HVAC Lifecycle Cost Analyzer

Engineering analysis: Variable Refrigerant Flow (VRF) vs. Water-Cooled Chillers.

Project Specs
Total Load (Tons)
Operation Hours/Year
Electricity Rate ($/kWh)
Analysis Period (Years)
Cost Assumptions ($/Ton)
VRF System
CAPEX (Install)
Chiller System
CAPEX (Install)
15-Year Total Cost of Ownership (TCO)
$0M
OPEX
CAPEX
Chiller
$0M
OPEX
CAPEX
VRF
Metric Chiller VRF
Initial Cost (CAPEX) $0 $0
Annual Energy Cost $0 $0
15-Year Maintenance High Low
Net Savings - $0
*Calculation assumes average efficiency: Chiller (0.8 kW/Ton) vs VRF (0.6 kW/Ton) at part-load.

The "Iceberg" of HVAC Costs

When choosing a commercial HVAC system, Capital Expenditure (CAPEX) is just the tip of the iceberg. Operational Expenditure (OPEX) accounts for 70-80% of the lifecycle cost.

While Chillers are often cheaper to install, VRF systems excel in part-load efficiency (SEER), meaning they consume significantly less electricity when the building is not at peak occupancy. This tool helps developers visualize the long-term ROI of investing in higher-efficiency VRF technology.