record_type,company_or_category,ticker_or_reference,segment,accounting_standard,reporting_period,currency,revenue_or_base_capex_m,inventory_or_qual_cost_m,trade_payables_or_split_delta_m,top_supplier_share_or_split_alpha_pct,top_two_share_or_price_penalty_pct,vendor_receivables_or_upfront_premium_m,purchase_obligations_or_single_delay_days,loss_provision_or_net_days_saved,loss_share_or_breakeven_p_star_pct,sourcing_archetype_or_decision,key_finding_or_components,primary_source_citation,source_url OEM_EMPIRICAL,"SolarEdge Technologies, Inc.",SEDG,"Solar Inverters, Power Optimizers & BESS",US GAAP,"Q2 2026 (ended June 30, 2026) & FY2025 (ended Dec 31, 2025)",USD,1184.1,581.53,460.14,51.3,50.7,106.78,339.98,24.32,7.15,Concentrated Dual-CM Assembly (Jabil & Flex) + Sole-Source Proprietary ASICs,"1 CM accounted for 51.3% of trade payables ($236.05m of $460.14m) at June 30, 2026; 2 CMs accounted for 50.7% ($137.90m of $271.98m) at Dec 31, 2025. Carries $106.78m in vendor non-trade receivables from selling sole-source components to CMs and $24.32m loss provision on $339.98m non-cancellable CM/component purchase obligations, plus $54.0m Ampt supply lawsuit and EUR 100k/day Stellantis delay penalty claim (rejected on appeal May 6, 2026).","SolarEdge Q2 2026 Form 10-Q (Notes 1e, 3, 4, 14b, 14c) & FY2025 Form 10-K (Item 1 & Item 1A)",https://www.sec.gov/Archives/edgar/data/1419612/000117891326003854/zk2635807.htm OEM_EMPIRICAL,"Enphase Energy, Inc.",ENPH,Microinverters & LFP Battery Storage (IQ Battery),US GAAP,"Q3 2026 (9M ended Sept 30, 2026) & FY2025 (ended Dec 31, 2025)",USD,868.08,243.71,100.32,,100.0,,262.4,59.48,22.67,"Multi-CM Assembly (Flex, Salcomp, Sunwoda, Arlington TX) + Single-Country Dual-Source LFP Cells","LFP battery cells are 100% supplied by strictly two vendors both located in China (common-mode geographic correlation rho -> 1.0 for tariffs/export controls), while custom ASICs are sole/limited-source. Carries $262.40m in inventory purchase commitments and $59.48m in accrued liabilities due to supply/service agreements at Sept 30, 2026; took over Arlington TX plant from Salcomp in Nov 2025.","Enphase Q3 2026 Form 10-Q (Notes 5, 6, 12 & Item 1A p. 36) & FY2025 Form 10-K (p. 14)",https://www.sec.gov/Archives/edgar/data/1463101/000146310126000102/enph-20260930.htm OEM_EMPIRICAL,Nextpower Inc. (formerly Nextracker Inc.),NXT,"Utility-Scale Solar Trackers, Foundations & eBOS",US GAAP,"FY2026 (ended March 31, 2026)",USD,3559.39,228.56,445.12,,,,,,,CapEx-Light Multi-Factory Distributed Network (100+ Partner Plants in 19 Countries),"Operates 100+ partner manufacturing facilities across 19 countries on 5 continents (30+ U.S. factories >40 GW/yr; 80 GW/yr global capacity; ~1,500 MW/week) with only $78.36m net PP&E supporting $3,559.39m revenue (38.0 GW delivered) and 32.6% GAAP gross margin ($1,160.10m). Formed Nextpower Arabia JV in Saudi Arabia (Jan 2026) for MENA localization.","Nextpower Inc. FY2026 Form 10-K (Item 1 & Item 7, ended March 31, 2026)",https://www.sec.gov/Archives/edgar/data/1852131/000185213126000017/nxt-20260331.htm OEM_EMPIRICAL,"Fluence Energy, Inc.",FLNC,Utility-Scale Battery Energy Storage Systems (BESS),US GAAP,"FY2025 (ended Sept 30, 2025) & Q3 FY2026 (ended June 30, 2026)",USD,2262.83,455.02,318.45,,,126.78,5300.0,,,Dual U.S. Contract Manufacturing (Utah + Arizona Ramp-Up) + Multi-Region Cell Sourcing,"Expanded from single U.S. contract manufacturer in Salt Lake City, Utah (Sept 2022) to second U.S. contract manufacturer in Arizona (2025), but explicitly disclosed 'recent delays in Arizona' ramp-up impacting customer deliveries and exposing Fluence to liquidated damages (LDs). Advances