category,corridor_or_scenario,max_draft_m,air_draft_m,vessel_class_fit,cost_impact,strategic_constraint Waterway,Great Belt (Storebaelt / Route T),15.4 m (Baltimax),65.0 m (East Bridge),"Aframax/Suezmax tankers, 174k m3 LNGC",BELTREP mandatory,Primary deepwater Baltic exit; ~300+ shadow-fleet oil transits/yr Waterway,The Sound (Oresund / Drogden),7.7 m (shallow),Unlimited (tunnel),"Ballasted WTIV jack-ups, coastal feeders",SOUNDREP mandatory,Zero bridge height ceiling lets 115m-leg WTIVs bypass Great Belt Waterway,Kiel Canal (Nord-Ostsee-Kanal),9.5 m,40.0 m (bridges),"Feeder containers, cable barges (<32.5m beam)",Saves 250-310 nm,Lock repairs & 40m air-draft block large wind blades & LNG carriers Offshore_Wind,1.5 GW Baltic Wind Monopile Shuttle,Skagen (+280 nm),Unlimited,35 round-trips @ 2.2d extra ($145k/d),$11.17M total,$319.0k/trip when oversized monopiles cannot use Kiel Canal Offshore_Wind,15 MW WTIV Transit: Drogden vs Leg-Cut,7.5m light ballast,115m jack-up legs,4d tide wait vs 14d leg-cut yard,$1.12M vs $8.42M,Pre-engineering <7.5m ballast draft saves $7.30M per mobilization Subsea_Risk,650 MW HVDC Interconnector Anchor-Drag,Shallow 30-70m seabed,N/A,Shadow-fleet anchor-drag (EstLink 2 class),EUR 115.20M,EUR 45.00M cable ship repair + EUR 70.20M 180d power spread