This brief revives a 2005 patent for a bidirectional EV charger that failed due to cost and complexity. The 2026 version uses GaN transistors, a modular H-bridge topology, and AI-driven grid forecasting to make V2G economically viable, unlocking revenue streams for EV owners and grid stability for utilities.
The 2005 patent relied on silicon IGBTs with high switching losses, requiring bulky cooling systems that made the bidirectional charger too expensive and inefficient. The control algorithms were simplistic, unable to handle real-time grid dynamics, and lacked communication standards for grid integration. Additionally, battery degradation concerns and lack of regulatory incentives made V2G unattractive.
The 2026 Technical Brief replaces silicon IGBTs with gallium nitride (GaN) transistors, which reduce switching losses by 80%. A modular H-bridge topology enables high-frequency (100 kHz) operation, shrinking magnetics and cooling. AI-driven grid forecasting and ISO-market price prediction optimize charging/discharging schedules, while V2G communication standards (ISO 15118) and bi-directional inverters enable seamless grid integration. This cuts hardware cost by 50% and improves round-trip efficiency to 96%.
Interactive ROI Simulator
Adjust annual production volume to estimate ROI and Profit.
- GaN HEMT Power Modules (e.g., 650V, 60A)High-frequency switching for DC-AC conversion
- DSP Controller (e.g., TMS320F28379D)Real-time control of power electronics and communication
- Isolated DC-DC Converter (e.g., CLLC resonant)Battery-to-grid voltage matching and isolation
- Inductor and Transformer (nanocrystalline cores)High-frequency magnetics for filtering and conversion
- Liquid Cooling Plate with PumpThermal management for GaN modules
- Metering and Relay (ANSI C12.20)Bi-directional energy metering and safety disconnect
- Communication Module (PLC/4G)ISO 15118 and grid communication
- Housing and Connectors (SAE J1772)Vehicle interface and mechanical protection