{
  "publisher": "Energy Solutions Intelligence",
  "sourceArticle": "https://energy-solutions.co/supply-chain/mena-africa/morocco-battery-ecosystem",
  "generatedFrom": "Published article tables",
  "dateModified": "2026-11-15",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "tables": [
    {
      "tableNumber": 1,
      "title": "Table 1",
      "columns": [
        "Material / Chemical Input",
        "Battery Grade & HS Code",
        "Domestic Producer / Source",
        "Refined Domestic Supply (t/yr)",
        "Full Pipeline Demand (t/yr)",
        "Self-Sufficiency Ratio (%)",
        "Net Balance (t/yr)",
        "Bottleneck & Value-Chain Diagnosis"
      ],
      "rows": [
        {
          "Material / Chemical Input": "Purified Phosphoric Acid (PPA)",
          "Battery Grade & HS Code": "H3PO4 (≥99.99%) | HS 280920",
          "Domestic Producer / Source": "OCP Group (Jorf Lasfar & Safi)",
          "Refined Domestic Supply (t/yr)": "450,000",
          "Full Pipeline Demand (t/yr)": "118,000",
          "Self-Sufficiency Ratio (%)": "381.4%",
          "Net Balance (t/yr)": "+332,000",
          "Bottleneck & Value-Chain Diagnosis": "Structural Global Surplus: Covers 3.8x the 190 kt/yr LFP CAM pipeline (COBCO, BTR, LG/Huayou, NGB)."
        },
        {
          "Material / Chemical Input": "Battery-Grade Cobalt (Contained Co)",
          "Battery Grade & HS Code": "CoSO4.7H2O / Cathode | HS 283329 / 810520",
          "Domestic Producer / Source": "Managem (Bou Azzer + Guemassa Recycling)",
          "Refined Domestic Supply (t/yr)": "3,200",
          "Full Pipeline Demand (t/yr)": "7,200",
          "Self-Sufficiency Ratio (%)": "44.4%",
          "Net Balance (t/yr)": "-4,000",
          "Bottleneck & Value-Chain Diagnosis": "Partial Coverage / Pre-Committed: Up to 5,000 t/yr CoSO4 contracted to Renault; COBCO imports supplemental Co."
        },
        {
          "Material / Chemical Input": "Class-1 Battery Nickel (Contained Ni)",
          "Battery Grade & HS Code": "NiSO4.6H2O / MHP | HS 283324 / 750120",
          "Domestic Producer / Source": "Zero Primary Mine; Black Mass Only",
          "Refined Domestic Supply (t/yr)": "2,500",
          "Full Pipeline Demand (t/yr)": "57,600",
          "Self-Sufficiency Ratio (%)": "4.3%",
          "Net Balance (t/yr)": "-55,100",
          "Bottleneck & Value-Chain Diagnosis": "Critical Import Dependency: 95.7% imported as MHP/matte/sulfate via CNGR's Indonesian & global network."
        },
        {
          "Material / Chemical Input": "Lithium Carbonate Equivalent (LCE)",
          "Battery Grade & HS Code": "Li2CO3 / LiOH.H2O | HS 283691 / 282520",
          "Domestic Producer / Source": "Zero Active Mine/Refinery; Recycling Only",
          "Refined Domestic Supply (t/yr)": "800",
          "Full Pipeline Demand (t/yr)": "68,500",
          "Self-Sufficiency Ratio (%)": "1.2%",
          "Net Balance (t/yr)": "-67,700",
          "Bottleneck & Value-Chain Diagnosis": "Critical Import Dependency: 47.5 kt for LFP CAM + 16.5 kt for NMC + 4.5 kt for Tinci LiPF6 electrolyte."
        },
        {
          "Material / Chemical Input": "Refined Grade-A Copper (Foil Feed)",
          "Battery Grade & HS Code": "Cu Cathode (99.99%) | HS 740311 → 741011",
          "Domestic Producer / Source": "Managem Tizert/Akka (62 kt Cu in Conc.; 0 Smelter)",
          "Refined Domestic Supply (t/yr)": "0 | (62,000 mined)",
          "Full Pipeline Demand (t/yr)": "52,000",
          "Self-Sufficiency Ratio (%)": "0.0% Refined",
          "Net Balance (t/yr)": "-52,000",
          "Bottleneck & Value-Chain Diagnosis": "Smelting Gap: Morocco mines 119% of needed Cu in concentrate, but exports concentrate and imports cathode/scrap."
