Türkiye YEKDEM: Decree 7189 Tariffs & Support Rules

Under Law No. 5346 and Presidential Decree No. 7189 (Official Gazette, 1 May 2023), Türkiye's updated YEKDEM mechanism grants 10- to 15-year Turkish Lira feed-in support to YEK-certified renewable plants entering operation between 1 July 2021 and 31 December 2030. Tariffs adjust monthly via a 60%-FX / 40%-inflation basket bounded by hard USD-cent/kWh floors and ceilings, starting at 4.95–6.05¢/kWh for solar and onshore wind, and rising to 5.85–7.15¢/kWh for storage-integrated renewables.
Presidential Decree 7189 COD Window: Jul 2021–Dec 2030 Hard USD Floor & Cap Collar
Solar / Onshore Wind
4.95–6.05¢
USD/kWh collar · 10 yrs
Wind/Solar + BESS
5.85–7.15¢
10 yrs + 10-yr local bonus
Monthly Index Basket
60% FX / 40% CPI
30% USD · 30% EUR · 25% PPI · 15% CPI
2026 YEKA Tenders
2,285 MW
GES 3.25€c · RES 3.50€c floors

Institutional Regulatory Summary

Mechanism Status Authority Effective Window Key Threshold
YEKDEM v3.0 (Law No. 5346 · Decree No. 7189)
Tax Credits & Subsidies · Türkiye
Enacted · Active Through 2030 MENR, EPDK (EMRA) & EXIST (EPİAŞ) COD 1 Jul 2021 – 31 Dec 2030 · 10–15 Yr Support Monthly TRY basket (30% USD/30% EUR/25% PPI/15% CPI) with hard USD floors & caps

Complete Decree No. 7189 USD Floor & Ceiling Collar by Technology

Older international reports still cite Türkiye's legacy pre-2021 USD feed-in tariffs ($7.30¢/kWh wind, $13.30¢/kWh solar), which expired permanently on 30 June 2021. After an interim Lira-only scheme (Decree No. 3453) struggled to attract foreign equity amid high inflation and currency depreciation, Ankara enacted Presidential Decree No. 7189 on 1 May 2023. The reform kept payments legally denominated in Turkish Lira (TRY) while installing a binding USD-cent/kWh floor and ceiling collar across 12 distinct renewable categories, including, for the first time, battery-integrated renewables, offshore wind, and pumped-storage hydro.

Renewable Technology Category USD Floor (¢/kWh) USD Ceiling (¢/kWh) Base Support Term Local-Content Bonus Term
Solar PV (Utility Licensed) 4.95 ¢ 6.05 ¢ 10 years 5 years
Onshore Wind 4.95 ¢ 6.05 ¢ 10 years 5 years
Wind or Solar Integrated with Storage (BESS) 5.85 ¢ 7.15 ¢ 10 years 10 years
Offshore Wind 6.75 ¢ 8.25 ¢ 10 years 5 years
Hydroelectric: Run-of-River 6.30 ¢ 7.70 ¢ 10 years 5 years
Hydroelectric: Reservoir 6.75 ¢ 8.25 ¢ 10 years 5 years
Hydroelectric: Pumped Storage 9.45 ¢ 11.55 ¢ 15 years 10 years
Geothermal Power 9.45 ¢ 11.55 ¢ 15 years 5 years
Biomass: Biomethanization 8.10 ¢ 9.90 ¢ 10 years 5 years
Biomass: Thermal Disposal 5.75 ¢ 8.00 ¢ 10 years 5 years
Biomass: Landfill / Solid Waste 4.95 ¢ 6.05 ¢ 10 years 5 years
Wave or Tidal Energy 6.30 ¢ 7.70 ¢ 10 years 10 years

Inside the Monthly TRY Escalation Formula (60% FX / 40% Inflation)

Every month, Türkiye's electricity market operator EXIST (EPİAŞ) recalculates the active Turkish Lira tariff for YEKDEM-enrolled generators using a four-component indexation basket designed to bridge domestic inflation and hard-currency equipment costs:

Once the updated Lira figure is calculated, EXIST converts it into USD cents using the Central Bank of Türkiye's (CBRT) average daily buying exchange rate from the preceding month. If that USD-equivalent price drops beneath the technology's statutory floor (for instance, below 4.95¢/kWh for solar), the payout snaps up to the floor. Conversely, if Turkish Lira inflation outpaces FX depreciation and pushes the USD equivalent above the ceiling (6.05¢/kWh for solar), payouts are clipped at the ceiling. For equity sponsors, this collar eliminates catastrophic FX tail-downside while still leaving an operating band (~22% spread between floor and ceiling) that fluctuates with Türkiye's real exchange rate.

YEKDEM vs. YEKA GES/RES-2026 & Storage-Integrated Pre-Licenses

Investors entering Türkiye must distinguish carefully between three parallel development pathways operating under Law No. 5346 and Electricity Market Law No. 6446:

1. Storage-Integrated YEKDEM Projects

Under EMRA's storage regulations, developers committing to build 1:1 MWh battery storage alongside wind or solar obtain direct grid connection capacity without entering a competitive YEKA auction and qualify for Decree 7189's enhanced 5.85–7.15¢/kWh collar plus a 10-year domestic-component bonus. This track has drawn gigawatts of private equity-backed pre-license applications.

2. YEKA Competitive Auctions (2025–2026)

Separate from YEKDEM, the Ministry of Energy allocates state-designated Renewable Energy Resource Zones (YEKA). Following 650 MW signed under YEKA GES-2025, YEKA GES-2026 awarded 785 MW across 11 lots at the 3.25 €c/kWh floor (plus €16k–€91k/MW upfront contribution fees totaling €31.58M), while YEKA RES-2026 awarded 1,500 MW across 7 wind zones at the 3.50 €c/kWh floor (€62.9M total contribution fees, averaging ~€42k/MW).

3. Unlicensed Industrial Self-Consumption

Industrial energy buyers building behind-the-meter or off-site self-consumption solar under EMRA's Unlicensed Generation Regulation offset retail industrial tariffs directly rather than entering YEKDEM, though surplus exports are subject to strict monthly net-metering caps tied to historical facility consumption.

Local-Content Auditing, Annual Election & Merchant Opt-Out Strategy

Annual Opt-In Flexibility: Unlike rigid European CfDs that lock generators into two-way payback obligations for 15 years, YEKDEM preserves an asymmetric annual election. Generators holding valid YEK certificates notify EPDK prior to the annual enrollment cutoff (traditionally 31 October) to participate in YEKDEM for the following calendar year. Whenever Turkish Day-Ahead spot prices on EPİAŞ trade meaningfully above the YEKDEM ceiling, sponsors can elect to stay merchant for the upcoming calendar year and return to YEKDEM in subsequent years if wholesale prices soften.

Domestic Manufacturing Verification: Capturing the 5-year (or 10-year for storage/pumped hydro) local-content bonus requires audited domestic-origin certification under Ministry of Energy component tables, covering domestically produced PV modules/ingots/cells, inverters, wind turbine towers, blades, generators, or battery packs. Türkiye's domestic solar and wind manufacturing base (including local blade facilities established by global OEMs such as Nordex and domestic module lines) makes local-content qualification realistic, provided EPC procurement contracts enforce audit-ready certificate delivery prior to provisional acceptance.

Key Underwriting Checkpoints for Equity Sponsors: Confirm that the SPV holds an active EPDK generation license (not merely a pre-license facing milestone forfeiture), verify TEİAŞ transmission capacity allocation and transformer substation readiness, stress-test Lira/USD monthly conversion lags between generation month and EPİAŞ settlement payout, and confirm compliance with EMRA's equity-backed guarantee letters for storage-integrated projects.

