| Mechanism | Status | Authority | Effective Window | Key Threshold |
|---|---|---|---|---|
| Investment Contract (Convention d'Investissement) Bespoke agreement granting fiscal, customs & land benefits | Enacted, Operational since 2025 circular | Ministry of Investment, Convergence & Evaluation of Public Policies (MICEPP) | Open-ended; project-specific negotiation | Min. MAD 1.5bn capex or 500 MW electrolyzer capacity |
| State Land Concession (Concession de Domaine Public) Long-term usufruct for production, storage, export infrastructure | Enacted, CHbika 1 precedent set Sep 2025 | MICEPP / Ministry of Economy & Finance / Regional walis | Aligned with project phasing (typically 30–99 yrs) | Technical & financial viability dossier approved by MEM |
| Customs Duty Exemption (Exonération Droits de Douane) Full relief on imported electrolyzers, solar/wind kit, desalination units | Enacted, Finance Law 2025 Art. 12 bis | Customs Administration (ADII) / Ministry of Economy & Finance | Construction & commissioning phase (max 5 yrs from contract signature) | Equipment listed in approved investment contract annex |
| Corporate Tax Holiday (Exonération IS) Full exemption followed by reduced 8.75% rate for export revenue | Enacted, General Tax Code Art. 6-I-3° as amended 2025 | Direction Générale des Impôts (DGI) | 5–20 yrs full exemption; reduced rate thereafter | Export-oriented production; min. 70% output for international markets |
| VAT Suspension & Recovery (TVA Suspendue/Récupérable) Suspension on imports; full recovery on domestic purchases for capex | Enacted, VAT Code Art. 92-1 as amended 2025 | DGI / Customs Administration | Project development through commercial operation date | Qualifying capital goods per investment contract schedule |
Morocco's green hydrogen incentive structure does not reside in a single statute but in the Morocco Offer, a policy package formalized by the Head of Government's circular of March 2025, issued under Royal High Directives. The circular instructs all ministries and regional authorities to prioritize green hydrogen projects through a "single window" coordinated by the Ministry of Investment, Convergence and Evaluation of Public Policies (MICEPP). This administrative act carries binding force on the executive branch; it is not a parliamentary law but operates as a directive d'application that unlocks existing fiscal tools in the General Tax Code, Customs Code, and State Domain Code.
The Energy Ministry (MEM) retains technical gatekeeping: it validates project viability, grid integration studies, and water resource allocations (including desalination coupling). MICEPP then negotiates the Investment Convention, a bilateral contract between the State and the project company, which codifies the specific tax holidays, customs relief, and land terms. Each convention requires countersignature by the Ministry of Economy and Finance, ensuring fiscal coherence. As of November 2026, six conventions have been signed; three more are in advanced negotiation.
| Legal Instrument | Source | Binding Nature | Amendment Path |
|---|---|---|---|
| Head of Government Circular (Mar 2025) | MICEPP Official Gazette | Binding on administration | New circular or Royal Directive |
| Finance Law 2025 (Art. 12 bis, 45 ter) | Parliament / Official Bulletin | Statutory, requires parliamentary vote | Annual Finance Law |
| General Tax Code Art. 6-I-3° (amended) | DGI / Official Bulletin | Statutory | Parliamentary amendment |
| State Domain Code (Dahir 1-17-07) | Ministry of Economy & Finance | Regulatory, decree-level | Government decree |
The September 2025 government communiqué confirming the CHbika 1 project's preliminary phase clearance marks the first operational test of this architecture. CHbika 1, a 1.2 GW electrolyzer complex coupled with 3 GW of dedicated wind/solar in the Guelmim-Oued Noun region, received a 99-year land concession over 12,000 hectares and a 20-year corporate tax holiday. Its convention serves as the template for subsequent negotiations.
The fiscal envelope for green hydrogen projects combines three layers: a construction-phase shield (customs duty exemption + VAT suspension), an operational-phase holiday (corporate tax exemption), and a permanent export-rate preference (reduced 8.75% IS on export revenues vs. standard 31%). These are not automatic; they are earned through the investment convention's milestone schedule.
Customs relief under Finance Law 2025 Article 12 bis covers electrolyzer stacks, power electronics, renewable generation equipment, desalination units, hydrogen compression/storage gear, and associated civil works materials. The exemption applies at the point of import declaration; the project company presents the convention annex listing approved equipment. VAT suspension (Article 92-1 VAT Code) operates similarly: imports enter without VAT payment; domestic purchases generate recoverable input credit. Recovery claims are filed quarterly with the DGI; refunds typically process within 60 days per convention service-level commitments.
