United States: IRC Section 45U Nuclear Production Tax Credit

Institutional Policy Brief: Enacted under IRA § 13105 and preserved through December 31, 2032 by OBBBA (P.L. 119-21 § 70510), IRC § 45U functions as a sliding-scale revenue floor for existing commercial reactors placed in service before August 16, 2022. With prevailing-wage compliance, the credit pays up to $15.00/MWh ($0.015/kWh) and phases down at an 80% slope above $26.00/MWh in 2025–2026 (IRS Notices 2025-37 and 2026-41), tapering to zero at $44.75/MWh while enforcing new Prohibited Foreign Entity (PFE) disqualifications.
Up to $15/MWh (5x PW Rate) Active 2024–2032 (OBBBA Preserved) $26.00 to $44.75/MWh Collar (2026) PFE Rules Active (Notice 2026-15)
Maximum 5x PW Credit
$15.00/MWh
$0.003/kWh base; $0.015/kWh with PW (2024–2026).
2025–2026 Phase-Out Collar
$26–$44.75
IRS Notices 2025-37 (1.0242) & 2026-41 (1.0539).
H1 2026 § 6418 Pricing
95.8¢ / $1
Crux H1 2026 transfer average; 11.8% market share.
Statutory Window & PFE
Dec 31, 2032
Preserved by P.L. 119-21; SFE bar post-July 4, 2025.

Statutory Architecture, 2025–2026 Amendments & Market Guardrails

Mechanism Status Authority Effective Window Key Threshold
IRC § 45U Nuclear PTC
IRA § 13105 (P.L. 117-169); Form 7213
Active Statutory Floor US Treasury / IRS Jan 1, 2024 to Dec 31, 2032 $3/MWh base; $15/MWh (5x PW); pre-Aug 16, 2022 units
IRS Annual CPI Indexing
Notice 2025-37; Notice 2026-41
2025 & 2026 Rates Published IRS IRB CY 2025 (1.0242) & CY 2026 (1.0539) $26.00/MWh floor; $44.75/MWh zero-out ceiling
OBBBA PFE Disqualification
P.L. 119-21 § 70510; Notice 2026-15
Enforced (2025–2027) US Congress / IRS SFEs post-July 4, 2025; FIEs post-July 4, 2027 Zero § 45U if SFE (2026) or FIE (2028)
Credit Monetization Elections
IRC § 6418 Transfer & § 6417 Pay
Preserved by OBBBA IRS / Treasury Tax years 2024 through 2032 95.8¢/$1 H1 2026 avg cash transfer
PJM Co-Location Tariff Rules
FERC EL25-49 (193 FERC ¶ 61,217; 195 FERC ¶ 61,209)
Compliance Orders FERC / PJM OATT Feb 2025 Sec. 206; Dec 2025 & June 2026 Orders Mandatory network-cost & metering rules for large loads

How the Section 45U Revenue Collar Operates Across 2024–2026

Unlike § 45Y production credits that pay a fixed rate regardless of wholesale power prices, IRC § 45U acts as an asymmetric downside floor for reactors placed in service before August 16, 2022 without a § 45J allocation. For electricity sold to unrelated persons from 2024 through 2032, § 45U sets a base credit of $0.003/kWh ($3.00/MWh) and multiplies it by five to $0.015/kWh ($15.00/MWh) under § 45U(d)(1) when facility alterations and repairs satisfy federal prevailing-wage rules.

Under 26 U.S.C. § 45U(b)(2), the tentative 0.3-cent base credit is reduced by 16% of gross receipts above 2.5 cents/kWh ($25.00/MWh) before applying the 5x multiplier, creating an effective 80% phase-out slope ($0.80/MWh reduction per $1.00/MWh of excess revenue).

Net § 45U ($/MWh) = MAX[0, 5 × ($3.00 − 0.16 × MAX(0, Gross_Receipts − Threshold))]
CY 2024 Baseline: $25.00/MWh floor → $43.75/MWh zero-out | CY 2025–2026 (IRS): $26.00/MWh floor → $44.75/MWh zero-out

No separate § 45U inflation notice appeared in 2024, so calendar-year 2024 returns used the unadjusted $25.00/MWh floor. In July 2025, IRS Notice 2025-37 (IRB 2025-30) applied a 1.0242 deflator factor, lifting the 2025 threshold to $0.026/kWh ($26.00/MWh) while rounding kept the credit at $0.003/$0.015 per kWh; Form 7213 instructions directed fiscal-year filers who used $0.025 for 2025 production to amend returns. In July 2026, IRS Notice 2026-41 (IRB 2026-29) set the 2026 factor at 1.0539, retaining the $26.00/MWh floor, $15.00/MWh cap, and $44.75/MWh zero-out ceiling.

