Segment,Route_Scenario,Distance_Nm,Avg_Speed_Knots,Transit_Days,Navigable_Days_Per_Year,OneWay_Voyage_Cost_USD,Unit_Delivered_Cost,Unit_Metric,Operational_Notes Container_Shanghai_Rotterdam,"Suez Canal Standard String (18,000-TEU ULCS)",10550,17.5,25.1,365,4391810,454,USD_per_FEU,Year-round benchmark; high slot utilization via intermediate Asia-Med hub calls Container_Shanghai_Rotterdam,"Cape of Good Hope Bypass (18,000-TEU ULCS)",13850,17.2,33.6,365,4790664,541,USD_per_FEU,Year-round Red Sea avoidance; +8.4 days vs Suez but zero canal tolls and full ULCS scale Container_Shanghai_Rotterdam,"NSR Summer Open Window (4,200-TEU Ice-1A, Aug-Oct)",7420,14.5,21.3,105,2133416,1276,USD_per_FEU,"30% shorter than Suez but capped at 4,200 TEU (Sannikov draft 13m), MGO fuel mandate, 105-day window" Container_Shanghai_Rotterdam,"NSR Shoulder / Ice-Escort (4,200-TEU Arc4, Jun/Nov)",7650,10.2,31.3,55,3857336,2388,USD_per_FEU,Icebreaker convoy slows transit to 31.3 days; per-FEU unit cost jumps 2.6x above Suez Arc7_LNG_Yamal_China,Arc7 LNG Sabetta-to-China via NSR Eastbound (Summer),5650,15.0,15.7,135,3652240,1.87,USD_per_MMBtu_RoundTrip,Optimal July-Nov eastbound LNG shuttle; 15.7 days one-way; $0.99/MMBtu one-way ship cost Arc7_LNG_Yamal_China,Arc7 LNG Sabetta-to-China via NSR Eastbound (Winter Convoy),5900,8.8,27.9,230,7627160,3.92,USD_per_MMBtu_RoundTrip,Severe ice drag cuts speed to 8.8 kt (27.9d); high escort & fuel burn; often diverted to Murmansk STS Arc7_LNG_Yamal_China,Arc7 LNG Sabetta-to-China via Westbound Cape (Winter Divert),16400,17.8,38.4,365,8328120,4.27,USD_per_MMBtu_RoundTrip,Avoids East Siberian Sea pack ice; 38.4 days one-way ties up scarce sanctioned Arc7 hulls