        },
        {
          "Material / Chemical Input": "Battery Manganese (Contained Mn)",
          "Battery Grade & HS Code": "HPMSM (MnSO4.H2O) | HS 283329",
          "Domestic Producer / Source": "Managem Imini (25 kt Mn in Ore; 0 HPMSM)",
          "Refined Domestic Supply (t/yr)": "0 | (25,000 mined)",
          "Full Pipeline Demand (t/yr)": "7,200",
          "Self-Sufficiency Ratio (%)": "0.0% HPMSM",
          "Net Balance (t/yr)": "-7,200",
          "Bottleneck & Value-Chain Diagnosis": "Chemical Refining Gap: Mined Mn ore exceeds demand by 3.5x, but lacks domestic HPMSM crystallization unit."
        },
        {
          "Material / Chemical Input": "Spherical / Synthetic Graphite",
          "Battery Grade & HS Code": "Coated Anode Graphite | HS 250410 / 380110",
          "Domestic Producer / Source": "None (Zero Domestic Graphite Mine/Furnace)",
          "Refined Domestic Supply (t/yr)": "0",
          "Full Pipeline Demand (t/yr)": "115,000",
          "Self-Sufficiency Ratio (%)": "0.0%",
          "Net Balance (t/yr)": "-115,000",
          "Bottleneck & Value-Chain Diagnosis": "100% Import Dependency: BTR (60 kt) & Shinzoom (45 kt) import flake/green coke for local coating/finishing."
        }
      ]
    },
    {
      "tableNumber": 2,
      "title": "Table 2",
      "columns": [
        "ID & Company / JV",
        "Industrial Hub",
        "Stage & Product (HS Code)",
        "CAPEX ($M)",
        "Phase 1 vs. Full Target Capacity",
        "Status (As of Nov 2026)",
        "Verified Offtake & Local Value Added"
      ],
      "rows": [
        {
          "ID & Company / JV": "MAR-BAT-01 | COBCO (Al Mada & CNGR)",
          "Industrial Hub": "Jorf Lasfar (El Jadida)",
          "Stage & Product (HS Code)": "Midstream NMC pCAM, LFP CAM & Recycling | HS 285390 / 284290",
          "CAPEX ($M)": "$2,000M",
          "Phase 1 vs. Full Target Capacity": "Phase 1: 40,000 t/yr NMC pCAM | Full: 120 kt pCAM + 60 kt LFP + 60 kt Recycling (~70 GWh)",
          "Status (As of Nov 2026)": "Operational | Commissioned Jan 2025; Inaugurated Jun 25, 2025",
          "Verified Offtake & Local Value Added": "Umicore multi-year NMC pCAM contract (signed Mar 28, 2025; deliveries early 2026). Est. Local VA: 44% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-02 | Gotion Power Morocco",
          "Industrial Hub": "Kenitra Industrial Zone",
          "Stage & Product (HS Code)": "Downstream LFP/NMC Cells, Packs & BESS | HS 850760",
          "CAPEX ($M)": "$1,300M | ($5.6B+ Master)",
          "Phase 1 vs. Full Target Capacity": "Phase 1: 20 GWh/yr (10 GWh initial sub-phase) | Full: 100 GWh/yr + CAM/AAM",
          "Status (As of Nov 2026)": "Pre-Commissioning | CDG $280M equity; AfDB Jul 2026 loan; Q4 2026 launch",
          "Verified Offtake & Local Value Added": "Targeted EU/MENA automotive OEMs & ACWA Power 500 MW wind PPA. Est. Local VA: 52% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-03 | BTR New Material Group",
          "Industrial Hub": "Tangier Tech & Kenitra",
          "Stage & Product (HS Code)": "Midstream Cathode (CAM) & Graphite Anode (AAM) | HS 284290 / 380110",
          "CAPEX ($M)": "$660M | ($300M + $360M)",
          "Phase 1 vs. Full Target Capacity": "Phase 1: 25 kt/yr CAM (Sep 2026) + 30 kt/yr AAM | Full: 50 kt/yr CAM + 60 kt/yr AAM",
          "Status (As of Nov 2026)": "Phase 1 Commissioning | Approved Mar & Sep 2024; Sept 2026 CAM milestone",
          "Verified Offtake & Local Value Added": "Export supply to European & global cell plants. 100% imported graphite feedstock. Est. Local VA: 38% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-04 | Hunan Zhongke Shinzoom",
          "Industrial Hub": "Mohammed VI Tangier Tech City",
