Grid & Engineering

Hydroprocessed Esters and Fatty Acids (HEFA)

HEFA-SPKRenewable Diesel PathwayWaste Lipid Biojet
Updated: 2026-08-15
TRL: 9 / 9
Global Coverage
Section I · Technical Overview
What is Hydroprocessed Esters and Fatty Acids (HEFA)?

HEFA is currently the only mature, commercially scaled pathway for producing Sustainable Aviation Fuel (SAF). It chemically refines waste cooking oils, animal fats, and plant oils into perfect drop-in replacements for jet fuel and diesel, completely indistinguishable from petroleum products.

Section II
The Engineering Reality

Unlike 'biodiesel' (FAME), which contains oxygen and freezes at high altitudes, HEFA uses high-pressure hydrogen to rip the oxygen atoms out of the fat molecules (deoxygenation). The remaining straight-chain hydrocarbons are then isomerized (branched) and hydrocracked over noble metal catalysts. This creates a pure, oxygen-free synthetic paraffinic kerosene (SPK) that meets the ultra-strict freezing point requirements of jet engines (-47°C).

Triglyceride Hydrodeoxygenation (HDO)
$$ Triglyceride + H2 -> Straight_{Chain, Alkanes} + H2O + Propane $$
Triglyceride = The lipid feedstock (e.g., Used Cooking Oil)H2 = Hydrogen gas required to strip the oxygen atomsStraight_Chain_Alkanes = The resulting renewable diesel/jet precursor (requires further isomerization)
1

Pre-treatment

Waste oils are heavily filtered and bleached to remove metals, salts, and free fatty acids that would instantly poison the downstream hydrotreating catalysts.

2

Hydrodeoxygenation

The cleaned lipids are reacted with high-pressure hydrogen (50-100 bar) over NiMo catalysts at 300°C to remove all oxygen, yielding straight-chain renewable diesel.

3

Isomerization & Hydrocracking

To prevent the fuel from freezing at 35,000 feet, the straight chains are cracked into shorter segments and 'branched' (isomerized) over Platinum/Palladium catalysts.

4

Fractionation

The liquid is distilled to separate the light renewable naphtha, the middle-distillate SAF (Jet fuel), and the renewable diesel.

Section III · August
Market Impact, Bottlenecks & Key Players
95+%
Percentage of global Sustainable Aviation Fuel currently produced via the HEFA pathway
50%
Maximum allowable blending ratio of HEFA-SPK with fossil jet fuel under current ASTM standards
70-80%
Reduction in lifecycle greenhouse gas emissions compared to fossil jet fuel
3-4wt%
Mass of hydrogen required to process 100 kg of lipid feedstock
⚡ Intelligence: HEFA is highly profitable today due to California's LCFS credits and US Federal RINs. Oil majors (Neste, Valero) are rapidly retrofitting traditional petroleum refineries into HEFA biorefineries. However, the global supply of Used Cooking Oil (UCO) and tallow is inherently limited, meaning HEFA cannot mathematically supply the entire global aviation industry.
Commercial Bottlenecks
  • Feedstock Scarcity: The industry is facing a severe shortage of waste lipids. Relying on virgin crop oils (palm or soybean) can undermine the climate benefit due to land-use change and deforestation.
  • Hydrogen Intensity: The process consumes substantial amounts of hydrogen to strip the oxygen. If this hydrogen comes from fossil natural gas (Grey H2), it reduces the fuel's carbon score.
  • Feedstock Traceability: The premium paid for 'Used Cooking Oil' has raised traceability concerns, with reports that virgin palm oil has at times been mislabeled as 'waste' oil for European refineries.
Key Market Players - August 2026
Neste
Finland
The undisputed global pioneer and massive scale operator of HEFA renewable diesel and SAF refineries.
Diamond Green Diesel
USA
A joint venture between Valero and Darling Ingredients, dominating North American HEFA production.
World Energy
USA
Operates the world's first commercial-scale SAF-focused HEFA facility in Paramount, California.
Section IV · Maturity Assessment
Hype vs. Reality - TRL Assessment
TRL Score: 9 / 9 ADVANCED PILOT
Research (TRL 1)Prototype (TRL 5)Commercial (TRL 9)