"table_number","table_title","row_number","column_name","value" "1","Table 1","1","Material / Chemical Input","Purified Phosphoric Acid (PPA)" "1","Table 1","1","Battery Grade & HS Code","H3PO4 (≥99.99%) | HS 280920" "1","Table 1","1","Domestic Producer / Source","OCP Group (Jorf Lasfar & Safi)" "1","Table 1","1","Refined Domestic Supply (t/yr)","450,000" "1","Table 1","1","Full Pipeline Demand (t/yr)","118,000" "1","Table 1","1","Self-Sufficiency Ratio (%)","381.4%" "1","Table 1","1","Net Balance (t/yr)","+332,000" "1","Table 1","1","Bottleneck & Value-Chain Diagnosis","Structural Global Surplus: Covers 3.8x the 190 kt/yr LFP CAM pipeline (COBCO, BTR, LG/Huayou, NGB)." "1","Table 1","2","Material / Chemical Input","Battery-Grade Cobalt (Contained Co)" "1","Table 1","2","Battery Grade & HS Code","CoSO4.7H2O / Cathode | HS 283329 / 810520" "1","Table 1","2","Domestic Producer / Source","Managem (Bou Azzer + Guemassa Recycling)" "1","Table 1","2","Refined Domestic Supply (t/yr)","3,200" "1","Table 1","2","Full Pipeline Demand (t/yr)","7,200" "1","Table 1","2","Self-Sufficiency Ratio (%)","44.4%" "1","Table 1","2","Net Balance (t/yr)","-4,000" "1","Table 1","2","Bottleneck & Value-Chain Diagnosis","Partial Coverage / Pre-Committed: Up to 5,000 t/yr CoSO4 contracted to Renault; COBCO imports supplemental Co." "1","Table 1","3","Material / Chemical Input","Class-1 Battery Nickel (Contained Ni)" "1","Table 1","3","Battery Grade & HS Code","NiSO4.6H2O / MHP | HS 283324 / 750120" "1","Table 1","3","Domestic Producer / Source","Zero Primary Mine; Black Mass Only" "1","Table 1","3","Refined Domestic Supply (t/yr)","2,500" "1","Table 1","3","Full Pipeline Demand (t/yr)","57,600" "1","Table 1","3","Self-Sufficiency Ratio (%)","4.3%" "1","Table 1","3","Net Balance (t/yr)","-55,100" "1","Table 1","3","Bottleneck & Value-Chain Diagnosis","Critical Import Dependency: 95.7% imported as MHP/matte/sulfate via CNGR's Indonesian & global network." "1","Table 1","4","Material / Chemical Input","Lithium Carbonate Equivalent (LCE)" "1","Table 1","4","Battery Grade & HS Code","Li2CO3 / LiOH.H2O | HS 283691 / 282520" "1","Table 1","4","Domestic Producer / Source","Zero Active Mine/Refinery; Recycling Only" "1","Table 1","4","Refined Domestic Supply (t/yr)","800" "1","Table 1","4","Full Pipeline Demand (t/yr)","68,500" "1","Table 1","4","Self-Sufficiency Ratio (%)","1.2%" "1","Table 1","4","Net Balance (t/yr)","-67,700" "1","Table 1","4","Bottleneck & Value-Chain Diagnosis","Critical Import Dependency: 47.5 kt for LFP CAM + 16.5 kt for NMC + 4.5 kt for Tinci LiPF6 electrolyte." "1","Table 1","5","Material / Chemical Input","Refined Grade-A Copper (Foil Feed)" "1","Table 1","5","Battery Grade & HS Code","Cu Cathode (99.99%) | HS 740311 → 741011" "1","Table 1","5","Domestic Producer / Source","Managem Tizert/Akka (62 kt Cu in Conc.; 0 Smelter)" "1","Table 1","5","Refined Domestic Supply (t/yr)","0 | (62,000 mined)" "1","Table 1","5","Full Pipeline Demand (t/yr)","52,000" "1","Table 1","5","Self-Sufficiency Ratio (%)","0.0% Refined" "1","Table 1","5","Net Balance (t/yr)","-52,000" "1","Table 1","5","Bottleneck & Value-Chain Diagnosis","Smelting Gap: Morocco mines 119% of needed Cu in concentrate, but exports concentrate and imports cathode/scrap." "1","Table 1","6","Material / Chemical Input","Battery Manganese (Contained Mn)" "1","Table 1","6","Battery Grade & HS Code","HPMSM (MnSO4.H2O) | HS 283329" "1","Table 1","6","Domestic Producer / Source","Managem Imini (25 kt Mn in Ore; 0 HPMSM)" "1","Table 1","6","Refined Domestic Supply (t/yr)","0 | (25,000 mined)" "1","Table 1","6","Full Pipeline Demand (t/yr)","7,200" "1","Table 1","6","Self-Sufficiency Ratio (%)","0.0% HPMSM" "1","Table 