          "Stage & Product (HS Code)": "Midstream Spherical/Synthetic Graphite Anode | HS 380110",
          "CAPEX ($M)": "$460M",
          "Phase 1 vs. Full Target Capacity": "Phase 1: 20,000 t/yr AAM | Full: 40,000–50,000 t/yr AAM (20-ha site)",
          "Status (As of Nov 2026)": "Under Construction | Announced May 2024; 2,000 direct jobs planned",
          "Verified Offtake & Local Value Added": "Merchant anode supply for European cell gigafactories. Est. Local VA: 36% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-05 | Hailiang Group Morocco",
          "Industrial Hub": "Mohammed VI Tangier Tech City",
          "Stage & Product (HS Code)": "Midstream Electrolytic Battery Copper Foil | HS 741011",
          "CAPEX ($M)": "$450M",
          "Phase 1 vs. Full Target Capacity": "Phase 1: 25,000 t/yr Cu Foil | Full: 50,000 t/yr Cu Foil + 35 kt Cu Semis",
          "Status (As of Nov 2026)": "Under Construction | 30-ha site in Tangier Tech; equipment installation",
          "Verified Offtake & Local Value Added": "Supplies Gotion Kenitra & EU cell plants. Imports refined Cu cathode/scrap. Est. Local VA: 34% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-06 | Tinci Materials Morocco",
          "Industrial Hub": "Jorf Lasfar (El Jadida)",
          "Stage & Product (HS Code)": "Midstream Electrolyte & LiPF6 Salt | HS 382499 / 282690",
          "CAPEX ($M)": "$282M",
          "Phase 1 vs. Full Target Capacity": "Full Target: 150,000 t/yr Lithium-Ion Electrolytes (~140 GWh cell eq.)",
          "Status (As of Nov 2026)": "Approved / Early Build | Approved by Investment Commission Jun 2025",
          "Verified Offtake & Local Value Added": "Synergy with OCP phosphorus/fluorine at Jorf Lasfar; supplies Gotion & southern EU. Est. Local VA: 48% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-07 | OCP Group / NGB / Mera",
          "Industrial Hub": "Jorf Lasfar & Benguerir",
          "Stage & Product (HS Code)": "Upstream PPA + LFP CAM + Utility LFP BESS | HS 280920 / 850760",
          "CAPEX ($M)": "$350M",
          "Phase 1 vs. Full Target Capacity": "Active: 450 kt PPA + 1 kt LFP Pilot + 25 MW / 125 MWh BESS | Full: 30 kt LFP (2027) + 1 GWh Packs",
          "Status (As of Nov 2026)": "Operational | 125 MWh Benguerir BESS energized Sep 16, 2026",
          "Verified Offtake & Local Value Added": "Captive OCP renewable firming (5 GW by 2027) + PPA supply to COBCO. Est. Local VA: 78% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-08 | Managem Group",
          "Industrial Hub": "Bou Azzer, Guemassa & Tizert",
          "Stage & Product (HS Code)": "Upstream Cobalt Sulfate, Cu Conc. & Mn Ore | HS 283329 / 260300",
          "CAPEX ($M)": "$420M",
          "Phase 1 vs. Full Target Capacity": "Active: 3.2 kt/yr Co + 120 kt/yr Cu Conc. (Tizert) | Full: 5,000 t/yr CoSO4",
          "Status (As of Nov 2026)": "Operational | Bou Azzer active; Tizert Copper commissioned Q4 2025",
          "Verified Offtake & Local Value Added": "Renault (5,000 t/yr CoSO4 over 7 yrs from 2025); BMW (€100M+); Glencore JV. Est. Local VA: 88% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-09 | LG Chem & Huayou (Youshan)",
          "Industrial Hub": "Jorf Lasfar / Atlantic Zone",
          "Stage & Product (HS Code)": "Midstream LFP Cathode Active Material | HS 284290",
          "CAPEX ($M)": "$400M",
          "Phase 1 vs. Full Target Capacity": "Full Target: 50,000 t/yr LFP CAM (~22 GWh cell eq.)",
          "Status (As of Nov 2026)": "FEED / Structuring | Adjusting JV equity to meet US IRA <25% PFE rule",
          "Verified Offtake & Local Value Added": "Targeted for LG Energy Solution North American & European LFP cell lines. Est. Local VA: 45% ."
