Capacity Factor (CF) and Availability Factor (AF) are the two most conflated metrics in energy finance. CF measures how much energy a plant *actually* produced compared to running at maximum throttle 24/7 (driven heavily by weather). AF measures how often the plant was *physically capable* of running (driven by engineering reliability and maintenance).
For a wind farm, the Availability Factor might be 98%, meaning the turbines were mechanically healthy, the gearboxes were functional, and the grid connection was live 98% of the year. However, its Capacity Factor might only be 40%, because the wind simply didn't blow hard enough for the other 60% of the time. Conversely, a nuclear plant has an AF of 95% and a CF of 93%, because it runs at maximum output nearly every hour it is mechanically available.
O&M Contracting
Turbine OEMs (like Vestas) sign severe contracts guaranteeing 97% Availability Factor. If a gearbox breaks and takes a month to fix, the OEM pays massive liquidated damages.
Yield Forecasting
Independent Engineers (IEs) model decades of weather data to guarantee the P50 Capacity Factor to the banks providing the debt.
Curtailment Tracking
If the grid operator forces a healthy wind farm to shut down due to line limits, it hurts the CF but does NOT count against the OEM's guaranteed AF.
- Offshore maintenance: A single failed component in winter can drop an offshore turbine's AF by 10% because repair vessels cannot sail in 5-meter waves.
- Wake effects and solar clipping artificially cap the CF even when the weather is perfect.