1","6","Net Balance (t/yr)","-7,200" "1","Table 1","6","Bottleneck & Value-Chain Diagnosis","Chemical Refining Gap: Mined Mn ore exceeds demand by 3.5x, but lacks domestic HPMSM crystallization unit." "1","Table 1","7","Material / Chemical Input","Spherical / Synthetic Graphite" "1","Table 1","7","Battery Grade & HS Code","Coated Anode Graphite | HS 250410 / 380110" "1","Table 1","7","Domestic Producer / Source","None (Zero Domestic Graphite Mine/Furnace)" "1","Table 1","7","Refined Domestic Supply (t/yr)","0" "1","Table 1","7","Full Pipeline Demand (t/yr)","115,000" "1","Table 1","7","Self-Sufficiency Ratio (%)","0.0%" "1","Table 1","7","Net Balance (t/yr)","-115,000" "1","Table 1","7","Bottleneck & Value-Chain Diagnosis","100% Import Dependency: BTR (60 kt) & Shinzoom (45 kt) import flake/green coke for local coating/finishing." "2","Table 2","1","ID & Company / JV","MAR-BAT-01 | COBCO (Al Mada & CNGR)" "2","Table 2","1","Industrial Hub","Jorf Lasfar (El Jadida)" "2","Table 2","1","Stage & Product (HS Code)","Midstream NMC pCAM, LFP CAM & Recycling | HS 285390 / 284290" "2","Table 2","1","CAPEX ($M)","$2,000M" "2","Table 2","1","Phase 1 vs. Full Target Capacity","Phase 1: 40,000 t/yr NMC pCAM | Full: 120 kt pCAM + 60 kt LFP + 60 kt Recycling (~70 GWh)" "2","Table 2","1","Status (As of Nov 2026)","Operational | Commissioned Jan 2025; Inaugurated Jun 25, 2025" "2","Table 2","1","Verified Offtake & Local Value Added","Umicore multi-year NMC pCAM contract (signed Mar 28, 2025; deliveries early 2026). Est. Local VA: 44% ." "2","Table 2","2","ID & Company / JV","MAR-BAT-02 | Gotion Power Morocco" "2","Table 2","2","Industrial Hub","Kenitra Industrial Zone" "2","Table 2","2","Stage & Product (HS Code)","Downstream LFP/NMC Cells, Packs & BESS | HS 850760" "2","Table 2","2","CAPEX ($M)","$1,300M | ($5.6B+ Master)" "2","Table 2","2","Phase 1 vs. Full Target Capacity","Phase 1: 20 GWh/yr (10 GWh initial sub-phase) | Full: 100 GWh/yr + CAM/AAM" "2","Table 2","2","Status (As of Nov 2026)","Pre-Commissioning | CDG $280M equity; AfDB Jul 2026 loan; Q4 2026 launch" "2","Table 2","2","Verified Offtake & Local Value Added","Targeted EU/MENA automotive OEMs & ACWA Power 500 MW wind PPA. Est. Local VA: 52% ." "2","Table 2","3","ID & Company / JV","MAR-BAT-03 | BTR New Material Group" "2","Table 2","3","Industrial Hub","Tangier Tech & Kenitra" "2","Table 2","3","Stage & Product (HS Code)","Midstream Cathode (CAM) & Graphite Anode (AAM) | HS 284290 / 380110" "2","Table 2","3","CAPEX ($M)","$660M | ($300M + $360M)" "2","Table 2","3","Phase 1 vs. Full Target Capacity","Phase 1: 25 kt/yr CAM (Sep 2026) + 30 kt/yr AAM | Full: 50 kt/yr CAM + 60 kt/yr AAM" "2","Table 2","3","Status (As of Nov 2026)","Phase 1 Commissioning | Approved Mar & Sep 2024; Sept 2026 CAM milestone" "2","Table 2","3","Verified Offtake & Local Value Added","Export supply to European & global cell plants. 100% imported graphite feedstock. Est. Local VA: 38% ." "2","Table 2","4","ID & Company / JV","MAR-BAT-04 | Hunan Zhongke Shinzoom" "2","Table 2","4","Industrial Hub","Mohammed VI Tangier Tech City" "2","Table 2","4","Stage & Product (HS Code)","Midstream Spherical/Synthetic Graphite Anode | HS 380110" "2","Table 2","4","CAPEX ($M)","$460M" "2","Table 2","4","Phase 1 vs. Full Target Capacity","Phase 1: 20,000 t/yr AAM | Full: 40,000–50,000 t/yr AAM (20-ha site)" "2","Table 2","4","Status (As of Nov 2026)","Under Construction | Announced May 2024; 2,000 direct jobs planned" "2","Table 2","4","Verified Offtake & Local Value Added","Merchant anode supply for European cell gigafactories. Est. Local VA: 36% ." "2","Table 2","5","ID & Company / JV","MAR-BAT-05 | Hailiang Group Morocco" "2","Table 