        },
        {
          "ID & Company / JV": "MAR-BAT-10 | Stellantis & Renault OEMs",
          "Industrial Hub": "Kenitra & Tangier",
          "Stage & Product (HS Code)": "Downstream EV Micromobility & Hybrid Assembly | HS 870380 / 870340",
          "CAPEX ($M)": "$1,500M",
          "Phase 1 vs. Full Target Capacity": "Active: 535k cars/yr Kenitra (135k EVs) + 400k Renault | Full: 1,000,000+ cars/yr",
          "Status (As of Nov 2026)": "Operational | Stellantis Kenitra expansion inaugurated Jul 16, 2025",
          "Verified Offtake & Local Value Added": "Direct OEM export to EU27 (#1 passenger car supplier to Europe, $17B in 2024). Local Content: 69% ."
        }
      ]
    },
    {
      "tableNumber": 3,
      "title": "Table 3",
      "columns": [
        "Risk Vector",
        "Severity & Probability",
        "Quantitative Exposure",
        "Root Technical / Regulatory Cause",
        "Actionable Mitigation Strategy"
      ],
      "rows": [
        {
          "Risk Vector": "1. Lithium & Nickel Import Bottleneck",
          "Severity & Probability": "High Severity | 100% Certainty",
          "Quantitative Exposure": "67,700 t/yr LCE & | 55,100 t/yr Ni Deficit",
          "Root Technical / Regulatory Cause": "Zero domestic lithium or primary nickel mining; exposure to sea-lane disruptions and volatile spot carbonate/MHP pricing.",
          "Actionable Mitigation Strategy": "Co-locate a merchant 40,000–60,000 t/yr spodumene-to-lithium carbonate conversion plant at Jorf Lasfar (utilizing OCP sulfuric acid and gypsum handling) and expand Guemassa/COBCO black-mass hydrometallurgy."
        },
        {
          "Risk Vector": "2. Copper & Manganese Conversion Gap",
          "Severity & Probability": "Medium-High | Active Structural Gap",
          "Quantitative Exposure": "52,000 t/yr Cu Foil & | 7,200 t/yr Mn Deficit",
          "Root Technical / Regulatory Cause": "Morocco mines 62 kt/yr Cu in concentrate (Tizert/Akka) and 25 kt/yr Mn in ore (Imini), but exports raw concentrates due to zero domestic smelter or HPMSM crystallizer.",
          "Actionable Mitigation Strategy": "Commission a dedicated hydrometallurgical/SX-EW or secondary copper refining unit in Tangier/Jorf Lasfar linked to Hailiang, and add an 8,000 t/yr Mn- metal / 25,000 t/yr HPMSM unit at Guemassa."
        },
        {
          "Risk Vector": "3. Anode Graphite Non-Originating Content",
          "Severity & Probability": "Medium-High | 2027 EU Rule Tightening",
          "Quantitative Exposure": "115,000 t/yr Uncoated | Graphite Imported",
          "Root Technical / Regulatory Cause": "Simple surface coating of imported spherical graphite may fail stricter EU PEM origin audits if value added falls below 40%–50%.",
          "Actionable Mitigation Strategy": "Ensure BTR and Shinzoom integrate full mechanical spheroidization, hydrofluoric/thermal purification, and high-temperature graphitization powered by Moroccan wind PPA to exceed 50% local value added."
        },
        {
          "Risk Vector": "4. US IRA PFE / MACR Disqualification",
          "Severity & Probability": "High for US Export | Low for EU27 Export",
          "Quantitative Exposure": "78% of Announced | CAPEX Has >25% CN Equity",
          "Root Technical / Regulatory Cause": "US IRC 30D/45X and July 2025 OBBBA rules disqualify JVs with ≥25% Chinese equity or effective control from US tax credits.",
          "Actionable Mitigation Strategy": "Segregate commercial strategies: route COBCO, Gotion, BTR, and Tinci output to EU27, UK, and MENA markets ; route OCP/NGB and Managem (0% PFE) or <25%-restructured JVs to US supply chains."
        },
        {
          "Risk Vector": "5. Industrial Water & Grid Wheeling Constraints",
          "Severity & Probability": "Medium Severity | Manageable via Desal",
          "Quantitative Exposure": "~18–25 Million m³/yr | Process Water Need",
          "Root Technical / Regulatory Cause": "Wet-chemical pCAM co-precipitation (COBCO) and copper foil electrodeposition (Hailiang) require ultra-pure deionized water in water-stressed basins.",
          "Actionable Mitigation Strategy": "Enforce 100% non-conventional water sourcing via OCP's Jorf Lasfar desalination hub and closed-loop zero-liquid-discharge (ZLD) sodium sulfate crystallization."
        }
      ]
    }
  ]
}
