category,pathway_or_tier,governing_standard,timeline_months,upfront_or_unit_cost_usd,annual_or_multiplier,liability_or_audit_gate,notes Pathway,ASME Section III N-Stamp (N/NPT/NS),ASME BPVC Sec III NCA / 10 CFR 50 App B,12-18,650000,550000/yr fixed floor,3-yr ASME survey + continuous AIA/ANI,"Mandatory for safety-class pressure boundaries, vessels, Class 1/2/3 valves" Pathway,NQA-1 / NUPIC Approved Supplier (ASL),ASME NQA-1 / 10 CFR 50 App B,9-18,380000,320000/yr fixed floor,Triennial NUPIC/NIAC joint utility audit,"Covers basic safety components, I&C, engineering services, and nuclear software" Pathway,Commercial Grade Dedication (CGD),EPRI 3002002982 / NRC RG 1.164,3-9,95000,Per item family,Dedicating entity assumes 10 CFR Part 21,Qualifies ISO 9001 commercial hardware via Methods 1-4 (test/survey/source/record) Pathway,Augmented Quality / BOP Commercial,ISO 9001 / Industrial Codes,1-3,25000,Standard industrial,Routine commercial vendor surveillance,Non-safety turbine island and balance-of-plant hardware; key SMR cost lever Overhead_Burden,Small Specialty Machine Shop ($2.0M/yr),ASME Sec III + NQA-1,Ongoing,550000,27.5% of nuclear rev,High exit/non-renewal risk,Fixed QA floor forces small shops to drop stamps during order droughts Overhead_Burden,Mid-Tier Component Vendor ($5.0M/yr),ASME Sec III + NQA-1,Ongoing,550000,11.0% of nuclear rev,Margin compressed without backlog,Requires multi-year utility framework agreements to justify triennial renewal Overhead_Burden,Established Nuclear Tier-2 ($15.0M/yr),ASME Sec III + NQA-1,Ongoing,550000,3.7% of nuclear rev,Economically sustainable,Can absorb NUPIC audits and ANI hold points across diversified fleet orders Overhead_Burden,Major Nuclear OEM ($50.0M/yr),ASME Sec III + NQA-1,Ongoing,550000,1.1% of nuclear rev,Scale advantage,Fixed QA infrastructure becomes negligible relative to engineering backlog Valve_Multiplier,6-in Stainless Valve (ISO 9001),Commercial Industrial,2-3,8500,1.00x baseline,Standard commercial warranty,Off-the-shelf industrial valve with mill test report only Valve_Multiplier,6-in Stainless Valve (EPRI CGD Lot=10),EPRI 3002002982 / RG 1.164,5-9,24000,2.82x commercial,10 CFR Part 21 by dedicator,Base $8.5k + $9.5k amortized CGD + $0.85k destructive test + $5.15k traceability Valve_Multiplier,6-in Stainless Valve (ASME III Class 1),ASME Section III N-Stamp,18-30,68000,8.00x commercial,10 CFR Part 21 by N-Stamp OEM,"Full heat-traceable melt, 100% RT/UT NDE, seismic qual, ANI hold-points"