category,platform_or_item,vendor_or_basis,architecture_type,nrc_approval_status,lead_time_months,cost_usd_millions,share_or_metric,notes Platform,TELEPERM XS,Framatome,Microprocessor deterministic safety PLC,NRC SER Approved (Oconee precedent),48-72,130-165,Global fleet leader,Hardwired-logic philosophy; installed across >80 reactors globally Platform,Common Q,Westinghouse (ABB AC160),Microprocessor safety PLC,NRC SER Approved (topical report),48-72,125-160,PWR/BWR RPS & ESFAS,Widely deployed on Westinghouse PWR upgrades and AP1000 Platform,Tricon TMR v10/v11,Schneider Electric,Triple Modular Redundant PLC,NRC SER Approved,36-60,95-140,High fault tolerance,Proven in safety-related upgrades including Diablo Canyon Platform,RadICS,Radiy / Curtiss-Wright,FPGA hardware-logic safety platform,NRC SER Approved (2019),36-54,85-130,Mitigates SW CCF,Hardware description logic reduces microprocessor software CCF scrutiny Platform,Spinline / Numac,Rolls-Royce / GE Hitachi,Safety PLC / BWR neutron monitoring,Regional / BWR qualified,36-60,70-120,Fleet-specific niche,Strong footprint in European EDF fleet and legacy BWR neutron flux channels CapEx_Split,Safety Hardware BOM,Cabinets/FPGA/PLC/Fiber,Physical equipment,NQA-1 / CGD,18-24,24.00,16.6%,Only 16.6% of total installed 2-unit digital I&C project cost CapEx_Split,Licensing & V&V Engineering,NRC LAR / ISG-06 / D3,Regulatory & software V&V,10 CFR 50.90 / CCF,24-48,58.00,40.0%,Dominant cost and schedule driver in Western nuclear upgrades CapEx_Split,Cybersecurity & FAT/SAT,10 CFR 73.54 / RG 5.71,Deterministic data diodes,NRC Cyber Rule,12-24,19.50,13.4%,"Hardware isolation, CDA inventory, and factory acceptance testing" CapEx_Split,Outage Cutover & HFE,NUREG-0711 / Simulators,Installation & operator training,Outage window,12-24,43.50,30.0%,Multi-outage staged installation plus full-scope control room simulator Lifecycle_20yr,Analog Status Quo (2 Units),Legacy 1970s Relays/PCBs,Reverse-eng + CGD spares,Grandfathered analog,N/A,141.48,30 forced outage days,OM $90.00M + $51.48M forced derates; high stranded-part cliff risk Lifecycle_20yr,Digital Modernization (2 Units),Full RPS/ESFAS Cutover,Qualified safety digital,10 CFR 50.90 + 73.54,60-84,177.58,21.0d breakeven vs cliff,CapEx $145M + OM $42M + $8.58M outage - $18M surveillance credit