Category,Event_Or_Asset,Closure_Days_Or_Value_MUSD,Recovery_Days_Or_Carry_Pct,Total_Disruption_Or_Buffer_Days,Demurrage_Or_Daily_Carry_USD,Recommended_Buffer_Cost_USD,Breakeven_Delay_Days,Notes Port_Closure_Shock,"Typhoon / Severe Storm Closure (Ningbo, Kaohsiung, Houston)",3,12.0,15.0,950,0,0,Wait at anchorage (diversion uneconomic) Port_Closure_Shock,Short Labor Strike (Oct 2024 US East Coast ILA Benchmark),3,15.0,18.0,1450,0,0,Partial West Coast rail / Mexico bypass Port_Closure_Shock,One-Week Cyberattack or Port Labor Walkout (Rotterdam / Antwerp),7,35.0,42.0,3100,0,0,Shift to Hamburg / Zeebrugge / Le Havre Port_Closure_Shock,Two-Week Multi-Port Coastwide Strike (US East & Gulf Coast),14,77.0,91.0,6800,0,0,All-water Panama-to-LA/LB + intermodal rail Port_Closure_Shock,Physical Channel Obstruction (2024 Baltimore Key Bridge 11-Wk Block),77,30.8,107.8,9400,0,0,Mandatory diversion to Norfolk / NY-NJ (heavy-lift permit bottleneck) Inventory_Buffer_Sizing,"345 kV Main Power Transformer (GSU, 1 unit)",6.8,14.0,45,2608,117360,1.0,Asymmetry ratio vs $115k/d LD: 44.1x; Single point of failure; 45-day early arrival costs barely 1.02 days of EPC delay Inventory_Buffer_Sizing,Central Inverters & MV Skid Package,18.5,15.0,30,7603,228090,2.0,Asymmetry ratio vs $115k/d LD: 15.1x; Critical electrical BoP path; 30-day bonded yard pays back in 2.0 days of avoided delay Inventory_Buffer_Sizing,"Utility LFP BESS Enclosures (600 MWh, 128 SOCs)",54.0,16.0,21,23671,497091,4.3,Asymmetry ratio vs $115k/d LD: 4.9x; High capital intensity; 21-day staged buffer avoids both stockout and excessive WACC drag Inventory_Buffer_Sizing,Bifacial Solar PV Modules (300 MWdc Rolling Lot),62.0,14.0,14,23781,332934,2.9,Asymmetry ratio vs $115k/d LD: 4.8x; Rolling installation cadence; buffer only active 3-week installation wave (25% of lot) to cut WACC