Category,Corridor_Or_Scenario,Base_Distance_Nm_Or_Km,Detour_Delta_Nm_Or_Km,Delay_Days_Or_Permit_Months,War_Risk_Pct_Or_CLV_Rate_KUSD,Voyage_USD_Or_Reroute_CAPEX_MUSD,BESS_Uplift_USD_Or_60d_Fault_Loss_MUSD,PV_Uplift_USD_Or_Base_CAPEX_MUSD,400MWh_Lot_KUSD_Or_Capacity_MW,Notes Equipment_Detour,Baseline SCS-Malacca-Cape (Shenzhen to Rotterdam),14420,0,0.0,0.05,0,210,29,21,15000-TEU boxship; $126.9k/day; 100-unit 400MWh BESS lot ($42M) vs 280kWp PV FEU ($58k) Equipment_Detour,East-of-Borneo Detour (Mindanao-Makassar-Lombok Strait),15560,1140,4.4,0.35,558360,2167,470,217,15000-TEU boxship; $126.9k/day; 100-unit 400MWh BESS lot ($42M) vs 280kWp PV FEU ($58k) Equipment_Detour,East-of-Philippines + Sunda Bypass (High-Tension Corridor),16310,1890,7.3,0.65,926370,3920,853,392,15000-TEU boxship; $126.9k/day; 100-unit 400MWh BESS lot ($42M) vs 280kWp PV FEU ($58k) Equipment_Detour,Full SCS Exclusion (South of Australia to Cape of Good Hope),18800,4380,15.1,1.15,1916190,7509,1869,751,15000-TEU boxship; $126.9k/day; 100-unit 400MWh BESS lot ($42M) vs 280kWp PV FEU ($58k) Subsea_Cable_Corridor,Sarawak-to-Singapore HVDC Link,720,165,14,265,414.32,88.56,3200,1000,"Jurisdictions: 3 (Malaysia, Indonesia Natuna, Singapore); CLV extra days: 38; 60d outage at 75% LF" Subsea_Cable_Corridor,Vietnam-to-Singapore Offshore Wind HVDC,1000,240,18,285,638.82,110.16,4600,1200,"Jurisdictions: 4 (Vietnam, Malaysia, Indonesia, Singapore); CLV extra days: 52; 60d outage at 75% LF" Subsea_Cable_Corridor,Indonesia (Batam/Sumatra)-to-Singapore HVDC,140,30,6,250,73.50,168.48,1850,2000,"Jurisdictions: 2 (Indonesia, Singapore); CLV extra days: 12; 60d outage at 75% LF" Subsea_Cable_Corridor,Luzon Strait / SCS Grid-SCADA Subsea Fiber Trunk,3400,1650,16,160,147.29,0.00,520,0,"Jurisdictions: 5 (Philippines, Taiwan, China, Vietnam, Singapore); CLV extra days: 44; 60d outage at 75% LF"