Critical_Material,Primary_Export_Port_Complex,Top1_Port_Global_Share_Pct,Top2_Complex_Global_Share_Pct,Port_Level_HHI,30Day_Outage_Stalled_Kt,30Day_Outage_Value_MUSD,Secondary_Port_Reroute_USD_Tonne,30Day_Reroute_Extra_Cost_MUSD,Primary_Physical_Hazard,Backup_Port_Readiness Battery Anode Graphite & Magnet REOs (HS 3801 / 2846),Qingdao / Lianyungang (China),38.0,68.0,3150,45.9,330.5,145,6.7,"Typhoons, port lockdown, export-license customs freezes",Moderate (Shanghai/Ningbo domestic rail shift) Cobalt Hydroxide (HS 2822.00 - DRC Copperbelt),Durban (South Africa) / Dar es Salaam,42.0,68.0,2890,7.4,196.1,380,2.8,"Transnet rail decay, port crane strikes, 2,800 km border queues","Improving via 1,300 km Lobito Corridor rail to Angola" Battery Nickel MHP & Matte (HS 7501 / 2825),Morowali IMIP & Weda Bay IWIP (Indonesia),31.0,54.0,2240,42.6,673.1,210,8.9,"Monsoon swells on captive jetties, Sulawesi seismic zone","Very Low (captive industrial-park berths, no inland rail)" Hard-Rock Lithium Spodumene (HS 2530.90),Bunbury & Port Hedland (Western Australia),28.0,48.0,1780,88.7,93.1,92,8.2,"Pilbara Category 4 cyclones, single-berth shiploader outage",Low-Moderate (long highway road-train shift cuts volume 40%) Purified Phosphoric Acid / LFP Precursor (HS 2809),Jorf Lasfar (Morocco),32.0,44.0,1690,138.7,163.7,85,11.8,"Atlantic winter swells, captive acid-pipeline / tank berth outage",Low (specialized stainless acid-tanker loading arms only at Jorf/Safi) Copper Concentrate & Lithium Carbonate (HS 2603 / 2836),Antofagasta & Mejillones Complex (Chile),16.0,24.0,1120,130.7,1202.4,125,16.3,"Pacific tsunami/seismic shocks, marejada swells, port labor strikes",Moderate (Iquique / Patache / San Antonio coastal shifts)