Realized Gross Receipts ($/MWh) CY 2024 § 45U Credit (5x PW) CY 2025–2026 § 45U Credit (5x PW) 2025–2026 Total Revenue + Credit Cash Proceeds @ 95.8¢ (§ 6418)
$22.00 / MWh $15.00 / MWh $15.00 / MWh (Max Cap) $37.00 / MWh $14.37 / MWh cash
$26.00 / MWh (2025–26 Floor) $14.20 / MWh $15.00 / MWh (Max Cap) $41.00 / MWh $14.37 / MWh cash
$31.00 / MWh $10.20 / MWh $11.00 / MWh $42.00 / MWh $10.54 / MWh cash
$36.00 / MWh $6.20 / MWh $7.00 / MWh $43.00 / MWh $6.71 / MWh cash
$41.00 / MWh $2.20 / MWh $3.00 / MWh $44.00 / MWh $2.87 / MWh cash
$43.75 / MWh (2024 Zero-Out) $0.00 / MWh $0.80 / MWh $44.55 / MWh $0.77 / MWh cash
$44.75 / MWh (2025–26 Zero-Out) $0.00 / MWh $0.00 / MWh $44.75 / MWh $0.00 / MWh cash

Note: Figures reflect 5x prevailing-wage rates under 26 U.S.C. § 45U(b)(2) & (d)(1), IRS Notices 2025-37 & 2026-41 ($26.00/MWh threshold), and Crux H1 2026 average § 6418 transfer pricing ($0.958/$1).

What Public Reports, JCT Scoring & Utility 10-K Filings Show

Four independent public sources document how § 45U performs across gas and power cycles: Joint Committee on Taxation (JCT) budget scoring, dispatch modeling by Resources for the Future (RFF), Princeton's REPEAT Project, and the Congressional Research Service (CRS), SEC Form 10-K filings, and § 6418 secondary-market transfer benchmarks.

1. Federal Fiscal Estimates (JCT) & Dispatch Modeling (RFF, REPEAT, CRS)

JCT originally scored IRA § 13105 at roughly $30 billion over FY2022–FY2031. RFF, Princeton REPEAT, and CRS analyses show that actual fiscal outlays are price-elastic: when low gas prices depress PJM or MISO power toward $25–$32/MWh, § 45U cushions revenue compression and prevents premature retirements; when wholesale clearing prices exceed $45/MWh, tax expenditures taper automatically to zero.

2. Audited Utility Form 10-K Realizations & § 6418 Cash Monetization

SEC filings from 2024–2026 confirm this counter-cyclical behavior. Constellation Energy (CEG) booked $1.38 billion in § 45U benefits inside operating revenues through Q3 2024 (~$2.08 billion full-year trajectory) before stronger 2025 wholesale prices reduced floating accruals, while OBBBA's preservation accelerated roughly $200 million in cash timing. Vistra Corp. (VST) reported $545 million in estimated 2024 PTC revenue ($281 million Texas; $264 million East). PSEG (PEG) disclosed that elevated PJM capacity and energy realizations kept Salem and Hope Creek near or above the phase-out collar, turning § 45U into a pure balance-sheet floor.

Under IRC § 6418, operators transfer credits for tax-free cash via Form 7213 elections. Crux H1 2026 market data shows § 45U transfers averaged $0.958 per dollar (95.8 cents), beating general PTCs ($0.930) and ITCs ($0.913) at 11.8% of tracked volume, reflecting investment-grade counterparties and zero construction risk.

