category,asset_or_scenario,operator_or_design,max_capacity_tonnes,load_moment_tm,timeline_months,cost_usd_millions,key_metric_or_constraint,notes Heavy_Crane,SGC-250 (Big Carl),Sarens,5000,250000,48-72,96.80,48.5m ring / 250-280 trucks,"Deployed at Hinkley Point C on 6 km of site rail tracks; hoists 300-1,600t liner rings & RPVs" Heavy_Crane,PTC 200-DS / 210-DS,Mammoet,3200,200000,36-60,82.00,Containerized modular ring,Global competitor in ultra-heavy nuclear & petrochemical module lifts; competes with offshore wind Heavy_Crane,LR 13000 Crawler,Liebherr (Various EPCs),3000,94400,24-48,58.00,High mobility / no full ring,Largest conventional crawler crane; used for AP1000 containment rings and heavy steam generators Heavy_Crane,"Standard Heavy Crawler (1,000-1,350t)",Liebherr LR 11000 / Demag CC 6800,1250,18000,24-30,22.00,Wide global rental fleet,Sufficient for SMRs keeping DPSC modules and RPVs under 250-350t lifting envelope Module_System,AP1000 CA01 & CA20 SC Modules,Westinghouse / Vogtle 3&4,900,N/A,24-36,On-site MAB,Tie-bar congestion / fit-up,Pioneered open-top nuclear SC modularization; FOAK tolerance & dowel interferences caused rework Module_System,BWRX-300 DPSC Steel Bricks,GE Hitachi (AISC N690),350,N/A,12-18,Factory shipped,Internal diaphragm ribs + SCC,Factory-welded steel composite wall blocks designed for rail/barge transport and fast concrete flow Economics,GW Ring Crane Package (48 mos),"Twin-Unit 2,200-3,200 MWe",5000,250000,48,96.80,Mob $18M + Rail $14M + $64.8M,"All-in heavy-lift mobilization, civil track prep, and 48-month charter @ $1.35M/mo" Economics,12-Month Schedule Acceleration Value,$12B GW Build @ 7% IDC,N/A,N/A,12,840.00,8.68x ROI on ring crane,Saving 1 year of Interest During Construction pays for the ring crane nearly 9 times over Economics,18-Month Module Rework Penalty,Vogtle-style tolerance slip,N/A,N/A,18,1260.00,+$24.30M standby,Dimensional/NDE defects strand the crane on site while IDC bleeds $70M/month Economics,SMR Standardized Crawler Package,300 MWe DPSC SMR (30 mos),1250,18000,30,22.00,-77.3% vs ring crane,Mob $4.5M + Pad $2.5M + $15.0M charter; eliminates ring-crane oligopoly booking bottleneck