Category,Tier_Or_Blindspot,Annual_Cost_USD_Or_Mechanism,Contested_Reliability_Pct,Spoof_Detection_Pct,Crisis_ETA_Error_Days,Expected_Standby_Loss_USD,Total_Annual_TCO_USD,Net_Savings_Vs_Tier1_USD,Technical_Notes Visibility_Stack_TCO,Tier 1: Basic Terrestrial + Public AIS Feed,2000,48.0,10.0,9.5,520000,522000,0,None (Vessel position only; zero container/lot status) Visibility_Stack_TCO,Tier 2: Commercial Satellite-AIS (S-AIS) + Behavioral AI,28000,72.0,68.0,5.2,265000,293000,229000,"Draft changes only (infers bulk load, blind to rolled boxes)" Visibility_Stack_TCO,Tier 3: S-AIS + Carrier API/EDI + Customs Bills of Lading,72000,87.0,76.0,2.4,112000,184000,338000,High for containers/equipment (tracks rolled boxes & transshipment) Visibility_Stack_TCO,Tier 4: Full Multi-Sensor Fusion (S-AIS + SAR + RF Geolocation + B/L),185000,96.5,95.0,1.1,44000,229000,293000,Full hull + cargo + all-weather dark/STS verification (ICEYE/HawkEye 360) AIS_Technical_Blindspot,VHF SOTDMA Packet Collision (Singapore / Malacca S-AIS),4500 slots/min (Ch A+B),42%,0,0,0,0,0,"S-AIS detection drops when >1,200 ships crowd one 2,200 nm LEO footprint" AIS_Technical_Blindspot,GNSS Jamming & Spoofing (Black Sea / Red Sea / Baltic / Hormuz),30% global EW in Black Sea,35%,0,0,0,0,0,"Spoofed coordinates jump >60 kt or onto airports, breaking automated ETAs" AIS_Technical_Blindspot,Manual Draft & Destination Field Drift,Human-entered static msg,61%,0,0,0,0,0,"Officers omit draft updates after partial discharge, masking cargo volume" AIS_Technical_Blindspot,MMSI Laundering & Zombie Vessel Cloning,Unencrypted VHF broadcast,18%,0,0,0,0,0,Shadow hulls clone scrapped vessel MMSIs to pass basic database joins AIS_Technical_Blindspot,Zero Container / Breakbulk Manifest Visibility,Hull-level only,0%,0,0,0,0,0,AIS cannot detect if a transformer or BESS box was rolled at transshipment