archetype_id,scenario,voltage_class_kv,transformer_rating_mva,application,bushing_spec,bushing_units_per_lpt,lpt_factory_capex_musd,bushing_set_cost_kusd,bushing_bom_share_pct,pre_2020_lead_weeks,current_2026_lead_weeks,lead_time_multiplier_x,gated_asset_mw,six_month_delay_exposure_musd,delay_to_bushing_cost_ratio_x,spare_set_capex_kusd,spare_3yr_carry_7pct_wacc_kusd,spare_3yr_carry_9pct_wacc_kusd,spare_3yr_carry_12pct_wacc_kusd,delay_to_3yr_spare_carry_9pct_x,sec301_25pct_tariff_delta_kusd,cashflow_assumption_note LPT-230,Base,230,250,Regional Utility Substation LPT (230/69 kV),3x 230 kV RIP/Silicone + 3x 69 kV + 1x Neutral,7,4.50,150.0,3.33,45,85,1.89,150,11.50,76.7,115.0,29.3,36.2,46.6,317.7,37.5,"Illustrative $35/MWh redispatch & congestion penalty at 50% load factor (6 mo = 4,380 h)" DC-345,Conservative,345,400,100 MW IT AI Campus Interconnect LPT (345/34.5 kV),3x 345 kV RIP/Silicone + 3x 34.5 kV + 1x Neutral,7,8.40,285.0,3.39,52,130,2.50,100,39.60,138.9,260.0,66.3,81.9,105.3,483.5,71.3,Illustrative $120/kW-mo wholesale colo rate at 55% EBITDA margin (6 mo) DC-345,Base,345,400,100 MW IT AI Campus Interconnect LPT (345/34.5 kV),3x 345 kV RIP/Silicone + 3x 34.5 kV + 1x Neutral,7,8.40,285.0,3.39,52,130,2.50,100,44.55,156.3,260.0,66.3,81.9,105.3,544.0,71.3,Illustrative $135/kW-mo wholesale colo rate at 55% EBITDA margin (6 mo) DC-345,High,345,400,100 MW IT AI Campus Interconnect LPT (345/34.5 kV),3x 345 kV RIP/Silicone + 3x 34.5 kV + 1x Neutral,7,8.40,285.0,3.39,52,130,2.50,100,49.50,173.7,260.0,66.3,81.9,105.3,604.4,71.3,Illustrative $150/kW-mo wholesale colo rate at 55% EBITDA margin (6 mo) GSU-500,Base,500,500,500 MW Power Plant / Hydro GSU Bank (500/22 kV),3x 500 kV RIP/Silicone + 1x Neutral + 3x High-Current LV,7,12.50,590.0,4.72,60,140,2.33,500,38.33,65.0,515.0,131.3,162.2,208.6,236.3,147.5,"Illustrative $25/MWh gross spark/capacity margin at 70% capacity factor (6 mo = 4,380 h)" TX-765,Base,765,750,765/345 kV Bulk Transmission Autotransformer Bank,3x 765 kV RIP/Silicone + 3x 345 kV RIP + 1x Neutral,7,19.50,1180.0,6.05,72,156,2.17,600,34.69,29.4,920.0,234.6,289.8,372.6,119.7,295.0,"Illustrative $22/MWh corridor congestion & curtailment penalty at 60% load (6 mo = 4,380 h)"