Executive Regulatory Q&A

What are the YEKDEM floor and ceiling prices for solar and wind in Türkiye under Decree 7189?
Under Presidential Decree No. 7189 covering facilities commissioned from 1 July 2021 through 31 December 2030, standalone solar PV and onshore wind plants receive a 10-year Turkish Lira tariff collared between a floor of 4.95 USD cents/kWh and a ceiling of 6.05 USD cents/kWh. Wind or solar plants integrated with battery storage receive a higher 5.85 to 7.15 USD cents/kWh collar plus 10 years of local-content eligibility.
How does the YEKDEM monthly Turkish Lira escalation basket protect against currency devaluation?
EXIST (EPİAŞ) recalculates Lira-denominated YEKDEM tariffs every month using a composite basket weighted 30% USD, 30% EUR, 25% Domestic Producer Price Index (Yi-ÜFE), and 15% Consumer Price Index (TÜFE). The result is then converted into USD cents using the Central Bank of Türkiye's prior-month average purchase rate and clamped strictly between the statutory USD floor and ceiling.
Which technologies qualify for 15-year YEKDEM support instead of 10 years?
Presidential Decree No. 7189 extends base YEKDEM feed-in support to 15 years specifically for geothermal power plants and pumped-storage hydroelectric facilities, both carrying a 9.45 to 11.55 USD cents/kWh collar. All other covered categories, including solar, onshore/offshore wind, storage-integrated renewables, run-of-river hydro, reservoir hydro, biomass, and wave/tidal—receive a 10-year base term.
How long does the YEKDEM local-content bonus last under Decree 7189?
Projects incorporating certified Turkish-manufactured mechanical and electromechanical components receive an additional domestic-component tariff premium for 5 years across standard solar, wind, hydro, geothermal, and biomass plants. That domestic-content bonus doubles to 10 years for storage-integrated wind/solar plants, pumped-storage hydro, and wave or tidal installations.
How does YEKDEM differ from Türkiye's YEKA GES-2026 and YEKA RES-2026 auctions?
YEKDEM is a statutory feed-in support framework under Law No. 5346 for licensed renewable plants holding YEK certificates (including storage-integrated EMRA pre-licenses). YEKA (Renewable Energy Resource Zones) allocates large state-designated zones via competitive bidding; in 2026, YEKA GES awarded 785 MW at a 3.25 €c/kWh floor and YEKA RES awarded 1,500 MW at a 3.50 €c/kWh floor, with winners competing on upfront contribution fees per MW.
Can a licensed plant switch between YEKDEM and merchant EPİAŞ spot sales?
Yes, on an annual election basis. Eligible YEK-certified generators apply to EPDK (EMRA) before the statutory annual deadline (typically October 31) to enroll in YEKDEM for the upcoming calendar year. When wholesale Turkish spot market prices trade significantly above the YEKDEM ceiling, sponsors may opt out for the following year to sell into the Day-Ahead Market or bilateral PPAs.

Official Turkish Legal & Energy Sources

Tariff collars, basket weights, support periods, and YEKA benchmarks are verified directly against Türkiye's Official Gazette and Ministry of Energy records.

Regulatory Verification & Primary Basis

Every USD-cent collar figure, monthly index weight, and YEKA tender floor in this dossier is anchored directly to Presidential Decree No. 7189, Law No. 5346, and official MENR/EPDK regulatory frameworks.

Primary-Source AnchoringAll 12 technology tariff collars, support durations, and local-content windows are verified against Official Gazette No. 32177 (1 May 2023) rather than expired pre-2021 USD tables.
Underwriting & Diligence ProtocolBefore finalizing EPC contracts or pre-license acquisitions in Türkiye, sponsors should confirm live EXIST monthly YEKDEM announcements, EPDK license validity, and domestic-component certification rules with local energy counsel.
Reviewed & Verified by Khaled Shawky · Lead Energy Policy & Infrastructure Analyst, Energy Solutions Intelligence Verification Cycle: November 2026