Category,Portfolio_Or_Chokepoint,Upfront_MUSD_Or_Prob_Pct,Mean_Loss_MUSD_Or_Median_Days,VaR95_MUSD_Or_P95_Days,VaR99_MUSD_Or_Freight_Spike_MUSD,CVaR95_MUSD_Or_DualBasin_Pct,Total_Expected_Cost_MUSD,Risk_Adjusted_Cost_MUSD,Notes Portfolio_MonteCarlo_10k,Portfolio A: Lean Single-Source (10d Buffer),0.00,1.57,5.06,8.34,7.14,1.57,2.64,"10,000 seeded iterations; $380M Solar+BESS+Substation EPC; $115k/day critical-path LD" Portfolio_MonteCarlo_10k,Portfolio B: Bonded Regional Buffer Only (32d),0.84,0.83,2.66,5.81,4.66,1.67,2.37,"10,000 seeded iterations; $380M Solar+BESS+Substation EPC; $115k/day critical-path LD" Portfolio_MonteCarlo_10k,Portfolio C: Dual-Basin + Buffer + WR Collar (Optimal),2.15,0.19,0.58,0.85,0.73,2.34,2.45,"10,000 seeded iterations; $380M Solar+BESS+Substation EPC; $115k/day critical-path LD" Portfolio_MonteCarlo_10k,Portfolio D: Full Domestic Reshoring (No Tax Credit),18.50,0.04,0.11,0.17,0.14,18.54,18.56,"10,000 seeded iterations; $380M Solar+BESS+Substation EPC; $115k/day critical-path LD" Chokepoint_Hazard_Input,Bab el-Mandeb / Suez Red Sea Rerouting,42.0,15.6,27.8,0.68,40.0,0,0,"Stochastic hazard input: annual prob %, log-normal median/P95 delay days, freight/WR shock $M, dual-basin exposure %" Chokepoint_Hazard_Input,Panama Canal Drought / Slot Cap,22.0,12.8,24.7,0.49,35.0,0,0,"Stochastic hazard input: annual prob %, log-normal median/P95 delay days, freight/WR shock $M, dual-basin exposure %" Chokepoint_Hazard_Input,South China Sea / Malacca Escalation,14.0,19.1,42.1,0.84,45.0,0,0,"Stochastic hazard input: annual prob %, log-normal median/P95 delay days, freight/WR shock $M, dual-basin exposure %" Chokepoint_Hazard_Input,Strait of Hormuz / Gulf War-Risk Spike,12.0,14.2,33.3,0.92,30.0,0,0,"Stochastic hazard input: annual prob %, log-normal median/P95 delay days, freight/WR shock $M, dual-basin exposure %" Chokepoint_Hazard_Input,Taiwan Strait Quarantine / Tail Shock,4.0,38.5,80.7,2.40,35.0,0,0,"Stochastic hazard input: annual prob %, log-normal median/P95 delay days, freight/WR shock $M, dual-basin exposure %"