aircraft_or_mode,max_payload_tonnes,door_and_loading_geometry,indicative_asia_us_eu_cost_usd,best_fit_data_center_hardware,primary_2026_constraint Scheduled Air Cargo (Belly / Main),5 to 25 (lot),160 cm belly cap; 300 cm main-deck pallet,$3.50 to $7.77 / kg (TAC / BAI),"Optical transceivers, spare breakers, relays, small PDUs",Belly height excludes upright racks; Q4 e-commerce rate spikes Boeing 777 Freighter (777F),100 to 112,Main-deck side door (~3.0 m height),"$350,000 to $550,000+ one-way","Upright AI GPU server racks (GB200), CDUs, medium UPS",Side-door turn radius limits extra-long continuous switchgear Boeing 747-8 Freighter (747-8F),130 to 137,Unique nose-loading door + large side door,"$450,000 to $700,000+ one-way","Long MV switchgear lineups, busduct skids, dense rack lots",Production ended permanently; finite global fleet & ground loaders Antonov AN-124 Outsize Freighter,120 to 150,Nose/rear ramps + onboard 30 t overhead cranes,"$900,000 to $1,600,000+ one-way","Emergency dry/liquid transformers, massive PDU/generator skids",Severely reduced civilian fleet post-2022; multi-week queues Ocean Container (Cape/Pacific),24 to 28 / FEU,Standard 40 ft high-cube container,"$3,500 to $6,500 / FEU","Baseline steel, cable trays, non-critical racks & enclosures",30-48 day door-to-door transit + port/UFLPA detention risk