This is the fundamental regulatory divide in grid economics. Energy-Only markets (ERCOT) pay generators only for the electricity they actually produce. Capacity Markets (PJM, ISO-NE) pay generators a guaranteed salary just to 'exist and be available' 3 years in the future, ensuring the grid has enough physical iron in the ground to survive the hottest day of the year.
In an Energy-Only market, power plants must recover their entire multi-billion-dollar CAPEX through extreme price spikes (scarcity pricing) during summer heatwaves. If politicians cap these price spikes to protect consumers, power plants go bankrupt (The 'Missing Money' problem), leading to blackouts. Capacity markets solve this by running a Forward Auction. The ISO calculates it needs 100 GW of capacity in 2029. Generators bid their MWs. The clearing price pays them a fixed monthly revenue ($/MW-month), completely decoupled from whether they actually generate a single kilowatt-hour of energy.
Load Forecasting
The ISO engineers calculate the expected peak load 3 years ahead, adding a 15% Reserve Margin to ensure reliability.
ELCC Derating
Wind and Solar cannot guarantee they will produce during the peak hour. Engineers apply an Effective Load Carrying Capability (ELCC) derate. A 100MW solar farm may only get paid for 20MW of 'Capacity'.
The Auction
Generators bid their Minimum Offer Price. The market clears where supply meets the demanded Reserve Margin.
Pay-for-Performance
If a plant clears the auction but freezes and fails to start during a crisis (like Winter Storm Elliott), it faces severe financial penalties that can exceed its annual revenue.
- The ELCC Debate: Deciding how much 'Capacity' a 4-hour battery provides compared to a gas plant is highly contentious. As more batteries enter the grid, their ELCC value mathematically plummets.
- Over-procurement: Critics argue Capacity Markets are massive consumer subsidies for fossil plants, resulting in ISOs paying billions for a 25% reserve margin of old coal plants that are rarely used.
- Market Interventions: The Minimum Offer Price Rule (MOPR) battles in PJM showed how easily regulators can tweak auction rules to either ban or heavily subsidize clean energy, destroying investor certainty.