2","5","Industrial Hub","Mohammed VI Tangier Tech City" "2","Table 2","5","Stage & Product (HS Code)","Midstream Electrolytic Battery Copper Foil | HS 741011" "2","Table 2","5","CAPEX ($M)","$450M" "2","Table 2","5","Phase 1 vs. Full Target Capacity","Phase 1: 25,000 t/yr Cu Foil | Full: 50,000 t/yr Cu Foil + 35 kt Cu Semis" "2","Table 2","5","Status (As of Nov 2026)","Under Construction | 30-ha site in Tangier Tech; equipment installation" "2","Table 2","5","Verified Offtake & Local Value Added","Supplies Gotion Kenitra & EU cell plants. Imports refined Cu cathode/scrap. Est. Local VA: 34% ." "2","Table 2","6","ID & Company / JV","MAR-BAT-06 | Tinci Materials Morocco" "2","Table 2","6","Industrial Hub","Jorf Lasfar (El Jadida)" "2","Table 2","6","Stage & Product (HS Code)","Midstream Electrolyte & LiPF6 Salt | HS 382499 / 282690" "2","Table 2","6","CAPEX ($M)","$282M" "2","Table 2","6","Phase 1 vs. Full Target Capacity","Full Target: 150,000 t/yr Lithium-Ion Electrolytes (~140 GWh cell eq.)" "2","Table 2","6","Status (As of Nov 2026)","Approved / Early Build | Approved by Investment Commission Jun 2025" "2","Table 2","6","Verified Offtake & Local Value Added","Synergy with OCP phosphorus/fluorine at Jorf Lasfar; supplies Gotion & southern EU. Est. Local VA: 48% ." "2","Table 2","7","ID & Company / JV","MAR-BAT-07 | OCP Group / NGB / Mera" "2","Table 2","7","Industrial Hub","Jorf Lasfar & Benguerir" "2","Table 2","7","Stage & Product (HS Code)","Upstream PPA + LFP CAM + Utility LFP BESS | HS 280920 / 850760" "2","Table 2","7","CAPEX ($M)","$350M" "2","Table 2","7","Phase 1 vs. Full Target Capacity","Active: 450 kt PPA + 1 kt LFP Pilot + 25 MW / 125 MWh BESS | Full: 30 kt LFP (2027) + 1 GWh Packs" "2","Table 2","7","Status (As of Nov 2026)","Operational | 125 MWh Benguerir BESS energized Sep 16, 2026" "2","Table 2","7","Verified Offtake & Local Value Added","Captive OCP renewable firming (5 GW by 2027) + PPA supply to COBCO. Est. Local VA: 78% ." "2","Table 2","8","ID & Company / JV","MAR-BAT-08 | Managem Group" "2","Table 2","8","Industrial Hub","Bou Azzer, Guemassa & Tizert" "2","Table 2","8","Stage & Product (HS Code)","Upstream Cobalt Sulfate, Cu Conc. & Mn Ore | HS 283329 / 260300" "2","Table 2","8","CAPEX ($M)","$420M" "2","Table 2","8","Phase 1 vs. Full Target Capacity","Active: 3.2 kt/yr Co + 120 kt/yr Cu Conc. (Tizert) | Full: 5,000 t/yr CoSO4" "2","Table 2","8","Status (As of Nov 2026)","Operational | Bou Azzer active; Tizert Copper commissioned Q4 2025" "2","Table 2","8","Verified Offtake & Local Value Added","Renault (5,000 t/yr CoSO4 over 7 yrs from 2025); BMW (€100M+); Glencore JV. Est. Local VA: 88% ." "2","Table 2","9","ID & Company / JV","MAR-BAT-09 | LG Chem & Huayou (Youshan)" "2","Table 2","9","Industrial Hub","Jorf Lasfar / Atlantic Zone" "2","Table 2","9","Stage & Product (HS Code)","Midstream LFP Cathode Active Material | HS 284290" "2","Table 2","9","CAPEX ($M)","$400M" "2","Table 2","9","Phase 1 vs. Full Target Capacity","Full Target: 50,000 t/yr LFP CAM (~22 GWh cell eq.)" "2","Table 2","9","Status (As of Nov 2026)","FEED / Structuring | Adjusting JV equity to meet US IRA <25% PFE rule" "2","Table 2","9","Verified Offtake & Local Value Added","Targeted for LG Energy Solution North American & European LFP cell lines. Est. Local VA: 45% ." "2","Table 2","10","ID & Company / JV","MAR-BAT-10 | Stellantis & Renault OEMs" "2","Table 2","10","Industrial Hub","Kenitra & Tangier" "2","Table 2","10","Stage & Product (HS Code)","Downstream EV Micromobility & Hybrid Assembly | HS 870380 / 870340" "2","Table 2","10","CAPEX ($M)","$1,500M" "2","Table 2","10","Phase 1 vs. Full Target Capacity","Active: 535k cars/yr Kenitra (135k EVs) + 400k