architecture,chemistry_class,thickness_um,current_density_a_cm2,cell_voltage_v,active_area_m2_per_100mw,specific_energy_kwh_per_kg,bare_membrane_usd_per_m2,ionomer_ink_usd_per_m2,combined_polymer_usd_per_m2,polymer_bom_100mw_usd_m,polymer_cost_usd_per_kw,annual_h2_output_tonnes,elec_cost_usd_per_kg_h2,stack_life_hours,stack_replacements_20yr,lifetime_polymer_spend_usd_m,qualification_lead_months,pfas_regulatory_exposure Extruded Thick PFSA (Nafion N117 Class),Long-Side-Chain PFSA (Fluorinated),183,2.00,1.90,26316,54.8,260.00,65.00,325.00,8.55,85.53,8211.7,2.466,60000,0.50,12.83,24,High (PFSA fluoropolymer + monomer synthesis) Reinforced Thin PFSA (ePTFE + SSC Ionomer),Short-Side-Chain PFSA + ePTFE (Fluorinated),65,3.00,1.80,18519,51.4,340.00,85.00,425.00,7.87,78.71,8754.9,2.313,75000,0.20,9.44,30,High (PFSA + ePTFE fluoropolymer) Non-Fluorinated Hydrocarbon PEM (Pemion Class),Sulfonated Aromatic Hydrocarbon (PFAS-Free),60,2.50,1.84,21739,52.6,210.00,55.00,265.00,5.76,57.61,8555.1,2.367,45000,1.00,11.52,36,Zero (PFAS-free hydrocarbon backbone) Alkaline Composite Diaphragm (Zirfon UTP Class),ZrO2 / Polysulfone Porous Separator (PFAS-Free),220,0.80,1.85,67568,53.2,58.00,0.00,58.00,3.92,39.19,8458.6,2.394,80000,0.13,4.41,14,Zero (PFAS-free polysulfone/ZrO2) Anion Exchange Membrane (DURAION / Aemion Class),Polymeric AEM (PFAS-Free),65,1.50,1.88,35461,53.9,195.00,45.00,240.00,8.51,85.11,8348.8,2.426,35000,1.57,21.88,30,Zero (PFAS-free quaternary ammonium polymer)