LCOS Calculator

The financial standard for storage: Calculate the true cost per kWh stored.

Cost & Lifetime Parameters

CAPEX ($/kWh Installed) 350
Installation cost per unit of energy.
Cycles (Lifetime) 6000
Total cycles before end-of-life (EOL).
Roundtrip Efficiency (%) 90
Energy lost during charging/discharging.
Charging Price ($/kWh) 0.05
The cost of the energy used to charge the battery.
Annual Fixed O&M (%) 2.0
Operational expenses as a % of CAPEX.
Discount Rate / WACC (%) 8
Cost of capital.

Levelized Cost of Storage

$0.00
per kWh stored
Cost Breakdown ($/kWh)
CAPEX & OPEX:
$0.00
Charging Cost:
$0.00
Losses (Inefficiency): $0.00

LCOS is the lowest cost required to recoup investment.

LCOS: The Decisive Metric for Grid Modernization

Just as LCOE governs power generation, **LCOS** determines the viability of battery energy storage systems (BESS). It is the single number used by grid operators and developers worldwide to assess financial competitiveness against traditional solutions like peaking gas plants.

This tool uses professional financial models, incorporating the **cost of capital (WACC)**, **annual degradation cycles**, and **roundtrip efficiency losses** to determine the most accurate unit cost of stored energy. Sites achieving LCOS below the cost of peak grid power are positioned for massive arbitrage profits and reliability contracts.