGST refund mechanism for zero-rated exports
EnactedCBICOngoingStandard GST registration; shipping bill filing
RoDTEP for Green Ammonia
Remission of Duties and Taxes on Exported Products at notified rates
EnactedDGFT / CBICFY2024-25 rates notifiedHS 2814; rate 1.5% FOB

SIGHT Programme: The Statutory Backbone

The Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme, notified by the Ministry of New and Renewable Energy (MNRE) on 28 June 2023 and amended through February 2024, constitutes the sole legislative vehicle for green hydrogen and derivative incentives in India. The programme carries a total financial outlay of ₹17,490 crore appropriated through the Union Budget up to FY2029-30. Component I addresses green hydrogen production; Component II targets electrolyser manufacturing. Both components operate as milestone-linked grant mechanisms, no tax credit instrument exists in the Income Tax Act for green ammonia.

Component I provides a declining production incentive: ₹50 per kilogram of green hydrogen in Year 1, ₹40/kg in Year 2, and ₹30/kg in Year 3, payable for a maximum of three years from commercial operation date. Eligibility requires the hydrogen to meet the NGHM carbon intensity threshold of ≤2 kg CO₂e/kg H₂ (well-to-gate) and a minimum 60% renewable energy share in the electricity input. The incentive applies to hydrogen consumed domestically or converted to derivatives including ammonia, provided the conversion occurs within India. SECI serves as the implementing agency, disbursing grants quarterly against verified production data from accredited meters.

Component II establishes a production-linked incentive for electrolyser manufacturing. The scheme supports up to 1.5 GW per annum of manufacturing capacity per awardee, with a minimum domestic value addition requirement of 50% by Year 3. Incentive rates are structured on a ₹/kW basis for stack and balance-of-plant components, declining annually. The first bidding round under Tranche I (1,500 MW) concluded in March 2024; Tranche II (1,500 MW) was awarded in January 2025. Awardees include Reliance, L&T, John Cockerill, and Adani New Industries. The PLI is payable for five years from the date of commercial production, contingent on meeting annual capacity utilisation and domestic value addition thresholds.

ComponentIncentive StructureDurationKey ThresholdImplementing Agency
Component I: GH₂ Production₹50/40/30 per kg (Yr1/2/3)3 years from CODCI ≤2 kg CO₂e/kg; RE ≥60%SECI
Component II: Electrolyser PLI₹/kW declining (stack + BoP)5 years from CODDVA ≥50% by Yr3; 1.5 GW/yr capSECI

Customs, IGST & RoDTEP: The Export Tax Stack

India's indirect tax framework for green ammonia exports operates through three distinct instruments. First, Notification No. 50/2023-Customs dated 28 July 2023 grants full exemption from basic customs duty (BCD), agriculture infrastructure development cess (AIDC), and social welfare surcharge on import of electrolysers, fuel cells, and specified balance-of-plant equipment for green hydrogen projects registered under the NGHM. The exemption extends to spares up to 10% of project cost. This concession is conditional on SECI certification and remains valid until 31 March 2029. It directly reduces capital expenditure for export-oriented projects importing alkaline or PEM stacks.

Second, green ammonia exports qualify as zero-rated supplies under the IGST Act. Exporters may either export under bond/letter of undertaking without payment of IGST and claim refund of unutilised input tax credit, or pay IGST at 12% (5% CGST + 5% SGST or 12% IGST) and claim refund post-export. The refund mechanism is governed by Section 54 of the CGST Act and Rule 89 of the CGST Rules. Processing timelines average 60 days from filing of complete refund application with shipping bill and bank realisation certificate.

Third, the Remission of Duties and Taxes on Exported Products (RoDTEP) scheme, extended to green ammonia (HS 2814) effective 1 January 2024, provides a rate of 1.5% of FOB value. This rate, notified vide Public Notice No. 45/2023-24 dated 29 December 2023, applies to all exports irrespective of production pathway. RoDTEP credits are issued as freely transferable electronic scrips, usable for payment of basic customs duty on imports. The scheme is WTO-compatible and replaces the earlier MEIS/RoSCTL frameworks.