Benchmark / Facility / Deal Market Verified Scale & Financial Metric § 45U / Tariff Interaction
JCT / CRS / RFF / REPEAT US Fleet ~$30B JCT 10-yr score (FY2022–2031) Counter-cyclical floor; zero payout above $44.75/MWh
Constellation Energy (10-K) PJM / MISO / NYISO $1.38B 9M 2024 PTC; ~$200M OBBBA accel. 2025 higher power prices compressed floating PTC accruals
Vistra Corp. (10-K) ERCOT & PJM $545M est. 2024 PTC ($281M TX / $264M East) Stabilizes merchant nuclear floor across TX & East
PSEG (10-K) PJM (Salem / Hope Creek) Minimal payout in strong clearing years PJM capacity & energy realizations exceeded collar ceiling
Crane Center (TMI-1) PJM (PA) 835 MW; 20-yr Microsoft PPA (target ~2027) Hyperscaler PPA; restart § 45Y vs § 45U evaluated
Clinton Center (Meta) MISO (IL) 1,121 MW; 20-yr Meta PPA (starts June 2027) Private PPA replaces expiring Illinois ZEC support
Susquehanna + AWS (EL25-49) PJM (PA) Up to 1,920 MW FTM PPA through 2042 Pivoted from rejected Nov 2024 BTM ISA to FTM via PPL
Palisades Restart (Holtec) MISO (MI) 800 MWe; $1.52B DOE loan/guarantee; Mode 6 Aug 2026 First US commercial restart; Oct 2026 fuel hurdle cleared
Duane Arnold (NextEra / Google) MISO (IA) 615 MW; 25-yr Google PPA (target early 2029) 25-yr clean-firm hyperscaler restart contract

State ZEC Offsets, Hyperscaler PPAs & PJM Co-Location Litigation

Under IRC § 45U(b)(2)(B), gross receipts capture wholesale electricity sales, ancillary services, and state Zero-Emission Credit (ZEC) or Carbon Mitigation Credit (CMC) payments in New York, Illinois, and New Jersey (excluding § 45U itself). Once combined receipts pass $26.00/MWh, state ZECs trigger an 80% federal § 45U clawback until hitting zero at $44.75/MWh.

This dynamic accelerated direct 20-to-25-year hyperscaler PPAs: Constellation's 1,121 MW Meta contract at Clinton (starting June 2027) replaces expiring Illinois ZECs and backs license renewal; Constellation's 835 MW Microsoft PPA at Crane (TMI-1); NextEra's 615 MW 25-year Google PPA at Duane Arnold (targeting early 2029); and Holtec's 800 MWe Palisades restart in Michigan (which began core fuel loading August 30, 2026 and cleared a bowed assembly in October 2026). Restarted units also evaluate IRC §§ 45Y/48E alongside § 45U. Separately, IRS Notice 2024-29 addresses clean-hydrogen sales attribution.

FERC Docket No. EL25-49 & The Behind-the-Meter Pivot

After rejecting Talen Energy and AWS's 480 MW behind-the-meter Susquehanna ISA on November 1, 2024 over ratepayer cost-shifting, FERC opened Docket EL25-49 on February 20, 2025 finding PJM's OATT unjust on co-located loads. Talen and AWS pivoted in June 2025 to a front-of-the-meter PPA via PPL Electric Utilities scaling up to 1,920 MW through 2042. FERC's December 20, 2025 order (193 FERC ¶ 61,217) and June 2026 rehearing order (195 FERC ¶ 61,209) lock in network-cost allocation and metering rules for co-located data centers.

Prohibited Foreign Entities (Notice 2026-15) & Fuel-Cycle Diligence

Enacted July 4, 2025, P.L. 119-21 (OBBBA) § 70510 spared § 45U from the early cuts applied to wind and solar under §§ 45Y/48E, preserving § 45U through December 31, 2032 alongside §§ 6418 and 6417 while inserting Prohibited Foreign Entity (PFE) bars under IRC § 7701(a)(51)–(52):

Comparing § 45U Against European Nuclear Mechanisms & Equity Strategy

Unlike France's post-ARENH VNU clawbacks above €78/MWh and €110/MWh or Sweden's two-way CfDs, US § 45U protects downside cash flows below $26/MWh while leaving 100% of market and hyperscaler PPA upside uncapped above $44.75/MWh.

