Subsynchronous Resonance (SSR) is a destructive grid phenomenon where an electrical network exchanges energy with a generator's mechanical shaft at frequencies below the fundamental grid frequency (e.g., 10-40 Hz on a 60 Hz grid). Unmitigated SSR can literally shear multi-ton turbine shafts in half.
Historically caused by the interaction between series-compensated transmission lines and the torsional mechanical modes of steam turbines, modern SSR (often called SSCI) is increasingly driven by the control loops of Type 3 (DFIG) and Type 4 wind turbines interacting with weak, series-compensated grids. The inverter's fast controllers exhibit negative damping at subsynchronous frequencies.
Frequency Scan Analysis
Engineers perform impedance frequency scans across 1-59 Hz to identify network resonant points with negative equivalent resistance.
Torsional Modeling
Spring-mass-damper models of turbine-generator shafts identify mechanical natural frequencies susceptible to excitation.
EMT Control Interaction Screening
Detailed PSCAD simulations inject small subsynchronous signals to check if inverter control loops amplify or damp the oscillations.
Active Damping Implementation
If risk is high, supplementary subsynchronous damping controllers (SSDC) are added to the wind plant's main controller or to a local FACTS device.
- Black-Box Models: Analyzing SSCI requires proprietary, encrypted EMT models from inverter manufacturers, making utility-wide studies extremely difficult.
- Topology Changes: A grid topology change (like a line trip) instantly alters the network's resonant frequency, requiring adaptive damping controls.
- Multi-Vendor Interaction: Complex oscillations occur when wind turbines from different manufacturers interact with each other's control loops.