category,regime_or_route,vessel_or_lock,daily_slots_or_days,max_draft_or_limit,total_cost_usd_k,cost_delta_pct,primary_constraint Canal_State,Normal Wet-Season Capacity,Panamax + Neopanamax,36 slots/day,50.0 ft (15.24 m),95 (MPP toll),0.0%,200M liters freshwater per transit from Gatun Lake Canal_State,2023-24 El Nino Drought Trough,Rationed Locks,24 slots/day (-33.3%),44.0 ft (13.41 m),3700-4000 (peak auction),"+3,800% slot peak",6 ft draft cut forces 25%-30% container light-loading; 18-21d unbooked queues Canal_State,Late 2026 Stabilized Recovery,10 Neo + 23 Panamax,33 slots/day,49.0 ft (14.94 m),130-500/TEU surcharge,Elevated floor,$1.6B Rio Indio reservoir (9 km tunnel) not online until early 2030s Heavy_Cargo,1. Baseline Direct Panama Transit,350t Tx (Busan -> Houston),32 days,32.3m Panamax beam,460,0.0%,Standard booked Panamax transit ($95k toll + $365k ocean/lift) Heavy_Cargo,2. Drought Unbooked Anchorage Wait,350t Tx (18d Balboa wait),50 days (+18d),Unreserved MPP queue,1036,+125.2%,18d x $32k/day MPP demurrage = $576k idle charter burn Heavy_Cargo,3. Cape Horn / Good Hope Detour,350t Tx (+16d ocean),48 days (+16d),Zero overland weight cap,1069,+132.4%,+$704k charter/bunker minus $95k toll; preferred for >350t out-of-gauge modules Heavy_Cargo,4. US West Coast Schnabel Land-Bridge,Long Beach -> Houston Rail,34 days (+2d),Class I bridge/height cap,1180,+156.5%,$725k high-wide rail + $145k Schnabel transfer; physically blocks >380t/wide cargo LNG_Arb,US Gulf -> NE Asia LNG (Panama vs Cape),174k m3 Neopanamax LNGC,27d vs 39d (+12d),51.2m Neo lock beam,1590,Auction ceiling,"At $95k/day hire+boil-off (+$1.14M), LNGCs abandon Panama once auctions top $1.59M"