category,regime_or_asset,corridor_or_basis,rate_usd_per_box,unit_freight_impact,pct_of_fob_value,sca_or_capacity_metric,notes SCA_Macro,FY 2022/23 Pre-Crisis Peak,Suez Canal Authority,1800,"25,800+ transits",Baseline,$9.4B-$10.2B revenue,Normal global Asia-Europe container & LNG artery SCA_Macro,FY 2023/24 Initial Shock,Suez Canal Authority,5200,"20,148 transits",-30% rev,$6.6B revenue,Carrier diversions begin Nov-Dec 2023; Drewry ~9% TEU capacity absorbed SCA_Macro,FY 2024/25 Crisis Trough,Central Bank of Egypt,8200,"12,400 transits (-38.5%)",-45.5% YoY rev,$3.6B revenue (-55.1% tonnage),Full year of Cape diversions across major container alliances SCA_Macro,FY 2025/26 Partial Return,Suez Canal Authority,3500,Select strings return,+23% YoY rev,$4.67B revenue,"Spot rates soften to ~$3,500 Rotterdam / ~$4,000 Genoa as slots free up" Solar_PV,650 kW TOPCon 40ft HC (2023 Base),Shanghai -> Rotterdam,1800,0.28 cents/W,3.1%,154 boxes / 100 MW,"FOB $58,500/box (@ $0.09/W); minor share of landed module cost" Solar_PV,650 kW TOPCon 40ft HC (Crisis Peak),Shanghai -> Rotterdam,8200,1.26 cents/W,14.0%,4.56x freight jump,Deflated module FOB magnifies freight share above 14% of factory price Solar_PV,650 kW TOPCon 40ft HC (2026 Norm),Shanghai -> Rotterdam,3500,0.54 cents/W,6.0%,Structural +94% vs 2023,Reflects higher bunker/ETS/war-risk floor even after partial Suez return BESS_DG,5.0 MWh 20ft SOC BESS (2023 Base),Ningbo -> Rotterdam,3800,$0.76/kWh ocean,1.1%,20 boxes / 100 MWh,"FOB $350,000/box (@ $70/kWh); excludes inland crane/road haul" BESS_DG,5.0 MWh 20ft SOC BESS (Crisis Peak),Ningbo -> Rotterdam,16500,$3.30/kWh ocean,4.7%,IMDG Class 9 + PSS,Heavy 40t enclosures pay steep DG deck-slot & Peak Season Surcharges BESS_DG,5.0 MWh 20ft SOC BESS (2026 Norm),Ningbo -> Rotterdam,7800,$1.56/kWh ocean,2.2%,2.05x vs 2023,Higher-density 5-6 MWh enclosures cut specific $/kWh freight by ~30% vs 3.5 MWh Project_Total,100 MW Solar + 100 MWh BESS EPC,154 PV + 20 BESS boxes,1590000,Peak $1.59M vs $0.35M,4.54x surge,2026 Norm: $0.70M,Unhedged CIF spot spikes wipe out 1.2%-1.8% of thin European EPC net margin