category,port_or_scenario,location_vs_hormuz,primary_energy_cargo,transit_days,logistics_cost_usd_k,cost_change_pct,structural_constraint Gulf_Hub,"Jebel Ali (Dubai, UAE)",Inside Strait,"HV transformers, switchgear, BESS, solar, gas turbines",28,442,0.0%,Premier GCC transshipment & project-cargo gateway; 100% Hormuz exposed Gulf_Hub,"Khalifa Port (Abu Dhabi, UAE)",Inside Strait,"Offshore modules, desalination skids, HVDC converters",28,442,0.0%,Deepwater heavy-lift berths serving UAE industrial & nuclear/grid fleets Gulf_Hub,Ras Laffan & Hamad (Qatar),Inside Strait,"LNG cryogenic cold boxes, compressors, 400kV GIS",29,465,0.0%,Zero land bypass for >250t LNG train modules; 20% of global LNG trapped Gulf_Hub,"King Abdulaziz Port (Dammam, KSA)",Inside Strait,"SEC grid transformers, Aramco gas-plant compressors",30,475,0.0%,Direct feed into Eastern Province power & oilfield infrastructure Bypass_Hub,Port of Fujairah / Khorfakkan (UAE),Outside (Gulf of Oman),Emergency bypass heavy-lift & containers,54,1295.00,+193.0%,Hajar Mountain highway grades & overhead bridge clearances cap >350t loads Bypass_Hub,Port of Sohar & Duqm (Oman),Outside (Arabian Sea),"Project cargo, industrial steel, turbines",54,1295.00,+193.0%,Cross-border Oman-UAE-KSA customs & multi-axle heavy-haul permit delays Bypass_Hub,"Yanbu & Jeddah (Red Sea, KSA)",Outside (Red Sea),Emergency Western KSA heavy-lift diversion,70,1915.00,+333.3%,"1,320 km overland haul to Eastern Province; simultaneously exposed to Bab el-Mandeb" Scenario,Baseline Direct Heavy-Lift (350t unit),Normal Hormuz Transit,350t 400kV transformer / H-class gas turbine ($12M),28,442,0.0%,Ocean heavy-lift $420k + baseline insurance $22k Scenario,Elevated War-Risk Transit (1.5% cargo),Contested Hormuz,350t heavy equipment ($12M value),34,770.00,+74.2%,Charter +40% ($590k) + war-risk surge ($180k) + naval convoy wait Scenario,Sohar/Fujairah + 520km Overland,Hormuz Closure Bypass,350t heavy equipment + 20-axle SPMT convoy,54,1295.00,+193.0%,+26 days schedule slip; $680k overland shoring & $115k double-lift Scenario,"Yanbu + 1,320km Trans-Arabian Haul",Full Gulf Blockade,350t heavy equipment to Eastern Province,70,1915.00,+333.3%,"+42 days slip; 1,200 MW CCGT delay exposure = $48.30M @ $1.15M/day"