The corporate tax holiday duration scales with project size and export orientation. The CHbika 1 convention establishes the benchmark: 20 years full exemption for projects exceeding 1 GW electrolyzer capacity with >80% export ratio. Projects between 100 MW–1 GW receive 10–15 years; below 100 MW, 5–7 years. After the holiday, the 8.75% export rate applies indefinitely provided the export threshold (70% of production) is maintained annually. Failure triggers reversion to standard 31% rate prospectively, not retroactively.
| Project Tier | Electrolyzer Capacity | Full IS Exemption | Export Ratio Required | Post-Holiday Rate |
|---|---|---|---|---|
| Strategic (CHbika class) | > 1 GW | 20 years | > 80% | 8.75% |
| Major | 500 MW – 1 GW | 15 years | > 75% | 8.75% |
| Standard | 100 – 500 MW | 10 years | > 70% | 8.75% |
| Pilot / Demonstration | < 100 MW | 5–7 years | > 60% | 8.75% |
No production tax credit (PTC) or investment tax credit (ITC) exists in the U.S. sense. The Moroccan model front-loads relief via customs/VAT shields and back-loads via the tax holiday. Sponsors should model economics on equity IRR with milestone-based grant equivalents rather than debt-service metrics.
Access to state domain (domaine public de l'État) is the most distinctive feature of the Morocco Offer. Unlike private land purchase, the concession grants usufruct rights (droit de jouissance) for up to 99 years, renewable, with the State retaining bare ownership. The process begins with a demande d'affectation filed at the regional wali's office, accompanied by the MEM technical approval and a preliminary environmental impact notice. The wali forwards the dossier to MICEPP for convention drafting.
Concession fees are nominal, typically MAD 1–5 per m² per year, but the convention imposes development obligations: financial close within 24 months, construction start within 30 months, commercial operation within 60 months. Failure triggers a mise en demeure (formal notice) and potential reversion after 12 months' cure period. The CHbika 1 concession includes a clause de substitution allowing the State to designate a replacement sponsor if the original defaults, protecting sunk infrastructure value.
Water access is addressed via a parallel convention d'eau with the Ministry of Equipment and Water. For coastal projects (all current pipeline), this mandates desalination coupling: the project must finance and operate a dedicated desalination plant sized for 1.5x electrolyzer water demand, with surplus allocated to regional agriculture. The water convention runs coterminous with the land concession. Grid connection is governed by a separate convention de raccordement with ONEE (Office National de l'Électricité et de l'Eau Potable), which commits to evacuating power from the project's dedicated renewables at a regulated wheeling charge (currently MAD 0.08/kWh).
As of November 2026, the Morocco Offer has moved from circular to contract reality. Six investment conventions are executed; three are in final negotiation; twelve expressions of interest have passed the MEM technical filter. The pipeline reflects a deliberate geographic spread: three projects in Guelmim-Oued Noun (CHbika 1, 2, and a TotalEnergies-led consortium), two in Dakhla-Oued Ed-Dahab (including the 2 GW "H2 Dakhla" venture), and one in Laâyoune-Sakia El Hamra (ACWA Power / Masen joint development).
The September 2025 CHbika 1 clearance triggered a calibration review within MICEPP. Two adjustments emerged in the 2026 Finance Law: (1) a new local content requirement, 30% of capex must flow to Moroccan goods/services by commercial operation, verified by an independent auditor; (2) a community development fund, 0.5% of annual revenue allocated to a regional fund managed by the wali, earmarked for skills training and water infrastructure. Both apply to conventions signed after January 2026; existing conventions are grandfathered.
On the international front, the EU-Morocco Green Partnership (signed October 2025) includes a hydrogen corridor workstream aligning Moroccan certification with EU RFNBO (Renewable Fuels of Non-Biological Origin) rules. MEM is drafting a national hydrogen certification decree (expected Q1 2027) that will define "green" thresholds (likely < 3.38 kgCO₂e/kgH₂ well-to-gate) and establish a registry. This decree will not alter existing conventions but will condition future offtake eligibility for European buyers.
No sovereign guarantee or offtake backstop exists. Revenue certainty derives from long-term offtake agreements (typically 15–20 years) with European industrial buyers (steel, ammonia, shipping) structured as take-or-pay contracts under English or New York law with Shariah-compliant profit-sharing mechanics (murabaha or istisna'a). Sponsors should verify counterparty creditworthiness and ensure offtake currency (EUR/USD) matches equity return expectations.
All statutory instruments, regulatory thresholds, and 2025-2026 implementation milestones are anchored to primary government registers and national regulators.
This dossier maps Morocco's green hydrogen support regime through primary sources: the March 2025 Head of Government circular (Morocco Offer), Finance Law 2025 amendments, General Tax Code provisions, and the September 2025 CHbika 1 clearance communiqué. Analysis distinguishes binding statutory instruments (Finance Law, Tax Code) from administrative directives (circular) and contractual commitments (investment conventions). All fiscal parameters, land terms, and milestone obligations are traced to their legal source with effective dates through November 2026.
Explore technical benchmarks, engineering calculators, and supply-chain intelligence aligned with this policy.