Renault | Full: 1,000,000+ cars/yr" "2","Table 2","10","Status (As of Nov 2026)","Operational | Stellantis Kenitra expansion inaugurated Jul 16, 2025" "2","Table 2","10","Verified Offtake & Local Value Added","Direct OEM export to EU27 (#1 passenger car supplier to Europe, $17B in 2024). Local Content: 69% ." "3","Table 3","1","Risk Vector","1. Lithium & Nickel Import Bottleneck" "3","Table 3","1","Severity & Probability","High Severity | 100% Certainty" "3","Table 3","1","Quantitative Exposure","67,700 t/yr LCE & | 55,100 t/yr Ni Deficit" "3","Table 3","1","Root Technical / Regulatory Cause","Zero domestic lithium or primary nickel mining; exposure to sea-lane disruptions and volatile spot carbonate/MHP pricing." "3","Table 3","1","Actionable Mitigation Strategy","Co-locate a merchant 40,000–60,000 t/yr spodumene-to-lithium carbonate conversion plant at Jorf Lasfar (utilizing OCP sulfuric acid and gypsum handling) and expand Guemassa/COBCO black-mass hydrometallurgy." "3","Table 3","2","Risk Vector","2. Copper & Manganese Conversion Gap" "3","Table 3","2","Severity & Probability","Medium-High | Active Structural Gap" "3","Table 3","2","Quantitative Exposure","52,000 t/yr Cu Foil & | 7,200 t/yr Mn Deficit" "3","Table 3","2","Root Technical / Regulatory Cause","Morocco mines 62 kt/yr Cu in concentrate (Tizert/Akka) and 25 kt/yr Mn in ore (Imini), but exports raw concentrates due to zero domestic smelter or HPMSM crystallizer." "3","Table 3","2","Actionable Mitigation Strategy","Commission a dedicated hydrometallurgical/SX-EW or secondary copper refining unit in Tangier/Jorf Lasfar linked to Hailiang, and add an 8,000 t/yr Mn- metal / 25,000 t/yr HPMSM unit at Guemassa." "3","Table 3","3","Risk Vector","3. Anode Graphite Non-Originating Content" "3","Table 3","3","Severity & Probability","Medium-High | 2027 EU Rule Tightening" "3","Table 3","3","Quantitative Exposure","115,000 t/yr Uncoated | Graphite Imported" "3","Table 3","3","Root Technical / Regulatory Cause","Simple surface coating of imported spherical graphite may fail stricter EU PEM origin audits if value added falls below 40%–50%." "3","Table 3","3","Actionable Mitigation Strategy","Ensure BTR and Shinzoom integrate full mechanical spheroidization, hydrofluoric/thermal purification, and high-temperature graphitization powered by Moroccan wind PPA to exceed 50% local value added." "3","Table 3","4","Risk Vector","4. US IRA PFE / MACR Disqualification" "3","Table 3","4","Severity & Probability","High for US Export | Low for EU27 Export" "3","Table 3","4","Quantitative Exposure","78% of Announced | CAPEX Has >25% CN Equity" "3","Table 3","4","Root Technical / Regulatory Cause","US IRC 30D/45X and July 2025 OBBBA rules disqualify JVs with ≥25% Chinese equity or effective control from US tax credits." "3","Table 3","4","Actionable Mitigation Strategy","Segregate commercial strategies: route COBCO, Gotion, BTR, and Tinci output to EU27, UK, and MENA markets ; route OCP/NGB and Managem (0% PFE) or <25%-restructured JVs to US supply chains." "3","Table 3","5","Risk Vector","5. Industrial Water & Grid Wheeling Constraints" "3","Table 3","5","Severity & Probability","Medium Severity | Manageable via Desal" "3","Table 3","5","Quantitative Exposure","~18–25 Million m³/yr | Process Water Need" "3","Table 3","5","Root Technical / Regulatory Cause","Wet-chemical pCAM co-precipitation (COBCO) and copper foil electrodeposition (Hailiang) require ultra-pure deionized water in water-stressed basins." "3","Table 3","5","Actionable Mitigation Strategy","Enforce 100% non-conventional water sourcing via OCP's Jorf Lasfar desalination hub and closed-loop zero-liquid-discharge (ZLD) sodium sulfate crystallization."