to suppliers rose from $126.78m (FY2025) to $226.39m (Q3 FY2026) against $5.3bn backlog.","Fluence Energy FY2025 Form 10-K (p. 2, Item 1 & Item 1A) & Q3 FY2026 Form 8-K (Aug 5, 2026)",https://www.sec.gov/Archives/edgar/data/1868941/000186894125000081/flnc-20250930.htm OEM_EMPIRICAL,"Tigo Energy, Inc.",TYGO,Module-Level Power Electronics (MLPE) & GO ESS,US GAAP,"FY2025 (ended Dec 31, 2025)",USD,103.54,31.29,29.2,,,,,,,Dual-CM Model in Thailand/Vietnam/China with 180-Day Exit & Re-Qualification Friction,"Relies mainly on 2 contract manufacturers across Thailand, Vietnam, and China; concluded one CM agreement in April 2026 while onboarding a replacement Thailand CM. Master supply agreements require 180 days termination notice and 6 months component discontinuation notice; sole-source CPUs, Wi-Fi chips, FPGAs, and potting compounds require full product re-certification if substituted.","Tigo Energy FY2025 Form 10-K (Item 1 & Item 1A, filed March 2026)",https://www.sec.gov/Archives/edgar/data/1855447/000119312526115952/tygo-20251231.htm OEM_EMPIRICAL,GE Vernova Inc.,GEV,"Heavy Gas Turbines, Power Transformers & HVDC Grid Equipment",US GAAP,"Q3 2026 (ended Sept 30, 2026) & FY2025 (ended Dec 31, 2025)",USD,38068.0,9944.0,20336.0,,,,42200.0,,,Vertical M&A Integration ($5.275bn Prolec GE + $9.0bn Trench Group) Over External Dual Sourcing,"Facing a $42.2bn Electrification backlog (2.8-2.9x 2026 segment revenue guidance of $14.5-$15.0bn) and multi-year IEC/KEMA qualification barriers on third-party HVDC bushings and large power transformers, GE Vernova bypassed external dual-sourcing to acquire the remaining 50% of Prolec GE for $5.275bn (~25% EBITDA margin, closed Feb 2, 2026) and Trench Group for $9.0bn (~33% EBITDA margin on $1.4bn 2026E revenue, announced Oct 28, 2026).","GE Vernova Q3 2026 Form 10-Q (Oct 28, 2026), Prolec GE Release (Feb 2, 2026) & Trench Group M&A Analysis (Oct 28, 2026)",https://www.sec.gov/Archives/edgar/data/1996810/000199681026000163/gev-20260930.htm OEM_EMPIRICAL,Vestas Wind Systems A/S vs. Siemens Energy AG,VWS.CO / ENR.DE,"Utility-Scale Wind Turbines, Blades, Gearboxes & HVDC",IFRS,"FY2025 (Vestas ended Dec 31, 2025; Siemens Energy ended Sept 30, 2025)",EUR,18816.0,4752.0,5120.0,,,,,600.0,3.2,Strategic Partner Consolidation (Vestas) vs. Multi-Supplier Quality/Warranty Blowout (Siemens Gamesa),"Vestas consolidated strategic suppliers (ZF, Maersk, Cadeler) and modularized platforms to cut warranty expense from EUR 737m (4.3% of revenue in FY24) to EUR 600m (3.2% in FY25; EUR 1,929m warranty provision). Conversely, Siemens Energy carried EUR 2,474m in Siemens Gamesa warranty provisions plus EUR 984m in quality-related onerous contract/risk provisions (EUR 3,458m combined) after 4.X/5.X rotor blade and bearing supplier quality failures.",Vestas Annual Report 2025 (Note 2.5 p. 97) & Siemens Energy Annual Report 2025 (Note 17 p. 206),https://www.vestas.com/content/dam/vestas-com/global/en/investor/reports-and-presentations/financial/2025/fy-2025/Vestas%20Annual%20Report%202025.pdf OEM_EMPIRICAL,Elsewedy Electric S.A.E. & Orascom Construction PLC,SWDY.CA / ORAS,"MENA & Africa Turnkey Power, Grid Transformers, Cables & EPC",EAS / IFRS,"Q1 2026 (ended March 31, 2026) & FY2025 (ended Dec 31, 2025)",EGP / USD,65412.0,56522.1,45796.6,,,34174.4,,767.9,,Regional Dual-Sourcing (Local Transformer/Cable Manufacturing + Approved International OEM AVL),"Elsewedy Electric carries EGP 34,174.4m in advances to suppliers and EGP 767.9m in provisions for warranty, lawsuits, and contractual risks (Note 34-1, Q1 2026) across multi-year MENA/Africa EPC contracts (Tanzania JNHPP, Burkina Faso Sonabel). Orascom