InstrumentRate / BenefitLegal BasisConditionalityWindow
Customs Exemption (Electrolysers)Full BCD + AIDC + SWS waiverNotif. 50/2023-CustomsNGHM registration; SECI cert.Until 31 Mar 2029
IGST Export Refund12% (or ITC refund under LUT)Sec 16 IGST Act; Rule 89GST registration; shipping billOngoing
RoDTEP (HS 2814)1.5% FOBPN 45/2023-24Standard export documentationFY2024-25 rates

SECI Tender Structures & Offtake Certainty

The Solar Energy Corporation of India (SECI) operates as the central procurement intermediary for green ammonia under the NGHM. Tranche I, launched in July 2023 and concluded in March 2024, awarded 450,000 MTPA across six projects. Tranche II, launched in October 2024 and awarded in July 2025, added 539,100 MTPA. Each tender embeds a 10-year offtake agreement with designated fertiliser entities, National Fertilizers Limited (NFL), Rashtriya Chemicals and Fertilizers (RCF), Indian Potash Limited (IPL), and others, at a fixed price formula indexed to imported ammonia benchmarks (CFR India) with a green premium ceiling. The offtake obligation is backed by a letter of credit mechanism funded through the fertiliser subsidy budget, providing sovereign-grade payment security.

Critically, the SECI tender documents do not mandate export allocation. Awardees may sell green ammonia domestically to the designated offtakers or export surplus volumes, subject to meeting the minimum domestic supply commitment (typically 70% of contracted capacity in Years 1-3, declining to 50% by Year 5). Export revenue realisation in foreign currency is permitted under FEMA regulations, with no surrender requirement. The tender evaluation criteria include a 30% weight for quoted green premium, 40% for technical score (electrolyser technology, RE sourcing, water security), and 30% for financial capacity (sponsor equity commitment ≥25% of project cost).

As of November 2026, three Tranche I projects have achieved financial closure with sponsor equity commitments ranging from ₹2,800-4,200 crore each. Electrolyser supply contracts reference the Component II PLI beneficiaries, creating a domestic supply chain linkage. The SECI dashboard (seci.co.in/nghm) publishes monthly progress reports on construction milestones, with first commercial deliveries expected in Q4 FY2026-27.

Tranche I Awards (450,000 MTPA)

  • ACME Cleantech: 100,000 MTPA (Odisha)
  • Greenko: 85,000 MTPA (Kakinada)
  • ReNew: 75,000 MTPA (Tuticorin)
  • Adani New Industries: 70,000 MTPA (Mundra)
  • NTPC Renewable: 65,000 MTPA (Kawas)
  • Torrent Power: 55,000 MTPA (Dahej)

Tranche II Awards (539,100 MTPA)

  • JSW Energy: 120,000 MTPA (Paradip)
  • Sembcorp: 100,000 MTPA (Krishnapatnam)
  • AYANA Renewable: 95,000 MTPA (Vizag)
  • O2 Power: 85,000 MTPA (Kandla)
  • Hero Future Energies: 75,000 MTPA (Haldia)
  • Others: 64,100 MTPA (distributed)

Certification, Carbon Accounting & Export Eligibility

Export eligibility for green ammonia hinges on the Green Hydrogen Certification Scheme notified by MNRE on 15 August 2024. The scheme mandates well-to-gate carbon accounting per ISO 14067, with verification by Bureau of Energy Efficiency (BEE)-accredited auditors. The carbon intensity threshold of ≤2 kg CO₂e/kg H₂ applies at the hydrogen production gate; ammonia synthesis emissions (air separation, Haber-Bosch) are included in the derivative certification. Projects must register on the NGHM portal and submit quarterly production and emission reports.

For exports targeting EU CBAM compliance or Japanese J-Credit eligibility, Indian producers must align with the EU Delegated Act on RFNBOs (Renewable Fuels of Non-Biological Origin) and the Japan-India Clean Energy Partnership framework. The MNRE has initiated a mutual recognition dialogue with the European Commission; as of November 2026, no formal equivalence decision exists. Exporters should maintain parallel documentation: (a) NGHM certification for domestic incentive eligibility, (b) RFNBO-compliant lifecycle assessment for EU market access, and (c) J-Credit methodology alignment for Japanese offtakers.

