Post-Combustion Carbon Capture (Amine Scrubbing)

Amine CaptureFlue Gas Scrubbing
Updated: 2026-08-15
TRL: 9 / 9
Global Coverage
Section I · Technical Overview
What is Post-Combustion Carbon Capture (Amine Scrubbing)?

Post-Combustion Capture is the brute-force method of decarbonization. It bolts a massive chemical plant onto the exhaust stack of an existing coal or gas facility, using liquid solvents to chemically scrub the CO2 out of the dilute, low-pressure exhaust gas before it escapes into the atmosphere.

Section II
The Engineering Reality

Flue gas from a standard power plant is mostly Nitrogen, with CO2 concentrations at a dismal 4% (gas) to 14% (coal). The gas is cooled and blown upward through a massive absorber column. A liquid amine solvent (like MEA) rains down, chemically reacting with the CO2. The 'rich' solvent is pumped to a stripper column and boiled (using steam stolen from the power plant's turbine). The heat breaks the chemical bond, releasing pure CO2 gas and regenerating the 'lean' solvent to be used again.

Thermal Regeneration Penalty
$$ Q_{regen} = Q_{sensible} + Q_{reaction} + Q_{vaporization} $$
Q_reaction = The exact thermodynamic heat required to break the strong CO2-Amine chemical bondQ_vaporization = Wasted heat used to accidentally boil the water mixed with the solventQ_regen = Total steam stolen from the power plant, severely crippling its electrical output
1

Flue Gas Conditioning

Before capture, the exhaust must be violently scrubbed of SOx and NOx; these impurities will permanently bond with and destroy the expensive amine solvent.

2

Absorption

The gas flows through packed beds to maximize surface area, allowing the amine to capture ~90% of the passing CO2 molecules.

3

Stripping & Compression

The solvent is boiled at ~120°C. The released CO2 is then compressed by massive electrical motors to 150 bar for pipeline transport.

Section III · August
Market Impact, Bottlenecks & Key Players
90+%
Target capture efficiency; capturing the final 10% requires exponentially more energy
3-4GJ / Ton
Massive thermal energy requirement to regenerate standard MEA solvent
Retrofit
The primary advantage; this can be bolted onto any existing smokestack without altering the core combustion process
4%
CO2 concentration in a gas turbine exhaust, making it incredibly difficult and expensive to capture compared to coal
⚡ Intelligence: Post-combustion capture is the most commercially mature CCUS technology, but its economics remain severe. When bolted onto a natural gas plant, the massive steam and electricity required to run the scrubbers and compressors drops the plant's net efficiency from 60% down to ~45%. Without a massive carbon tax or subsidy (like the US 45Q), it is entirely uneconomical for power generation.
Commercial Bottlenecks
  • Solvent Degradation: Oxygen and heat break down the amine molecules over time, creating highly toxic degradation products (nitrosamines) that must be handled.
  • Footprint: The absorption columns required to process the exhaust of a 1GW gas plant are the size of skyscrapers, often requiring more land than the power plant itself.
Key Market Players - August 2026
Mitsubishi Heavy Industries (MHI)
Japan
Dominant global vendor of advanced amine solvent (KS-21) post-combustion capture systems.
Aker Carbon Capture
Norway
Specializing in modular, standardized post-combustion units for mid-sized industrial emitters like cement.
Section IV · Maturity Assessment
Hype vs. Reality - TRL Assessment
TRL Score: 9 / 9 ADVANCED PILOT
Research (TRL 1)Prototype (TRL 5)Commercial (TRL 9)