Construction ($4,987.2m FY2025 revenue, $328.9m advances to suppliers) pairs Tier-1 turbine/HVDC OEMs with qualified regional balance-of-plant fabricators to mitigate customs/LC delays.",Elsewedy Electric Q1 2026 Consolidated FS (Note 13 & Note 34-1) & Orascom Construction FY2025 Consolidated FS (Note 11 & Note 23),https://irfiles.technologyverse.com/swdy2/EE-Consolidation-FS-31-3-26-EN.pdf TCS_MODEL_ARCHETYPE,400 kV Generator Step-Up (GSU) Power Transformers (2 x 350 MVA),300 MWac / 600 MW MENA Grid-Connected Solar or Gas Peaker Substation,Total Cost of Sourcing (TCS) Benchmark Model,Analytical TCO / Expected Shortfall,"Cutoff October 28, 2026 (Published Nov 1, 2026)",USD,16.0,0.68,0.56,50.0,3.5,1.24,180,145,5.31,Mandatory Dual Sourcing (50/50 split across 2 pre-qualified OEMs or 1 Tier-1 + 1 Regional OEM),"IEC 60076-5 short-circuit type test witnessing (KEMA/CESI), factory audit, harmonic/thermal finite-element review, and dual bushing interface engineering","Segeta COD Delay Cost Study (June 2026: $169,200/day on 300 MWac solar) & GE Vernova Prolec/Trench Filing (Oct 2026)",https://energy-solutions.co/supply-chain/procurement-finance/single-vs-dual-sourcing-cost TCS_MODEL_ARCHETYPE,"Utility-Scale LFP BESS Modules & Enclosures (1,200 MWh / 300 MW, 4-Hour)","300 MW / 1,200 MWh Standalone or Co-Located Storage Plant",Total Cost of Sourcing (TCS) Benchmark Model,Analytical TCO / Expected Shortfall,"Cutoff October 28, 2026 (Published Nov 1, 2026)",USD,138.0,0.95,0.911,70.0,2.2,1.861,120,90,18.92,Geographic-Decoupled Dual Sourcing Only (70/30 split across China + Non-China/US/KR cell & CM lines; same-country dual sourcing fails if rho > 0.60),"UL 9540A large-scale fire propagation testing, BMS-to-EMS cyber/protocol integration, cell cycler validation, and independent engineer bankability sign-off",Enphase Q3 2026 10-Q (p. 36: 2 Chinese LFP cell suppliers) & Fluence FY2025 10-K (p. 2: Arizona CM ramp-up delay),https://energy-solutions.co/supply-chain/procurement-finance/single-vs-dual-sourcing-cost TCS_MODEL_ARCHETYPE,"Solar Tracker Torque Tubes, Piers & Fasteners (400 MWdc Utility Solar)",400 MWdc Desert PV Plant (Egypt / Saudi Arabia / U.S. Southwest),Total Cost of Sourcing (TCS) Benchmark Model,Analytical TCO / Expected Shortfall,"Cutoff October 28, 2026 (Published Nov 1, 2026)",USD,44.0,0.18,0.131,65.0,0.85,0.311,60,50,3.86,Multi-Sourcing Standard (65/35 or 60/25/15 split across regional steel fabricators using shared OEM tooling),"CPP/RWDI wind-tunnel aeroelastic validation, steel mill yield/galvanization audit (ISO 1461), and progressive punch/roll-forming die tooling",Nextpower FY2026 10-K (100+ partner plants across 19 countries; $78.36m PP&E on $3.56bn revenue),https://energy-solutions.co/supply-chain/procurement-finance/single-vs-dual-sourcing-cost TCS_MODEL_ARCHETYPE,Custom Mixed-Signal ASICs & Automated Inverter/Optimizer CM Assembly Lines,Annual OEM Production Program (2.5 GW Inverter / MLPE Annual Run-Rate),Total Cost of Sourcing (TCS) Benchmark Model,Analytical TCO / Expected Shortfall,"Cutoff October 28, 2026 (Published Nov 1, 2026)",USD,85.0,4.2,1.046,70.0,4.1,5.246,95,75,66.8,Single-Source Foundry + Strategic Die Bank (90-120 Days Buffer Inventory) for ASICs; Dual-CM for Final Assembly Only Above $150m/yr Volume,"Second foundry mask set & tape-out ($2.4m), duplicated automated SMT/potting & end-of-line test rigs ($1.3m), and UL 1741 / IEC 62109 re-certification ($0.5m)",SolarEdge Q2 2026 10-Q (Note 4: $106.78m vendor non-trade receivables; Note 14b: $24.32m loss on $339.98m CM commitments) & Tigo FY2025 10-K,https://energy-solutions.co/supply-chain/procurement-finance/single-vs-dual-sourcing-cost