"table_number","table_title","row_number","column_name","value" "1","Table 1","1","Country & Power Pool","1. Nigeria | WAPP (TCN & 11 DisCos)" "1","Table 1","1","HS 8504 Imports / Exports ($M)","Imp: $391.0M | Exp: $0.36M" "1","Table 1","1",">10 MVA LPT Imports (HS 850423)","$158.0M | (40.4% share)" "1","Table 1","1","Max Qualified Local Rating","33 kV / | 15 MVA" "1","Table 1","1","Tier 1 (≤36 kV) Import Dep.","72.0%" "1","Table 1","1","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","1","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","1","Qualified Local Manufacturers & Structural Gap Diagnosis","Elsewedy Nigeria, EMCON: Zero local 132/330 kV LPT plants; relies on India (29%), China (27%), Germany (21%), Turkey (9.6%)." "1","Table 1","2","Country & Power Pool","2. Egypt | COMELEC / EETC" "1","Table 1","2","HS 8504 Imports / Exports ($M)","Imp: $347.6M | Exp: $60.5M" "1","Table 1","2",">10 MVA LPT Imports (HS 850423)","$112.0M | (Special EHV)" "1","Table 1","2","Max Qualified Local Rating","500 kV / | 500 MVA" "1","Table 1","2","Tier 1 (≤36 kV) Import Dep.","8.0%" "1","Table 1","2","Tier 2 (66–132 kV) Import Dep.","18.0%" "1","Table 1","2","Tier 3 (220–765 kV) Import Dep.","42.0%" "1","Table 1","2","Qualified Local Manufacturers & Structural Gap Diagnosis","Elsewedy (250 MVA/220 kV), XD-EGEMAC (500 kV), EGYTRAFO: Continental exporter; imports limited to >500 MVA/HVDC & 100% GOES/OLTC." "1","Table 1","3","Country & Power Pool","3. South Africa | SAPP (NTCSA / Eskom)" "1","Table 1","3","HS 8504 Imports / Exports ($M)","Imp: $418.0M | Exp: $84.2M" "1","Table 1","3",">10 MVA LPT Imports (HS 850423)","$134.0M | (TDP Surge)" "1","Table 1","3","Max Qualified Local Rating","765 kV / | 800 MVA" "1","Table 1","3","Tier 1 (≤36 kV) Import Dep.","12.0%" "1","Table 1","3","Tier 2 (66–132 kV) Import Dep.","22.0%" "1","Table 1","3","Tier 3 (220–765 kV) Import Dep.","48.0%" "1","Table 1","3","Qualified Local Manufacturers & Structural Gap Diagnosis","ACTOM + SGB-SMIT Power Matla (Merged Oct 2025), Zest WEG: Highest rating in Africa, but NTCSA accredited 22 foreign plants for 133 GVA plan." "1","Table 1","4","Country & Power Pool","4. Ethiopia | EAPP (EEP & EEU)" "1","Table 1","4","HS 8504 Imports / Exports ($M)","Imp: $135.3M | Exp: $0.21M" "1","Table 1","4",">10 MVA LPT Imports (HS 850423)","$14.3M | ($21M ≤650kVA)" "1","Table 1","4","Max Qualified Local Rating","33 kV / | 5 MVA" "1","Table 1","4","Tier 1 (≤36 kV) Import Dep.","68.0%" "1","Table 1","4","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","4","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","4","Qualified Local Manufacturers & Structural Gap Diagnosis","Ethio-Engineering Group: FX bottlenecks constrain local DTR output; 100% of 132–500 kV (incl. 750 MVA Holeta units) imported." "1","Table 1","5","Country & Power Pool","5. Kenya | EAPP / EAC (KETRACO/KPLC)" "1","Table 1","5","HS 8504 Imports / Exports ($M)","Imp: $118.5M | Exp: $2.40M" "1","Table 1","5",">10 MVA LPT Imports (HS 850423)","$42.0M | (132–400 kV)" "1","Table 1","5","Max Qualified Local Rating","33 kV / | 2.5 MVA" "1","Table 1","5","Tier 1 (≤36 kV) Import Dep.","64.0%" "1","Table 1","5","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","5","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","5","Qualified Local Manufacturers & Structural Gap Diagnosis","Local Workshops (KenGen Plant Planned): KPLC ordered 3,319 urgent DTRs (Apr 2025); relies on TANELEC (TZ), UAE, India & China." "1","Table 1","6","Country & Power Pool","6. Morocco | COMELEC (ONEE & SRMs)" "1","Table 1","6","HS 8504 Imports / Exports ($M)","Imp: $245.0M | Exp: $38.0M" "1","Table 1","6",">10 MVA LPT Imports (HS 850423)","$88.0M | (225/400 kV)" "1","Table 1","6","Max Qualified Local Rating","60 kV / | 40 MVA" "1","Table 1","6","Tier 1 (≤36 kV) Import Dep.","25.0%" "1","Table 1","6","Tier 2 (66–132 kV) Import Dep.","75.0%" "1","Table 1","6","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","6","Qualified Local