This blueprint revives a 2006 patent for a liquid-cooled charging cable, upgrading it with 2026 phase-change slurry technology. The result: a cable that handles 4.5 MW continuous charging with 40% less weight and 30% lower cooling energy, making megawatt charging practical for heavy-duty EVs.
The original 2006 concept used conventional liquid coolants (water-glycol) that required large pumps and radiators, adding weight and parasitic losses. The cable diameter was limited by the need for large coolant channels, and the thermal conductivity of the coolant was insufficient to handle currents above 600 A without overheating. The cost of the cooling system was prohibitive for the then-nascent EV market, and the patent lapsed.
Replace the single-phase coolant with a phase-change slurry (microencapsulated phase-change material, MEPCM, suspended in a dielectric fluid). The slurry absorbs latent heat during charging, allowing much higher heat flux without raising coolant temperature. This reduces required flow rate by 70%, slashing pump size and parasitic losses. Additionally, use topology-optimized finned inner liner to enhance heat transfer. The result: a cable that handles 4.5 MW (3000 A at 1500 V) with a 40% reduction in cable weight and 30% lower cooling energy.
Interactive ROI Simulator
Adjust annual production volume to estimate ROI and Profit.
- High-conductivity copper conductor (e.g., 99.99% Cu) with custom strandingCarries 3000 A with minimal resistive losses
- Microencapsulated phase-change material (MEPCM) - paraffin wax core with polymer shellProvides high latent heat capacity to absorb transient heat spikes, reducing coolant flow requirements
- Dielectric coolant fluid (e.g., ester-based transformer oil) with low viscosityServes as carrier fluid for MEPCM and provides electrical insulation
- Topology-optimized finned inner liner (additively manufactured aluminum or polymer)Enhances heat transfer from conductor to coolant by increasing surface area and promoting turbulent flow
- Flexible outer jacket (silicone or thermoplastic elastomer) with high abrasion resistanceProtects internal components and provides mechanical flexibility for handling
- Compact pump and heat exchanger unit (e.g., gear pump with integrated brazed plate heat exchanger)Circulates slurry and rejects heat to ambient, sized for 70% lower flow rate
- Temperature and flow sensors with feedback controlMonitors coolant temperature and adjusts pump speed to maintain optimal thermal performance
- Automated connector with locking mechanism and alignment guidesEnsures safe and reliable connection for high-current, high-voltage charging