Waste Heat Recovery Calculator

Stop heating the sky. Calculate the value of energy lost through your exhaust stacks.

Exhaust Parameters

Stack Temp (Typically 200°C - 500°C)
Keep above 120°C to avoid acid condensation

Recoverable Energy

0 kW
Thermal Power Recovered
$0
Annual Savings
Saves 0 Tons of CO2 / Year
Need a Heat Exchanger Design?

The Physics of Waste Heat

Industrial boilers typically exhaust gases at 200°C to 300°C. By installing an Economizer (a heat exchanger), you can transfer this energy to the incoming boiler feed water.

The calculation follows the thermodynamic principle: Q = m * Cp * ΔT. Even dropping the exhaust temperature by 50°C can result in 3-5% fuel savings, which translates to tens of thousands of dollars annually for large facilities.