Manufacturers & Structural Gap Diagnosis","Nexans Maroc: Strong in 20–60 kV distribution/medium units, but 100% dependent on EU/Asian imports for 225 kV & 400 kV LPTs." "1","Table 1","7","Country & Power Pool","7. Algeria | COMELEC (Sonelgaz)" "1","Table 1","7","HS 8504 Imports / Exports ($M)","Imp: $164.0M | Exp: $4.80M" "1","Table 1","7",">10 MVA LPT Imports (HS 850423)","$76.0M | (220/400 kV)" "1","Table 1","7","Max Qualified Local Rating","60 kV / | 40 MVA*" "1","Table 1","7","Tier 1 (≤36 kV) Import Dep.","14.0%" "1","Table 1","7","Tier 2 (66–132 kV) Import Dep.","55.0%" "1","Table 1","7","Tier 3 (220–765 kV) Import Dep.","95.0%*" "1","Table 1","7","Qualified Local Manufacturers & Structural Gap Diagnosis","Electro-Industries Azazga, Elsewedy Algeria: *Vijai Electricals Algerie JV in Azazga building 40–315 MVA / 400 kV plant to close HV gap." "1","Table 1","8","Country & Power Pool","8. Tanzania | EAPP / SAPP (TANESCO)" "1","Table 1","8","HS 8504 Imports / Exports ($M)","Imp: $62.0M | Exp: $28.5M" "1","Table 1","8",">10 MVA LPT Imports (HS 850423)","$29.0M | (132–400 kV)" "1","Table 1","8","Max Qualified Local Rating","36 kV / | 20 MVA" "1","Table 1","8","Tier 1 (≤36 kV) Import Dep.","10.0%" "1","Table 1","8","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","8","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","8","Qualified Local Manufacturers & Structural Gap Diagnosis","TANELEC Arusha (14,000/yr, $15M expansion) & Elsewedy TZ (2,500/yr): East Africa's DTR export hub, but imports 100% of >36 kV LPTs." "1","Table 1","9","Country & Power Pool","9. Zimbabwe | SAPP (ZETDC / ZESA)" "1","Table 1","9","HS 8504 Imports / Exports ($M)","Imp: $58.5M | Exp: $0.82M" "1","Table 1","9",">10 MVA LPT Imports (HS 850423)","$7.17M | (132–400 kV)" "1","Table 1","9","Max Qualified Local Rating","33 kV / | 5 MVA" "1","Table 1","9","Tier 1 (≤36 kV) Import Dep.","62.0%" "1","Table 1","9","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","9","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","9","Qualified Local Manufacturers & Structural Gap Diagnosis","ZESA Enterprises: Scaling local distribution assembly, but relies on South Africa, China & India for majority of grid fleet." "1","Table 1","10","Country & Power Pool","10. Ghana | WAPP (GRIDCo & ECG)" "1","Table 1","10","HS 8504 Imports / Exports ($M)","Imp: $36.2M | Exp: $0.85M" "1","Table 1","10",">10 MVA LPT Imports (HS 850423)","$14.5M | (161/330 kV)" "1","Table 1","10","Max Qualified Local Rating","33 kV / | 2.5 MVA" "1","Table 1","10","Tier 1 (≤36 kV) Import Dep.","82.0%" "1","Table 1","10","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","10","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","10","Qualified Local Manufacturers & Structural Gap Diagnosis","Elsewedy Ghana (Cables/Service): Near-total reliance on imported transformers for ECG 11/33 kV and GRIDCo 161/330 kV substations." "1","Table 1","11","Country & Power Pool","11. Zambia | SAPP (ZESCO & CEC)" "1","Table 1","11","HS 8504 Imports / Exports ($M)","Imp: $28.2M | Exp: $1.56M" "1","Table 1","11",">10 MVA LPT Imports (HS 850423)","$1.19M | (+66–330 kV)" "1","Table 1","11","Max Qualified Local Rating","33 kV / | 10 MVA" "1","Table 1","11","Tier 1 (≤36 kV) Import Dep.","35.0%" "1","Table 1","11","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","11","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","11","Qualified Local Manufacturers & Structural Gap Diagnosis","Elsewedy Lusaka & TANELEC Ndola: Strong local ≤33 kV coverage, but Copperbelt 66–330 kV mining substations are 100% imported." "1","Table 1","12","Country & Power Pool","12. Rwanda, Malawi & Botswana | Landlocked Benchmark" "1","Table 1","12","HS 8504 Imports / Exports ($M)","Imp: $59.8M | Exp: $0.95M" "1","Table 1","12",">10 MVA LPT Imports (HS 850423)","$4.94M | (132–400 kV)" "1","Table 1","12","Max Qualified Local Rating","0 kV / | 0 MVA" "1","Table 1","12","Tier 1 (≤36 kV) Import Dep.","100.0%" "1","Table 1","12","Tier 2 (66–132 kV) Import Dep.","100.0%" "1","Table 1","12","Tier 3 (220–765 kV) Import Dep.","100.0%" "1","Table 1","12","Qualified Local Manufacturers & Structural Gap Diagnosis","Zero Type-Tested Factories: Representative of ~38 African countries importing 100% of transformers from SA, TZ, Egypt, China & India." "2","Table 2","1","Component / Input","1. Copper Winding Wire & CTC" "2","Table 2","1","HS Code","740811 / 854411" "2","Table 2","1","LPT Cost Share (%)","28.0%" "2","Table 2","1","African Domestic Share (%)","45.0%" "2","Table 2","1","African Import Dep. (%)","55.0%" "2","Table 2","1","Dominant Global Suppliers","Elsewedy (EG), Actom/CBI (ZA); imported CTC from Europe/China" "2","Table 2","1","Technical Barrier to African Localization","Standard magnet wire is drawn locally in Egypt and South Africa, but multi-strand epoxy-bonded Continuously Transposed Conductors (CTC) for >100 MVA LPTs are imported." "2","Table 2","2","Component / Input","2. Grain-Oriented Electrical Steel (GOES)" "2","Table 2","2","HS Code","722511 / 722611" "2","Table 2","2","LPT Cost Share (%)","26.5%" "2","Table 2","2","African Domestic Share (%)","0.0%" "2","Table 2","2","African Import Dep. (%)","100.0%" "2","Table 2","2","Dominant Global Suppliers","Nippon Steel, Baosteel, Thyssenkrupp, POSCO, NLMK, Cleveland-Cliffs" "2","Table 2","2","Technical Barrier to African Localization","Requires 1,200°C slab reheating, multi-stage cold rolling to 0.23 mm, decarburization, MgO coating, and laser domain scribing; zero African steel mills have GOES lines." "2","Table 2","3","Component / Input","3. Tank, Radiators, Assembly & Testing" "2","Table 2","3","HS Code","730890 / 850490" "2","Table 2","3","LPT Cost Share (%)","15.5%" "2","Table 2","3","African Domestic Share (%)","88.0%" "2","Table 2","3","African Import Dep. (%)","12.0%" "2","Table 2","3","Dominant Global Suppliers","Elsewedy, XD-EGEMAC, ACTOM/SSPM, TANELEC, Electro-Industries" "2","Table 2","3","Technical Barrier to African Localization","Fully localized in qualified plants: structural plate welding, corrugated fin forming, core slitting/stacking, vapor-phase drying, and IEC 60076 routine testing." "2","Table 2","4","Component / Input","4. On-Load Tap Changers (OLTCs)" "2","Table 2","4","HS Code","853590 / 850490" "2","Table 2","4","LPT Cost Share (%)","12.0%" "2","Table 2","4","African Domestic Share (%)","0.0%" "2","Table 2","4","African Import Dep. (%)","100.0%" "2","Table 2","4","Dominant Global Suppliers","Maschinenfabrik Reinhausen (MR), Hitachi Energy, Huaming" "2","Table 2","4","Technical Barrier to African Localization","High-precision vacuum interrupter switching mechanisms rated for 300,000+ energized operations without arcing failure; zero OEM assembly in Africa." "2","Table 2","5","Component / Input","5. HV Condenser Bushings & Pressboard" "2","Table 2","5","HS Code","854620 / 480593" "2","Table 2","5","LPT Cost Share (%)","10.5%" "2","Table 2","5","African Domestic Share (%)","5.0%" "2","Table 2","5","African Import Dep. (%)","95.0%" "2","Table 2","5","Dominant Global Suppliers","Pfisterer, LAPP, Trench, Hitachi Energy, Weidmann (Pressboard)" "2","Table 2","5","Technical Barrier to African Localization","Egypt (ECMEI) produces porcelain up to 72.5 kV, but 100% of graded-capacitance RIP/RIS condenser bushings (≥132–765 kV) and virgin electrical Kraft pressboard are imported." "2","Table 2","6","Component / Input","6. Dielectric Mineral & Ester Fluids" "2","Table 2","6","HS Code","271019 / 382499" "2","Table 2","6","LPT Cost Share (%)","7.5%" "2","Table 2","6","African Domestic Share (%)","18.0%" "2","Table 2","6","African Import Dep. (%)","82.0%" "2","Table 2","6","Dominant Global Suppliers","Nynas, Apar Industries, Savita, Cargill (FR3), M&I Materials (Midel)" "2","Table 2","6","Technical Barrier to African Localization","Requires hydrotreated naphthenic base oils free of corrosive sulfur (IEC 60296) or refined natural/synthetic esters (IEC 62770); mostly imported in bulk ISO tanks."