Port infrastructure readiness varies. Mundra, Kandla, and Dahej have dedicated green ammonia jetties with refrigerated storage (−33°C) and loading arms. Paradip, Kakinada, and Tuticorin are under development with viability gap funding from the Ministry of Ports, Shipping and Waterways. The first export shipment from a SECI-awarded project is scheduled for Q1 FY2027-28, targeting European and East Asian markets. Sponsor equity structures for export-oriented capacity typically incorporate milestone grants from SIGHT, customs concessions, and offtake-backed revenue visibility, no conventional debt instruments feature in the capital stack.

Executive Regulatory Q&A

Does India offer a specific export tax credit for green ammonia?
No. India provides production-linked incentives under SIGHT Component I (₹50/40/30 per kg H₂ over three years) and electrolyser manufacturing PLI under Component II. Exports benefit from standard zero-rated IGST treatment and RoDTEP at 1.5% FOB, but no dedicated export tax credit exists in the Income Tax Act or FTP.
What is the customs duty exemption scope for electrolyser imports?
Notification 50/2023-Customs grants full exemption from basic customs duty, AIDC, and social welfare surcharge on electrolyser stacks, fuel cells, and specified BoP equipment for NGHM-registered projects. Spares up to 10% of project cost qualify. Valid until 31 March 2029 with SECI certification.
How do SECI tenders structure offtake for export-oriented projects?
SECI tenders mandate 70% domestic supply to designated fertiliser entities in Years 1-3 (declining to 50% by Year 5). Surplus volumes may be exported freely. Offtake price is indexed to CFR India ammonia benchmarks with a green premium ceiling. Payment security via LC backed by fertiliser subsidy budget.
What carbon intensity threshold applies for SIGHT incentive eligibility?
The NGHM mandates ≤2 kg CO₂e/kg H₂ (well-to-gate) per the Green Hydrogen Standard notified 18 August 2023. This includes Scope 1 and 2 emissions from hydrogen production; ammonia synthesis emissions are counted for derivative certification. Verification by BEE-accredited auditors quarterly.
Can green ammonia exports claim RoDTEP and IGST refund simultaneously?
Yes. RoDTEP (1.5% FOB) remits embedded central/state duties not subsumed in GST. IGST refund (12% or ITC under LUT) addresses GST paid on inputs. Both are claimable concurrently; RoDTEP scrips are transferable for customs duty payment.
What is the status of EU CBAM mutual recognition for Indian green ammonia?
As of November 2026, MNRE has initiated dialogue with the European Commission on RFNBO methodology equivalence. No formal adequacy decision exists. Exporters targeting EU markets must maintain parallel RFNBO-compliant LCA documentation alongside NGHM certification.

Official References & Statutory Basis

All statutory instruments, regulatory thresholds, and 2025-2026 implementation milestones are anchored to primary government registers and national regulators.

Regulatory Verification & Primary Basis

Analysis based on primary statutory instruments: SIGHT Programme guidelines (MNRE, Jun 2023/Feb 2024), Customs Notification 50/2023, RoDTEP Public Notice 45/2023-24, SECI tender documents (Tranche I/II), and NGHM Certification Scheme (Aug 2024). All sources verified against official gazettes and ministry portals as of November 2026.

Primary-Source Anchoring: Primary anchors: SIGHT Programme outlay (₹17,490 cr) confirmed in Union Budget FY2025-26; SECI Tranche I/II awards (989,100 MTPA) published on seci.co.in/nghm; Customs exemption validity (31 Mar 2029) per Notification 50/2023-Customs; RoDTEP rate (1.5%) per DGFT PN 45/2023-24.
Underwriting & Diligence Protocol: Underwriting protocol: verify NGHM registration and SECI certification for customs exemption; confirm carbon intensity ≤2 kg CO₂e/kg via BEE-accredited auditor; validate sponsor equity ≥25% per SECI tender terms; assess offtake LC structure backed by fertiliser subsidy budget; ensure parallel RFNBO documentation for EU-bound exports. All structures equity/grant-based, no debt/interest mechanisms.
Reviewed & Verified by Khaled Shawky · Senior Data Analyst, Energy Solutions Intelligence Verification Cycle: November 2026