record_type,material_or_scenario,thermal_cross_section_barns_or_mwh,melting_pt_c_or_price,swelling_physics_or_daily_loss,service_life_yrs_or_days,est_material_cost_usd_kg_or_loss,lead_time_mos_or_capex,primary_reactor_use_or_ratio,supply_risk_notes Absorber_Matrix,"Natural Boron Carbide (B4C, 19.6% B-10)","755 (3,837 on B-10)",2450,High (He-4 gas swelling),6-8,120,14-22,"BWR blades, PWR backup rods",Moderate (nuclear-grade sintering) Absorber_Matrix,"Enriched Boron Carbide (B4C, 70-90% B-10)","2,700 - 3,450 eff.",2450,High (mitigated by plenum),10-14,6500,24-36,"Compact SMRs, high-burnup LWR & EBA",Extreme (3M Ceradyne OK vs. Russia/China) Absorber_Matrix,Silver-Indium-Cadmium (80Ag-15In-5Cd),~200 (broad epithermal),800,Zero He swelling; clad wear,10-15,1150,18-28,Standard PWR RCCAs (53-61/core),High (80% Ag/In + precision spider fab) Absorber_Matrix,Hafnium Metal / Hybrid Tips (Hf),104 (multi-isotope chain),2233,Zero He swelling; SCC resistant,15-20,4800,24-38,"BWR CR 82M tips, PWR/naval/SMR",Severe (Zr separation by-product + jet engines) Outage_Economics,"1,100 MWe PWR 10-Day Refueling Extension vs. Full 57-RCCA Replacement",26400 MWh/day,$65/MWh,1.72M/day,10 days,17.16M lost,6.00M set,2.86x asymmetry,ESI modeled outage-slip cost vs. proactive control-rod procurement