Executive Regulatory & Tax-Equity Q&A

Are there public reports or SEC filings showing how IRC Section 45U performs in practice?
Yes. JCT initially scored § 45U at roughly $30 billion over FY2022–FY2031, while RFF, Princeton's REPEAT Project, and CRS confirm it acts as a downside floor that prevents merchant retirements without paying out above $44.75/MWh. In SEC Form 10-K filings, Constellation Energy recorded $1.38 billion in § 45U benefits through Q3 2024 before higher 2025 PJM prices trimmed accruals, Vistra disclosed $545 million in estimated 2024 PTC revenue ($281 million Texas, $264 million East), and PSEG reported PJM clearing prices kept Salem and Hope Creek near or above the collar.
What are the IRS inflation-adjusted Section 45U rates and thresholds for 2024, 2025, and 2026?
For 2024, unadjusted statutory figures applied: $0.003/kWh base, $0.015/kWh ($15/MWh) with the 5x prevailing-wage multiplier, and a $0.025/kWh ($25/MWh) gross-receipts threshold phasing out at $43.75/MWh. Under IRS Notice 2025-37 (factor 1.0242) for 2025 and Notice 2026-41 (factor 1.0539) for 2026, rounding kept the credit at $0.003/$0.015 per kWh while lifting the gross-receipts threshold to $0.026/kWh ($26/MWh), shifting the zero-out ceiling to $44.75/MWh.
How did the 2025 One Big Beautiful Bill Act (P.L. 119-21) change Section 45U?
Enacted July 4, 2025, OBBBA (P.L. 119-21 § 70510) preserved § 45U through December 31, 2032, plus § 6418 transferability and § 6417 elective pay. However, it barred Specified Foreign Entities (SFEs) for tax years beginning after July 4, 2025, and broader Foreign-Influenced Entities (FIEs) after July 4, 2027, under IRS Notice 2026-15 interim guidance.
How do state Zero-Emission Credits (ZECs) and data-center PPAs interact with Section 45U gross receipts?
Under IRC § 45U(b)(2)(B), gross receipts include wholesale electricity sales, grid services, and state ZEC or CMC payments (New York, Illinois, New Jersey), excluding § 45U itself. Above $26.00/MWh (2025–2026), each extra $1.00/MWh trims the 5x credit by $0.80/MWh until zeroing out at $44.75/MWh. Hyperscaler PPAs priced above $44.75/MWh replace federal § 45U payouts with fixed private cash flows.
What did FERC decide in Docket EL25-49 regarding nuclear plant co-location with data centers?
After rejecting Talen and AWS's behind-the-meter Susquehanna ISA on November 1, 2024, FERC opened Docket EL25-49 on February 20, 2025 finding PJM's tariff unjust on co-located loads. Talen and AWS pivoted in June 2025 to a front-of-the-meter PPA up to 1,920 MW through 2042 via PPL Electric Utilities. FERC issued compliance and rehearing orders in December 2025 (193 FERC ¶ 61,217) and June 2026 (195 FERC ¶ 61,209) setting metering and network-cost rules.
How are Section 45U credits monetized under Section 6418, and what prices do transfers clear at?
Nuclear operators sell § 45U credits for tax-free cash to corporate buyers under IRC § 6418 via Form 7213 elections. Crux H1 2026 benchmarks show § 45U credits averaged $0.958 per dollar (95.8 cents), outperforming general PTCs ($0.930) and ITCs ($0.913) and representing 11.8% of tracked transfer volume.

Official Statutes, IRS Bulletins, FERC Orders & SEC Filings

Citations verified against US Public Laws, IRS Bulletins, FERC dockets, SEC filings, and JCT/CRS reports through November 2026.

Regulatory Verification & Primary Basis

Statutory rates, CPI factors, FERC docket citations, and 10-K benchmarks are verified against enacted US Public Laws, IRS Bulletins, FERC orders, and SEC filings.

Mechanism Status Authority Effective Window Key Threshold
§ 45U Revenue-Floor Collar Active Statute US Congress / IRS (Notices 2025-37 & 2026-41) Jan 1, 2024 to Dec 31, 2032 $15/MWh (5x PW); $26–$44.75/MWh phase-out
PFE & Co-Location Rules Mandatory Compliance IRS (Notice 2026-15) / FERC (EL25-49) SFEs post-July 4, 2025; FIEs post-July 4, 2027 SFE/FIE exclusion; PJM cost-allocation rules
Primary-Source Anchoring: Anchored to 26 U.S.C. § 45U, P.L. 119-21 § 70510, IRS Notices 2024-29, 2025-37, 2026-15, and 2026-41, FERC EL25-49, and SEC 10-K filings.
Diligence Protocol Sponsors should verify prevailing-wage audits, state ZEC netting, § 6418 settlement terms, and SFE/FIE ownership tests before close.
Authored & Verified by Khaled Shawky · Senior Data Analyst, Energy Solutions Intelligence Verification Cycle: November 2026